Line 1 (Shijiazhuang Metro) Explained
|
Type: | Rapid transit |
System: | Shijiazhuang Metro |
Status: | Operational |
Locale: | Shijiazhuang, Hebei, China |
Start: | Xiwang - Fuze (current) Huai'anlu - Dongyang (future) |
Stations: | 26 (current) 30 (future) |
Routes: | 1 |
Owner: | Shijiazhuang |
Operator: | Shijiazhuang Metro Corporation |
Character: | Underground |
Linelength: | 34.31NaN1 (current) |
Tracks: | 2 |
Map State: | collapsed |
Line 1 of the Shijiazhuang Metro is a rapid transit line in Shijiazhuang, Hebei province, China. Currently it is 34.3km (21.3miles) long with 26 stations. The line opened on 26 June 2017.
History
- Phase 1Phase 1 of the line began construction on 1 July 2013 and began service on 26 June 2017, completed at a cost of ¥18.892 billion.[1]
- Phase 2 initial sectionThe Phase II of Line 1 is 13.4951NaN1[2] with 8 stations.[3] Only 6 stations from Xiaohedadao to Fuze (10.4 km[4]) opened on 26 June 2019.
- Phase 2 North sectionTwo more stations, Dongshangze and Dongyang will open later. The section is 3.1 km in length with 2 stations.[5] The section will open in 2024.
- Phase 3 (Southwest extension)The Phase 3 will add two more stations (Huai'anlu and Shangzhuang) in Southwest of the line. The extension is under planning.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|
Xiwang — Xiaohedadao | 26 June 2017 | 23.91NaN1[6] | 20 | Phase 1 |
Xiaohedadao — Fuze | 26 June 2019 | 10.41NaN1 | 6 | Phase 2 (initial section) | |
Stations
Rolling stock
Services are provided by CRRC Tangshan Type A rolling stock, which are operated in six-car sets that hold up to 2520 passengers each.[6]
Notes and References
- News: . 26 June 2017 . zh:石家庄地铁1号线建成通车 "高颜值"地铁首次驶进石家庄 . zh . China.com . http://news.china.com/news100/11038989/20170626/30835311_all.html . dead . 28 December 2017 . https://web.archive.org/web/20171228112318/http://news.china.com/news100/11038989/20170626/30835311_all.html . 28 December 2017.
- News: 2019-05-22 . zh:石家庄地铁1号线二期工程顺利通过单位工程竣工验收(组图) . zh . http://build.workercn.cn/33129/201905/22/190522150556817.shtml . dead . 2019-05-26 . https://web.archive.org/web/20190526233008/http://build.workercn.cn/33129/201905/22/190522150556817.shtml . 2019-05-26 . zh:中工城建.
- Web site: . 30 August 2017 . zh:石家庄地铁1号3号线二期最新规划 2019年通车 . http://www.sohu.com/a/168349764_124665 . live . https://web.archive.org/web/20171228112322/http://www.sohu.com/a/168349764_124665 . 28 December 2017 . 28 December 2017 . zh . zh:搜狐.
- News: 2019-06-09 . zh:石家庄地铁1号线二期先开通这6座车站,票价确定 . zh . http://hebei.hebnews.cn/2019-06/09/content_7415427.htm . live . 2021-11-28 . https://web.archive.org/web/20190630215707/http://hebei.hebnews.cn/2019-06/09/content_7415427.htm . 2019-06-30 . zh:河北新闻网.
- Web site: 开工!石家庄地铁1号线二期北段工程启动. 本次开工的1号线二期北段工程,即东上泽站至东洋站以及南牛停车场建设,线路长度3.1公里,预计工期三年.
- Web site: 2017-06-27 . zh:石家庄地铁开通 河北正式迈入"地铁时代" . http://www.cnr.cn/hebei/jrhb/20170627/t20170627_523821373.shtml . live . https://web.archive.org/web/20170802083342/http://www.cnr.cn/hebei/jrhb/20170627/t20170627_523821373.shtml . 2017-08-02 . 2019-05-26 . CNR . zh.