Line 11 (Shenzhen Metro) Explained

Other Name:Airport line
Mapcolor: Tyrian purple (#)
Type:Rapid transit
System:Shenzhen Metro
Status:Operational
Locale:Shenzhen, China
Stations:19
Operator:SZMC (Shenzhen Metro Group)
Character:Underground and elevated
Depot:Songgang depot
Airport North stabling yard
Stock:CRRC Zhuzhou (1101-1133)(8A)
Tracks:Double-track
Electrification:Overhead lines (1500 volts)
Speed: designed, currently limited to
Signalling:Urbalis 888 CBTC Moving block
Map State:collapsed

Shenzhen Metro Line 11 opened on 28 June 2016.[1] Line 11 has a length of [2] and a total of 19 stations. It connects the CBDs of Futian, Nanshan and Qianhai to Shenzhen Bao'an International Airport and onward to Fuyong, Shajing and Songgang suburban areas. It serves as both a regional express line from the west coast of Shenzhen to the city core area and an airport rail link.[3] Compared with the other lines of Shenzhen Metro, Line 11 has a longer spacing between stops for a higher speed service. Trains of Line 11 were designed to run at, up to 50% faster than other lines,[4] but currently limited to in some sections for infrastructure, tunnel wind pressure, track geometry issues and noise reasons.[5] Construction of Line 11 started in April 2012 and test running begun at the end of March 2016. Trains run at a 4-minute frequency between Futian and Airport North, 8-minute frequency for full length trains during morning rush hours, 5-minute interval for full length during evening rush hours, and 6-minute interval for non-peak hours. Currently it takes slightly more than half an hour to travel from Futian to the Airport. Line 11's color is .[6]

History

In 2007, the "Shenzhen City Rail Transit Construction Plan (2011 to 2020)" was publicly announced for the first time, which included the plans for Line 11.[3] The plan calls for an express metro line running along the western coast of Shenzhen with through services to Dongguan, Guangzhou and beyond via the Guangzhou–Shenzhen intercity railway which was then envisioned to be an intercity metro line.[7] In December 2008, a ground breaking ceremony was held for the project, attended by Party Secretary Wang Yang and Governor Huang Huahua.[8] However, design changes started immediately after due to disagreements on how to integrate the metro project with the intercity line. Subsequently, the project was postponed.[9]

In July 2010, China Railway Minister Liu Zhijun and Guangdong Executive Vice Governor Zhu Xiaodan held talks to speed up railway construction in Guangdong. The result was a new plan to construct a Pearl River Delta Metropolitan Region intercity railway network. The Guangzhou–Shenzhen intercity railway was redesigned from a rapid transit line to a regional rail line and will no longer enter the central area of Shenzhen. Instead the Guangzhou–Shenzhen intercity railway shall terminate at station with interchange for Line 11 but no through services.[10]

Timeline

SegmentCommencementLengthStation(s)Name
Bitou — Futian28 June 201618Phase 1
Futian — Gangxia North28 October 2022[11] 1Phase 2 (Initial Section)

Service routes

Stations

Service
routes
Station nameConnectionsNearby bus stopsDistance
Location
0.000.00Bao'an
1.901.90
2.304.20
2.406.60
1.758.35
1.7510.10
1.7011.80
1.7513.55
2.6516.20
SZX3.6519.85
7.0026.85
3.4030.25
2.7032.95Nanshan
4.2037.15
1.9039.05
3.2542.30
5.7548.05Futian
Futian3.1051.93
1.6053.53

(via)
Luohu

Future Development

Line 11 is planned to have an east extension to Hongling South.[12] The one-station extension from Futian to Gangxia North opened on 28 October 2022 and the remaining 3 stations are currently under construction. The extension to Huaqiang South is expected to open at the end of 2024. Hongling South will open in 2025.

Additional proposals include a northern extension into Chang'an, Dongguan with transfers to Dongguan Rail Transit.

Rolling stock

The airport line will use 33 sets of Size A subway trains in eight car sets (no. 1101–1133) with a maximum speed of, including two six standard class carriages and two Business Class carriages. On 4 July 2015, the first train completed eight months of commissioning work,[13] and 10 trains have been delivered from CRRC Zhuzhou as of March 2016. The maximum train capacity is 2564 people.

