Line 1 (Zhengzhou Metro) Explained

Type:Rapid transit
System:Zhengzhou Metro
Status:Operational
Locale:Zhengzhou, Henan, China
Stations:30
Open:[1]
Owner:Zhengzhou
Operator:Zhengzhou Metro Group Corporation
Character:Underground
Depot:Zhengdong Depot
Kaixuan Road Stabling Yard
Linelength:41.22NaN2
Tracks:2
Electrification:Overhead lines (1500 volts)
Map State:collapsed

Line 1 of the Zhengzhou Metro is a rapid transit line running from west to east Zhengzhou. It opened on the 28 December 2013. This line is currently 41.2 km long with 30 stations.[2]

Opening timeline

Phase 1 of Line 1 opened on 28 December 2013. Phase 1 of Line 1 is 26.22NaN2 in length.

Phase 2 of Line 1 opened on 12 January 2017 extending terminals on both ends with additional seven stations (9.65 km) on the western end and two stations (5.36 km) on the eastern end.[3]

SegmentCommencementLengthStation(s)Name
Xiliuhu — Zhengzhou Sports Center28 December 201326.22NaN2[4] 20Phase 1
Henan University of Technology — Xiliuhu12 January 20179.652NaN2[5] 7Phase 2
Zhengzhou Sports Center — Wenyuanbeilu12 January 20175.362NaN22
Wenyuanbeilu — New Campus of Henan University21 November 2019[6] 1

Stations

Service
routes
Station
Station nameConnectionsDistance
Location
0114 Zhengzhou BRT Route B2Zhongyuan
0115
0116
0117
0118
0119
0120
0121
0122
0123 Zhengzhou BRT Route B1
0124
0125
0126Erqi
0127
0128 ZZF
0129
0130
0131Jinshui
0132
0133
0134
0135
0136
0137
0138 ZAF Zhengzhou BRT Route B5
0139
0140
0141
0142
0143

Notes and References

  1. Web site: 郑州地铁1号线今日正式试运营 开启中原城市新格局. 2013-12-28.
  2. Web site: 郑州市轨道交通1号线35KV及以下供电系统设施2020—2022年委外维修项目比选公告. 2019-09-24. 郑州市轨道交通1号线全长41.2km,设站30座,均为地下车站。其中,1号线一期工程线路长约26.2km,设站20座...1号线二期工程线路全长约15 km,设站10座....
  3. Web site: 郑州地铁1号线二期开门“迎客” 东边冷清西边热闹. Xinhua. 18 January 2017. Chinese.
  4. Web site: 中原首条地铁载客运营 古城郑州驶入地铁时代. 2013-12-29.
  5. Web site: 与城市发展“赛跑” 郑州地铁进入3.0时代. gmw.cn. 2017-01-12.
  6. News: 开了!郑州地铁河南大学新区站将于明天上午10点正式启用 . 2019-11-21 . Henan Daily . 2019-11-20 . zh-cn.