Line 20 (Shenzhen Metro) Explained

Other Name:Fuyong line
Mapcolor: Cyan (#)
Type:Rapid transit
System:Shenzhen Metro
Status:Operational
Locale:Shenzhen, China
Stations:5 (Phase 1)
Operator:SZMC (Shenzhen Metro Group)
Character:Underground
Stock:CRRC Changchun (2001-2009) (Type A, 8 cars)
Owner:Shenzhen Metro Group
Linelength:8.432NaN2 (Phase 1)[1]
Tracks:Double-track
Electrification: (overhead lines)
Map State:collapsed

Line 20 is a rapid transit line in the Shenzhen Metro system. The line connects with the .[2] [3] [4]

Construction started on 24 November 2016.[5] The National Development and Reform Commission approved the project in March 2020.[6] It opened on 28 December 2021,[7] after being delayed since 2018.

Stations

Station name[8] ConnectionsNearby bus stopsDistance
Location
0.00.0Bao'an
1.61.6
0.82.4
1.33.7
SZX4.48.1

Phase 2

Station nameConnectionsLocation
Bao'an
Nanshan
Under Planning (Phase 2 remaining section)
Window of the WorldNanshan
Xiangmihu WestFutian
Futian Convention & Exhibition Centre
Huanggang Checkpoint
Futian Checkpoint
Futian Bonded Area South

Rolling stock

Line 20 currently uses 9 sets of Size A subway trains in eight car sets (no. 2001–2009) with a maximum speed of 120km/h. It's the first time that Shenzhen Metro use GoA4 automatic train operation. The GoA4 construction standard is applied to Phase I of Shenzhen Metro Line 20, which can fully achieve the automatic operation of unattended trains after opening, and the trains can also automatically sleep, wake up and conduct self inspection. In addition, the train also has more than ten functions, such as train stop control, door platform door alignment isolation, etc.[9]

Notes and References

  1. Web site: 深圳地铁四期建设规划调整方案获批. 2020-04-11.
  2. Web site: 深圳市地铁20号线全线开工. 2016-11-24.
  3. Web site: 深圳国际会展中心配套市政项目总体设计专家评审会顺利召开. www.mp.weixin.qq.com. 2016-07-08.
  4. News: Shenzhen World now connected by Metro Line 20. Exhibition World. 23 October 2023. 6 January 2022. Paul. Colston. https://web.archive.org/web/20220202142943/https://www.exhibitionworld.co.uk/shenzhen-world-now-connected-by-metro-line-20. 2 February 2022. live.
  5. Web site: 深圳市地铁20号线全线开工. 2016-11-24.
  6. Web site: 国家发展改革委关于调整深圳市城市轨道交通第四期建设规划方案的批复. 2020-03-26. 2020-04-26.
  7. News: 铁建南方领导到20号线检查工作. 铁建南方.
  8. Web site: 市规划和自然资源局关于深圳市城市轨道交通20号线交通详细规划(草案)的公示. 2021-11-22.
  9. Web site: 无人驾驶!20号线一期首列车本月抵深,通车时间为……. 2021-04-15.