Line 1 (Coimbatore Metro) Explained

Red Line
Color:ff0000
Type:Rapid transit
System:Coimbatore Metro
Status:Proposed
Start:Ukkadam Bus Terminus
End:Neelambur
Stations:18
Character:18 km Elevated
Linelength Km:20.4
Tracks:2
Speed Km/H:80

The Red Line or Line 1 is one of the two proposed lines of Coimbatore Metro, Phase 1 Project, the second being the Green line (Line 4). The line stretches from Ukkadam Bus Terminus to Neelambur. The line consists of 18 stations, out of which the Coimbatore Airport station has a spill off line.[1] [2]

Stations

The stations proposed in the first phase of Coimbatore Metro in the Line-1 are:[3]

Red Line
S.NoStation NameInterchange connectionPlaces ConnectedLayoutOpenedDepot ConnectionDepot Layout
EnglishTamil
1Ukkadam Bus Terminusஉக்கடம் பேருந்து முனையம் Yellow Line, Blue LineUkkadam Bus TerminusElevatedProposed Phase 1NoneNone
2Townhallநகர் மண்டபம்NoneCMC Central Office, Oppanakara StreetElevatedProposed Phase 1NoneNone
3Coimbatore Junctionகோயம்புத்தூர் சந்திப்பு Green Line, Coimbatore Junction railway stationCoimbatore Government HospitalElevatedProposed Phase 1NoneNone
4Collectorateமாவட்ட ஆட்சியர் அலுவலகம்NoneCoimbatore District Collector OfficeElevatedProposed Phase 1NoneNone
5GKNM Hospitalஜி.கே.என்.எம் மருத்துவமனைNoneNoneElevatedProposed Phase 1NoneNone
6Lakshmi Millsலட்சுமி மில்ஸ்NoneNoneElevatedProposed Phase 1NoneNone
7Nava Indiaநவ இந்தியாNoneNoneElevatedProposed Phase 1NoneNone
8Peelamedu Pudurபீளமேடு புதூர் Peelamedu railway stationPSG College of Technology, PSG HospitalsElevatedProposed Phase 1NoneNone
9Fun Republic Mallபன் மால்NoneFun Republic MallElevatedProposed Phase 1NoneNone
10Hope Collegeஹோப் காலேஜ்NoneTIDEL ParkElevatedProposed Phase 1NoneNone
11Coimbatore Medical Collegeகோவை மருத்துவக் கல்லூரிNoneCoimbatore Medical CollegeElevatedProposed Phase 1NoneNone
12SITRA Circleசித்ராNoneNoneElevatedProposed Phase 1NoneNone
13MGR Nagarஎம்.ஜி.ஆர். நகர்NoneNoneElevatedProposed Phase 1NoneNone
14PLS Nagarபி.எல்.எஸ் நகர்NoneNoneElevatedProposed Phase 1NoneNone
15Venkittapuramவெங்கிட்டாபுரம்NoneNoneElevatedProposed Phase 1NoneNone
16Park Plazaபார்க் பிளாசாNoneNoneElevatedProposed Phase 1NoneNone
17Neelamburநீலம்பூர்NoneNoneElevatedProposed Phase 1Neelambur DepotUnder Proposal
18Coimbatore International Airportகோயம்புத்தூர் பன்னாட்டு வானூர்தி நிலையம் Coimbatore International AirportNoneElevatedProposed Phase 1NoneNone

See also

Notes and References

  1. News: DPR for Coimbatore metro rail project to be submitted to Tamil Nadu government by July 15. 1 July 2023. The Hindu. 1 July 2023.
  2. News: CMRL Submits Detailed Project Reports for Madurai and Coimbatore Metro Projects. 15 July 2023. The Metro Rail News. 15 July 2023.
  3. News: 39km Metro Line project in Phase 1. 7 July 2023. India Herald. 7 July 2023.