Line 17 (Shenzhen Metro) Explained

Type:Rapid transit
System:Shenzhen Metro
Status:Under construction
Locale:Shenzhen, Guangdong
End: (Phase 1)
Stations:18 (Phase 1)
Routes:1
Operator:SZMC (Shenzhen Metro Group)
Character:Underground
Linelength:18.8 km (Phase 1)

Line 17 of the Shenzhen Metro is a Phase V expansion metro line under construction in the eastern Shenzhen districts of Luohu and Longgang. Construction on Phase 1 started on 10 October 2023, and the line is expected to open in June 2029, which will run from Luohu West in Luohu District to in Longgang District, with 18 stations and 18.8 kilometers of track.[1] [2]

Stations (Phase 1)

Station nameConnectionsLocation
(via)Luohu

Luohu North (U/C)
LuogangLonggang
-bgcolor="lightgrey"
Xinnan

Pinghu

Notes and References

  1. Web site: 深圳13条规划地铁新线的具体走向和站点设置公布. 2022-09-07. 地铁17号线一期由罗湖西至上李朗,设站18座,线路总长约18.8公里,全线采用地下敷设方式.
  2. Web site: zh:深圳地铁五期规划建设13条线路 年底运营里程将破500公里. https://new.qq.com/rain/a/20220907A09SOY00.html. new.qq.com. 2022-09-07.