Line 1 (Guiyang Metro) Explained

Type:Rapid transit
System:Guiyang Metro
Status:Operational
Locale:Guiyang, Guizhou Province, China
Stations:25
Operator:Guiyang Urban Rail Transit (GYURT)
Character:Underground & Elevated
Electrification:Overhead line
Depot:2
Linelength:35.112NaN2[1] [2]
Tracks:2
Speed:80 km/h
Website:http://www.gyurt.com/
Map State:collapsed

Line 1 of the Guiyang Metro, is a subway line in Guiyang.

The northern section (Guanshanhu section) opened on December 28, 2017.[3] The northern section has 10 stations and is 12.9km (08miles) long, from to . The southern section was opened on December 1, 2018.[4] Douguan station opened on December 28, 2019.

Opening timeline

SegmentCommencementLengthStation(s)Name
Xiamaixi — Guiyangbei Railway Station28 December 201712.92NaN210Phase 1 (Guanshanhu section)
Guiyangbei Railway Station — Xiaomeng Industrial Park1 December 201814Phase 1 (Southern section)
Douguan — Xiamaixi28 December 20191Phase 1 (one-station extension)

Stations

station nameConnectionsDistance
Location
Guanshanhu
(U/C)
KQW
Yunyan
Nanming
GIW
Zhujiang RoadHuaxi

Notes and References

  1. Web site: 贵阳市轨道交通1号线全线正式开通初期运营. https://web.archive.org/web/20191025091521/http://www.xinhuanet.com/fortune/2018-12/01/c_1123794055.htm. dead. October 25, 2019. 2018-12-01.
  2. Web site: 贵阳轨道交通1号线全线开通运营 全长35.11公里设25座车站. 2018-12-01.
  3. Web site: 贵阳地铁驶来:1号线观山湖段试运行. https://web.archive.org/web/20171228171819/http://news.xinhuanet.com/local/2017-06/29/c_129643162.htm. dead. December 28, 2017. Xinhua. Guiyang Daily. 20 July 2017.
  4. Web site: 刚刚定了!贵阳地铁1号线,12月1日全线通车_新闻频道_中国青年网.