Line 2 (Chongqing Rail Transit) Explained

Type:Straddle-beam monorail rapid transit
System:Chongqing Rail Transit
Stations:25
Daily Ridership:234,200 (2014 Daily Avg.)[1]
350,000 (2016 Peak)[2]
Operator:Chongqing Rail Transit Corp., Ltd
Stock:Changchun Hitachi Monorail QKZ2, CCD
Linelength Km:31.3
Speed Km/H:75

Line 2 of CRT runs southeastward from to . Line 2 began operation as the first metro line in the West of China on 18 June 2005. It was subsequently expanded 1 June 2006 from to Xinshancun, and on 30 December 2014 to Yudong. The line was China's first heavy monorail line, built using Japan's ODA and Hitachi Monorail technology. On 24 April 2022, all original Hitachi trains were officially retired in favor of domestically produced rolling stock.[3] [4]

Line 2, which currently runs 29.9km (18.6miles) and services 25 stations, begins as a subway under downtown Jiefangbei, then runs west along the southern bank of the Jialing River on an elevated line, and then turns south into the city's southwestern inner suburbs, looping back east to terminate at Yudong in Ba'nan.

Rolling stock

QKZ2

As the first heavy monorail system in China, the original rolling stock, named QKZ2, was identical to Osaka Monorail 2000 series. These trains were introduced in 2004 and retired in 2022.[4] [3]

CCD

Domestically-produced CCD series trains are available in 8-car trainsets, replacing earlier 4-car trainsets. The top speed is 80km/h and maximum capacity is 1802 passengers.The exterior features a streamlined design with a two-tone color scheme inspired by the scenery in Chongqing.

The interior features 43.1inch animated displays and LED scrolling displays, showing information such as the map and the current stop.

The trains support automatic train operation.

Opening timeline

SegmentCommencementLengthStation(s)Name
Daping  - Chongqing Zoo6 November 20044.952NaN25Phase 1 (initial section)
Jiaochangkou  - Daping11 December 20047.662NaN23Phase 1 (final section)
Linjiangmen, Niujiaotuo, Liziba28 December 2004Infill stations3
Fotuguan9 April 2005Infill station1
Zengjiayan15 June 2005Infill station1
Chongqing Zoo  - Xinshancun1 July 20065.542NaN25Phase 2
Xinshancun  - Yudong30 December 201413.152NaN27Southern extension

Service routes

Current stations

Service
routes
Station
Station nameConnectionsDistance
Location
-0.00Yuzhong
0.700.70
1.201.90
0.702.60
0.803.40
1.054.45
1.005.45
0.706.15
1.607.75
1.609.35Jiulongpo
1.2010.55
1.3011.85
1.0012.85
1.0513.90
1.1515.05
1.0516.10Dadukou
1.1017.20
1.2018.40
0.7519.15
1.9021.05
1.3022.35
1.3523.70
1.7025.40
3.7029.10Banan
1.2030.30

Notes and References

  1. Web site: 重庆轨道3号线成世界上最繁忙的单轨线. 国际在线. 2014-11-21. dead. https://web.archive.org/web/20141205072828/http://cq.cri.cn/115/2014/11/21/5s720.htm. 2014-12-05.
  2. Web site: 重庆轨道客运量9月30日创新高 达到257.4万乘次.
  3. Web site: 浅谈重庆轨道交通2号线的前世今生. 直江 Naoe. 2023-12-06.
  4. Web site: 单轨2号线8编组列车空载调试. 2022-03-16. 重庆发布. 2023-07-28. 2023-07-28. https://web.archive.org/web/20230728050241/https://mp.weixin.qq.com/s?__biz=MzA4MzA0MTA4NA

    &mid=2658485248&idx=1&sn=83c5138a7bcf39bb3db87cc3b3359fa9&chksm=847d6a53b30ae3450285e1248a0909bfa6dc88d02e03297f11d89a3d06b8e209e65aa2308f2c&scene=27

    .