Line 19 (Beijing Subway) Explained
|
Other Name: | M19 / R3 (planned name) |
Type: | Rapid transit |
System: | Beijing Subway |
Status: | In operation |
Stations: | 10 |
Operator: | Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1] |
Character: | Fully underground[2] |
Depot: | Xingong |
Stock: | 8-car Type A (CCD5034 and SFM80) |
Linelength: | 20.9km (13miles) |
Speed: | 100km/h (Phase 1) |
Map State: | collapsed |
Line 19 of the Beijing Subway is a rapid transit line in Beijing. It is 20.9km (13miles) in length and has 10 stations.[3] It is fully underground. Line 19's color is
lavender.
Description
Phase 1 of Line 19 begins at Mudanyuan station in Haidian District and ends at Xingong station in Fengtai District. Phase 1 of Line 19 is 20.9km (13miles) in length with 10 stations.[4] The line was envisioned as a major relief line for the overcrowded Line 4 and more direct link to the Beijing Financial Street commercial area.
The line uses 8-car type A rolling stock.[5] [6]
The trains have a maximum speed of . However the speed limit of the first phase, which runs under the dense city center is .[7] [8] Phase II extensions north and south run through suburban areas and will be built to more generous alignments allowing for operations.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|
Mudanyuan — Xingong | 31 December 2021[9] | 20.9NaN | 6 | Phase 1 |
Beitaipingzhuang, Ping'anli, Taipingqiao, Jingfengmen | 30 July 2022[10] | 4 | Infill stations of Phase 1 | |
Stations (Phase I)
Station Name[11] | Connections | Nearby Bus Stops | Distance [12] | Location |
---|
| |
---|
|
| | | | 0.000 | 0.000 | Haidian |
| | | | 0.920 | 0.920 | Haidian / Xicheng |
| | | | 2.450 | 3.370 | Xicheng |
| | | | 1.590 | 4.960 |
| | (Out-of-system interchange via)[13] | | 2.710 | 7.670 |
| | (Out-of-system interchange via) | | 1.240 | 9.810 |
| | | | 2.960 | 12.770 | Fengtai |
| | | | 2.680 | 15.450 |
| | | | 2.650 | 18.100 |
| | | | 2.740 | 20.840 |
| |
History
It was reported in February 2012 as one of six new lines under planning by the city's public transit planning authorities.[14] As of 2015, the line was renamed to Line 19[15] with the first phase starting construction in 2016.[16] The line opened on 31 December 2021. Four infill stations opened on 30 July 2022.
Future development
Phase 2 of Line 19, which is under planning, consists of a northern extension to Changping District. Additionally, there will be a branch line of the northern extension, which will serve the new Qinghe railway station, a station on the Beijing–Zhangjiakou intercity railway.[17] On 11 January 2022, the second phase of Line 19 was listed as one of the 10 construction projects in the "Beijing Rail Transit Phase III Construction Plan (2022-2027)".[18]
On 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) expanded the phase 2 planning. The northern extension will start from Mudanyuan and run to Life Valley as a long section with 6 new stations. A branch of the northern extension will run from Shangqingqiao South to Qinghe railway station for with one new station. Additionally, a southern extension was announced from Xingong to Haizijiao as a long section with 6 new stations along with a branch of the southern extension from Xinmeiti Chanye Jidi to Shengwu Yiyao Jidi West which will be long with 7 new stations.[19]
On 28 April 2024, Beijing Infrastructure Investment announced the northern extension and its branch, as well as southern extension.[20] On 29 July, BII published the first EIA analysis to confirm these 3 parts.[21]
Notes and References
- Web site: 定了!地铁19号线,北京轨道运营公司运营. 2019-12-12.
- Web site: 北京地铁19号线一期首次披露10座车站及运行线路-新闻频道-手机搜狐. Sohu.
- Web site: 北京今日开通9条地铁线(段) 3条主干线贯通南北 . 2021-12-31 . 今年开通的19号线一期全长20.9公里 .
- Web site: zh-hans . 北京地铁19号线将设10座车站8座能换乘 年内开建 北京日报 2015-8-27.
- Web site: http://beijing.qianlong.com/2017/0323/1526420.shtml . zh:北京地铁19号线无缝对接新机场线 10站中8站能换乘-千龙网·中国首都网. beijing.qianlong.com. 2017-03-24.
- Web site: http://beijing.qianlong.com/2018/0501/2548112.shtml . zh:北京地铁19号线一期全部车站开建 计划于2020年通车-千龙网·中国首都网. beijing.qianlong.com. 2018-05-29.
