Other Name: | M16 (planned name) |
Type: | Rapid transit |
System: | Beijing Subway |
Status: | Operational |
Locale: | Fengtai, Xicheng and Haidian District Beijing |
Stations: | 30 (29 in operation) |
Daily Ridership: | 140,000 (2021 first half, peak)[1] |
Operator: | Beijing MTR Metro Line 16 Corp., Ltd. |
Character: | Underground |
Depot: | Bei'anhe and Yushuzhuang |
Stock: | 8-car Type A (DKZ93, SFM40) |
Linelength: | 48.9km (30.4miles) |
Electrification: | from overhead catenary |
Speed: | 80km/h[2] |
Map State: | collapsed |
Line 16 of the Beijing Subway is a rapid transit line in Beijing. It is 48.9km (30.4miles) in length with 30 stations (29 stations in operation). The line is fully underground.
Construction began in December 2013. The northern section, from to, was opened on 31 December 2016.[3] An infill station,, was opened on 30 December 2017. It extended to on 31 December 2020, and extended to on 31 December 2021. The southern section to opened on 31 December 2022. The remainder of the line to opened on 30 December 2023.
The line is operated by the Beijing MTR Corporation Limited and uses CNR Changchun DKZ93 and CSR Sifang SFM40 eight-car high-capacity wide-body Type A trains.[4] Line 16's color is
dark-moderate green.The line starts at the west end of Beiqing Road (北清路), just outside of the 6th Ring Road, and follows the road east to Yongfeng Road (永丰路) where it turns south towards the city. Line 16 follows Yongfeng Road south to, then continues south to the and . It then continues south, passing through,, and turns west through, then west-southwest through before traversing slightly west north-west to end at .
In 2009, Line 16 was among the 198 major urban planning projects listed by Beijing's development and reform commission.[5] At that time, Line 16 was slated to run about 35km (22miles), from Huilongguan in Changping District to Huaxiang in Fengtai District.[5]
According to the June 2010 plans, the northern section of Line 16 will replace the originally planned Line 4 northern extension and run 48km (30miles) from Bei'anhe in Haidian District, south to Xiaoyueyuan, near the Lugou Bridge in Fengtai District.[6] The line would begin near Bei'anhe, and provide access to parts of Haidian, north of the foothills the Western Hills that extend into Haidian District. For this reason, that section of the line was also referred to as the Haidian Shanhou (literal translation: Haidian Back Mountain) Line because it begins on the backside of the low-lying range that extends from the Fragrant Hills to the Summer Palace.[6] Points of interest that the line may pass along the route to Xiaoyueyuan in the south include the Summer Palace, Haidian Gymnasium, National Library, Purple Bamboo Park, Beijing Zoo, Chegongzhuang West Road, Sanlihe, Wanshou Temple, (Lize Business District), and the Beijing Fengtai railway station.[6] The proposal was scaled back with the removal of the Haidian Shanhou section in December 2010, reducing the line to just 23km (14miles), from to . But the northern section was subsequently restored months later, bringing the line length 49km (30miles).[7]
The Beijing Municipal Commission of Urban Planning released the plans for several subway stations in 2013.[8] Construction of the line began in December 2013.[9]
The northern section, from Bei'anhe to Xiyuan, except for Nongda Nanlu, opened on December 31, 2016. Nongda Nanlu opened on December 30, 2017. In April 2020, the Beijing Municipal Commission of Development and Reform decided to build an infill station on the southern section of Line 16: (now renamed to).[10]
On December 31, 2020, the middle section from Xiyuan to Ganjiakou opened.[11] (Suzhou Jie and Erligou stations were not opened)
On December 31, 2021, a one-station extension to opened.
On December 31, 2022, the southern section of Line 16 (from to) opened. (station was not opened)
On March 18, 2023, station started operation.
On December 30, 2023, the extension from to, and the infill station, started operation.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Bei'anhe — Xiyuan | 31 December 2016 | 19.62NaN2 | 9 | Northern section | |
Nongda Nanlu | 30 December 2017 | Infill station | 1 | ||
Xiyuan — Ganjiakou | 31 December 2020 | 10.9292NaN2[12] | 5 | Middle section | |
Ganjiakou — Yuyuantan Park East Gate | 31 December 2021[13] | 0.972NaN2 | 1 | ||
Yuyuantan Park East Gate — Yushuzhuang | 31 December 2022[14] | 14.2342NaN2 | 9 | Southern section | |
Erligou | 18 March 2023 | Infill station | 1 | Middle section | |
Yushuzhuang — Wanpingcheng | 30 December 2023[15] | 2.7NaN[16] | 2 | Southern section | |
Suzhou Jie | Infill station | 1 | Middle section | ||
Lize Shangwuqu | To be determined | Infill station | 1 | Southern section |
List of stations from north to south.
Station Name[17] | Connections | Nearby Bus Stops | Distance | Location | |||
---|---|---|---|---|---|---|---|
0.000 | 0.490 | align=center rowspan="15" | Haidian | ||||
2.653 | 3.143 | ||||||
2.310 | 5.453 | ||||||
2.352 | 7.805 | ||||||
1.960 | 9.765 | ||||||
1.315 | 11.080 | ||||||
2.108 | 13.188 | ||||||
2.195 | 15.383 | ||||||
1.517 | 16.900 | ||||||
2.690 | 19.590 | ||||||
1.980 | 21.570 | ||||||
1.486 | 23.056 | ||||||
1.497 | 24.553 | ||||||
1.610 | 26.163 | ||||||
1.721 | 27.884 | ||||||
1.589 | 29.473 | align=center rowspan="3" bgcolor=#F8F9FA | Haidian / Xicheng | ||||
1.046 | 30.519 | ||||||
0.970 | 31.489 | ||||||
0.565 | 32.054 | align=center | Haidian | ||||
2.004 | 34.058 | align=center rowspan="2" | Xicheng | ||||
[18] | 1.552 | 35.610 | |||||
— | — | align=center rowspan="9" bgcolor=#F8F9FA | Fengtai | ||||
3.044 | 38.654 | ||||||
1.794 | 40.448 | ||||||
1.420 | 41.868 | ||||||
1.187 | 43.055 | ||||||
1.226 | 44.281 | ||||||
1.442 | 45.723 | ||||||
[19] | 1.681 | 47.404 | |||||
1.713 | 49.117 | ||||||
Model | Image | Manufacturer | Year Built | Amount in Service | Fleet Numbers | Depot |
---|---|---|---|---|---|---|
DKZ93 | CRRC Changchun Railway Vehicles | 2016 | 35 | 301–335 | Beianhe | |
SFM40 | CRRC Qingdao Sifang | 29 | 336–364 |
Car No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
Designation | Tc1 | Mp1 | M1 | Mp3 | M3 | M2 | Mp2 | Tc2 |
Web site: 北京地铁16号线工程环境影响报告信息公告 . 2011-04-08 . 2011-04-10 . 铁道第三勘察设计院集团有限公司.
Web site: 北京地铁16号线工程环境影响报告书简本 . 铁道第三勘察设计院集团有限公司 . 2012-10-26 . 2012-10-27.
Web site: 地铁下月开工16号线 . 2013-02-17 . 京华时报、京华网.
Web site: 北京地铁十六号线二期(原海淀山后线)工程环境影响评价信息二次公示 . 2013-12-10 . 2013-12-10 . 铁道第三勘察设计院集团有限公司.