Business Class

Business Class has transverse seating and curtains[14] for comfort and luggage racks for airport passengers.[15] To ride Business Class passengers have to pay a premium for their ticket, similar to First Class on the MTR East Rail line. Business Class carriages are marked by dark grey floor tiles and yellow panels above the platform screen doors. Standard class carriages are marked by light grey floor tiles and white panels above the doors.[16]

Fares

Two kinds of fares are charged on Line 11. In standard class, the fare is equivalent to other metro lines. Business Class is three times as expensive as standard class. Standard class fares range between 2 and 10 yuan, with Business Class ranging between 6 and 30 yuan. Because of the possibility of transfers, this makes the maximum possible fare on the Shenzhen Metro 35 yuan. Business Class can be accessed through placing the Shenzhen Tong on a validator or through purchasing a yellow token (standard tokens are green).[17] 11% of passengers travel by Business Class.

Notes and References

  1. Web site: http://news.dayoo.com/guangdong/201606/27/139996_47459480.htm . zh:深圳地铁11号线28日起试运营 11点后可购票体验_广州日报大洋网 . Wang Nian (王念) . news.dayoo.com . 2016-06-28 . https://web.archive.org/web/20160628151943/http://news.dayoo.com/guangdong/201606/27/139996_47459480.htm . 2016-06-28 . dead .
  2. Web site: 深圳地铁11号线全网普通票最高14元. 2016-06-24.
  3. Web site: http://www.szpl.gov.cn/main/zsgg/200707090211049.shtml. zh:轨道交通近期建设线路线站位初步方案. 深圳市规划和国土资源委员会. July 9, 2007. zh. December 22, 2012. https://web.archive.org/web/20171031223006/http://www.szpl.gov.cn/main/zsgg/200707090211049.shtml. October 31, 2017. dead.
  4. Web site: Sina Visitor System . zh:深圳地铁11号线动态新闻. weibo.com. 2016-06-11.
  5. Web site: 关于深圳地铁11号线轨道弹条问题的分析 . https://web.archive.org/web/20190703035357/http://www.woyushu.com/Sub/get_chapter/198482 . 2019-07-03 . 2019-07-03 . 智富时代-2018年4期 . dead.
  6. Web site: Sina Visitor System . zh:#新线online# #深圳地铁11号线#. www.weibo.com. 2016-06-11.
  7. Web site: 深圳市轨道交通规划简要报告(3). February 21, 2008. December 22, 2012. https://web.archive.org/web/20140202214751/http://www.szpl.gov.cn/main/zsgg/200802210216545.shtml. February 2, 2014. dead.
  8. Web site: 穗莞深城际轨道干线在深圳开工全程1小时_深圳新闻网. news.sznews.com. 2016-12-11. https://web.archive.org/web/20090208013050/http://news.sznews.com/content/2008-12/22/content_3473005.htm. 2009-02-08. dead.
  9. Web site: 深莞惠交通运输一体化提速---深圳特区报. sztqb.sznews.com. 2016-12-11. https://web.archive.org/web/20120823000007/http://sztqb.sznews.com/html/2011-05/12/content_1564824.htm. 2012-08-23. dead.
  10. Web site: 【图文】珠三角城际轨道交通线网技术标准调整情况_百度文库. wenku.baidu.com. 2016-12-11.
  11. Web site: "两线三枢纽"开通!深圳首条地铁14号线今日正式迎客. 2022-10-28. 11号线福田至岗厦北区间,线段全长1.6公里.
  12. Web site: http://sz.winshang.com/news-522927.html. zh:深圳东莞地铁实现无缝接驳 四条接驳线路初定_新闻中心_赢商网. sz.winshang.com. 2016-12-11. https://web.archive.org/web/20160422152213/http://sz.winshang.com/news-522927.html. 2016-04-22. dead.
  13. Web site: Sina Visitor System . zh:#新线online# #深圳地铁11号线#. www.weibo.com. 2016-06-11.
  14. Web site: Sina Visitor System . zh:#新线online# #深圳地铁11号线#. www.weibo.com. 2016-06-11.
  15. Web site: 11号线从中心区到机场不超半小时. April 24, 2012. 深圳特区报. December 26, 2012. https://web.archive.org/web/20140202120047/http://sztqb.sznews.com/html/2012-04/20/content_2012569.htm. February 2, 2014. dead.
  16. Web site: Sina Visitor System . zh:新线直击 这个"庙"好特别. www.weibo.com. 2016-06-11.
  17. Web site: 新线直击 商务车厢乘车指引get√.