- Web site: 北京多条在建地铁完成铺轨. 2021-08-01. 作为穿越中心城区的轨道快线,19号线最高时速达到100公里.
- Web site: 北京地铁19号线一期预计2020年完工 系首条南北地铁快线. 2018-07-18. 一期工程受土建实施限制限速100km/h. 2019-05-24. 2019-05-24. https://web.archive.org/web/20190524072545/http://www.xinhuanet.com/local/2018-07/18/c_1123140795.htm.
- Web site: 大站快车!地铁19号线初期开通6站,从南到北仅需24分钟. 此次开通初期运营共6座车站,自南向北为新宫站、新发地站、草桥站、牛街站、积水潭站、牡丹园站. 2021-12-29. 北京日报. 2021-12-29. 2022-03-25. https://web.archive.org/web/20220325035307/https://ie.bjd.com.cn/5b165687a010550e5ddc0e6a/contentApp/5b16573ae4b02a9fe2d558f9/AP61cbc733e4b0b9f572ba68c7.html.
- Web site: 地铁19号线剩余4站明日试运营!新宫至牡丹园只需半小时. 2022-07-29. https://web.archive.org/web/20220729045111/http://ie.bjd.com.cn/5b5fb98da0109f010fce6047/contentShare/5b5fb9d0e4b08630d8aef954/AP62e3538ce4b0f805269311af.html. 2022-07-29.
- Web site: 北京地铁线路图. 北京地铁. https://web.archive.org/web/20211231004642/https://www.bjsubway.com/jpg.html. 2021-12-31. 2021-12-31.
- Web site: 19号线路网车站站间距信息. 2022-02-18.
- Web site: 地铁开通"虚拟换乘"之后,乘客的地面换乘体验如何?记者进行实地探访. 2022-08-01. https://web.archive.org/web/20220802010910/https://news.bjd.com.cn//2022/08/01/10126695.shtml. 2022-08-02.
- Web site: 北京6条地铁新线开始前期调研. 2012-02-13. https://web.archive.org/web/20220729044730/http://district.ce.cn/newarea/roll/201202/13/t20120213_23067658.shtml. 2022-07-29.
- Web site: 北京地铁17号线二次环评公示 拟撤永安里北站_央广网.
- Web site: 北京地铁19号线一期预计2020年完工 系首条南北地铁快线-新华网. https://web.archive.org/web/20180718082108/http://www.xinhuanet.com/local/2018-07/18/c_1123140795.htm. dead. July 18, 2018. www.xinhuanet.com. 2018-07-21.
- Web site: http://www.bj.xinhuanet.com/bjyw/2017-03/22/c_1120674330.htm . https://web.archive.org/web/20170325112900/http://www.bj.xinhuanet.com/bjyw/2017-03/22/c_1120674330.htm . dead . March 25, 2017 . zh:北京地铁19号线一期计划2020年底开通. www.bj.xinhuanet.com. 2017-03-24.
- Web site: 北京市轨道交通第三期建设规划环境影响评价第一次公示_信息公开_北京市基础设施投资有限公司. 2022-01-28. www.bii.com.cn.
- Web site: 2022-07-08 . 北京市轨道交通第三期建设规划(2022-2027年)环境影响报告书(征求意见稿).pdf . China Academy of Railway Sciences Co., Ltd. . 2022-07-08 . dead . 2022-07-08 . https://web.archive.org/web/20220708041025/https://www.rails.cn/download/2022/%E9%99%84%E4%BB%B61%EF%BC%9A%E5%8C%97%E4%BA%AC%E5%B8%82%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A%E7%AC%AC%E4%B8%89%E6%9C%9F%E5%BB%BA%E8%AE%BE%E8%A7%84%E5%88%92%EF%BC%882022-2027%E5%B9%B4%EF%BC%89%E7%8E%AF%E5%A2%83%E5%BD%B1%E5%93%8D%E6%8A%A5%E5%91%8A%E4%B9%A6%EF%BC%88%E5%BE%81%E6%B1%82%E6%84%8F%E8%A7%81%E7%A8%BF%EF%BC%89.pdf .
- Web site: 2024-04-28 . 北京轨道交通19号线二期线路一体化规划方案公示 . https://web.archive.org/web/20240515111757/https://www.bii.com.cn/newsInfo_1563.html . 2024-05-15 . 2024-04-28 . Beijing Infrastructure Investment Co., Ltd. . live.
- Web site: 2024-07-29 . 北京轨道交通19号线二期工程环境影响评价第一次公示 . live . https://web.archive.org/web/20240729154814/https://www.bii.com.cn/newsInfo_3723.html . 2024-07-29 . 2024-07-29 . 北京市基础设施投资有限公司.