Line 14 (CPTM) explained

Box Width:450px
Line 14 (Onyx)
Color:0A1013
Logo Alt:CPTM logo
Type:Commuter rail
System:São Paulo Metropolitan Trains
Status:Proposed
Locale:Greater São Paulo, Brazil
Start:Bonsucesso
End:Jardim Irene
Stations:22
Owner:Government of the State of São Paulo
Operator: CPTM
Linelength:39km (24miles)
Box Width:450px
Line 14 (Onyx) (2013 Proposal)
Logo Alt:CPTM logo
Type:Commuter rail
System:São Paulo Metropolitan Trains
Status:Cancelled
Locale:Greater São Paulo, Brazil
Start:Luz
End:Guarulhos
Stations:3
Owner: Government of the State of São Paulo
Operator: CPTM
Linelength:28km (17miles)
Electrification:3,000 V DC catenary
Speed:80km/h

Line 14 (Onyx) (Portuguese: Linha 14–Ônix), formerly called the Airport Express, is a planned line of the Companhia Paulista de Trens Metropolitanos commuter rail system in São Paulo, Brazil which would originally connect the São Paulo-Guarulhos International Airport to Brás Station. The line was planned to have an average interval of six minutes between each station.[1]

On May 9, 2013, the Governor of São Paulo Geraldo Alckmin cancelled the former project, as it seemed no longer viable due to the Federal Government project to establish the Rio–São Paulo high-speed rail. Line 14 would have a special fare estimated in R$ 30.00 (ten times higher than the normal CPTM fare, R$ 3.00 as of 2013). Alternatively the planned Line 13 (Jade) shall be extended up to the airport and keeping the same standard fare prevailing in all CPTM's lines. [2]

Although the State Government says that the current plan is to finish the constructions in progress, some preliminary details were revealed about the stations and character of the line.[3]

On April 5, 2024, the Governor of São Paulo, Tarcísio de Freitas, announces the new route of Line 14 Onyx between Bonsucesso in Guarulhos and Jardim Irene in Santo André.

Stations

Stations of the Old Line 14–Onyx Project 2013 - Canceled

StationPlatformsPositionConnectionsCity
LuzIsland and side platformsAt-grade


Touristic Express
São Paulo
Brás

Brás Bus Terminal
GuarulhosSide platformsElevatedGuarulhos

Official Stations 2024 Line 14–Onyx (CPTM)

StationConnectionsMunicipality
Bonsucesso
Bonsucesso Bus Terminal
Guarulhos
Pimentas Pimentas Bus Terminal
Sacramento
Hospital Jardim HelenaSão Paulo
São Miguel Paulista
Vila Jacuí
Imperador
Cidade A. E. Carvalho A. E. Carvalho Bus Terminal
Corinthians-Itaquera

Itaquera Bus Terminal
Hospital Santa Marcelina
Parque do Carmo
Rio das Pedras/Aricanduva
Jardim Itápolis
Sapopemba
Sapopemba/Teotônio Vilela Bus Terminal
Parque Oratório/NevadaSanto André
Hospital da Mulher/Cidade dos Meninos
Jardim Sorocaba
ABC
Miguel Couto
Macedo Soares
Vila Luzita Vila Luzita Bus Terminal
Jardim Irene

External links

Notes and References

  1. Web site: Trem de Guarulhos . 4 June 2011 . Portuguese . dead . https://web.archive.org/web/20120323232904/http://www.revistaferroviaria.com.br/stip/apresentacoes/Aeroporto_GRT_Renato%20Viegas.pdf . 23 March 2012 .
  2. Web site: Com Linha 14 - Onix cancelada, Linha 13 - Jade irá até o Aeroporto . Line 14 - Onyx cancelled, line 13 - Jade will go up to the airport . Portuguese . Novo Jornal da CPTM . May 13, 2013 . December 5, 2013 . dead . https://web.archive.org/web/20131211065606/http://jornaldacptm.blogspot.com.br/2013/05/com-linha-14-onix-cancelada-linha-13.html . December 11, 2013 .
  3. Web site: VLT em elevado e túnel: alguns detalhes sobre a Linha 14-Ônix da CPTM. Via Trólebus. pt. Renato. Lobo. 9 February 2021. 10 February 2021.