Line 1 (Granada Metro) Explained

Line 1
Color:c00b31
Image Alt:Recogidas station
Type:Rapid transit
System:Granada Metro
Locale:Granada
Start:Albolote
End:Armilla
Stations:26
Ridership2:11.7 million yearly trips
Owner:Government of Andalusia
Character:Light Rail
Stock:CAF Urbos 3
Linelength Km:15.920
Map State:collapsed

Line 1 of the Granada metro is a light rail line running from Albolote in the north to Armilla in the south, via Maracena and the center of Granada city. Today it has 26 stations and spans 15.920 km from end to end.[1]

In 2019 it received a total of 11.7 million passengers, which represents an increase of 15% compared to the previous year.[2]

Route

Line 1 is currently the only line in service in the Granada Metro network. Is entirely in double-track except for a small 730-meter stretch in the municipality of Armilla, where due to the urban layout it was arranged in a single track.

The track gauge is 1,435 mm (international gauge). It is 15 923 meters long and has 26 stations.

The mixed-layout line consists of both underground and surface sections. In the latter, the infrastructure is integrated with the urban landscape of the city. The tracks are arranged on a segregated platform, decorated with cobblestones or grass.

Rolling stock

Line 1 of the Granada Metro is composed by 15 trains Urbos 3 model, made by CAF. These have five modules with a total length of 32 meters and capacity for 200 passengers each.[3]

Stations

The line serves the following stations:

LocationStationOpenedConnections and services
Albolote, Granada2017Metropolitan buses of Granada: 122
2017Parking
Maracena, Granada2017
2017
2017Metropolitan buses of Granada: 120, 121, 122
Granada2017
2017
2017Granada Bus Station
2017
2017
2017
2017
2017Granada railway station
Renfe Media Distancia
Avant
Renfe Larga Distancia
Renfe AVE
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
Armilla, Granada2017
2017
2017Metropolitan buses of Granada: 155

Future

There are currently two extensions scheduled for line 1 of the Granada metro through its northern and southern terminus. In 2019, the Government of Andalusia approved a preliminary draft of two extensions. Also, they approved the study for the creation of a second line that would run through the central part of the capital.[4]

Southern expansion

On November 12, 2021, the Andalusian government approved the southern extension of Granada Metro line 1 from Armilla to Churriana de la Vega and Las Gabias. The new 6.8-kilometer route will involve an investment of 68 million euros, which will be partially financed by Next Generation EU funds from the European Union, after the project has been selected as eligible for them.

It will be the first expansion of the original line. The works will start at spring 2023 and its completion is scheduled for 2026.[5]

Northern expansion

On June 20, 2021, the Government of Andalusia approved the expansion of the northern terminus from Albolote to Atarfe. This extension is in draft phase, and neither its final route nor the number of stations have yet been defined.

The government confirmed it will arrive at least to the municipality of Atarfe, but is not yed defined if it will be extended beyond it.Web site: The Junta awards the project for the north expansion of the Granada Metro . EFE.

See also

External links

37.1645°N -3.6024°W

Notes and References

  1. Web site: Operación Metro de Granada.
  2. Web site: El Metro de Granada transportó en 2019 a 11,7 millones de pasajeros, un 15% más. www.aopandalucia.es. spanish.
  3. Web site: Railways of the Junta de Andalucía . Documentation of rolling stock . October 20, 2009.
  4. Web site: El Gobierno de Andalucía inicia los proyectos de ampliación de los tres metros andaluces . Junta de Andalucía . 30 December 2019. Spanish.
  5. Web site: The southern extension of the Granada Metro will reach Churriana and Las Gabias and will have six stations . November 12, 2021 . Granada Today.