Line 1 (Dongguan Rail Transit) Explained

Line 1
Other Name:R1
Type:Rapid transit
System:Dongguan Rail Transit
Status:Under Construction
Locale:Dongguan, Guangdong
Start:Wanghong
End:Huangjiang Center
Stations:21 (Phase 1)
Open:2025 (Planned)
Operator:Dongguan Rail Transit Corporation, Limited (Chinese: 东莞市轨道交通有限公司)
Character:Underground and elevated
Linelength:57.5NaN (Phase 1)
Tracks:2
Map State:collapsed

Line 1 of the Dongguan Rail Transit,, is a rapid transit line under construction in Dongguan, Guangdong. Phase 1 of Line 1 connects Wanghong station in the North with Huangjiang Center station in the south.

The Phase 1 of Line 1 in Dongguan will start construction in September 2018.[1] The five-station extension to Huangpu New Port station have not approved by National Development and Reform Commission and has no published timeline.

Stations

Station nameConnectionsDistance
LocationSection
Line 1 Extension
(long-term planning)
Dongguan

(Dongguan West (WGQ))
Phase 1 of Line 1[2] (U/C)

List of planned lines

See also

External links

Notes and References

  1. Web site: 2018-04-06 . Dìngle! Dōngguǎn zhè tiáo dìtiě xiàn, jīnnián 9 yuè zhèngshì dònggōng . zh:定了!东莞这条地铁线,今年9月正式动工 . dead . https://web.archive.org/web/20180716053757/http://news.timedg.com/2018-04/06/20652736.shtml . 2018-07-16 . 2018-07-15 . news.timedg.com . zh.
  2. Web site: 国家发展改革委关于调整东莞市城市轨道交通第二期建设规划方案的批复 . 2022-04-22. 1号线一期起于望洪站,终于黄江中心站,全长57.5公里.