Line 10 (Shenzhen Metro) Explained

Line 10
Mapcolor: Pink (#)
Type:Rapid transit
System:Shenzhen Metro
Status:In operation
Locale:Shenzhen, China
Stations:24
Open:[1]
Operator:SZMC (Shenzhen Metro Group)
Character:Underground
Depot:Liangmao Hill Depot
Yitian stabling yard
Stock:CRRC Changchun (1001-1035) (Type A, 8 cars)
Linelength:[2]
Tracks:Double-track
Electrification: (overhead lines)
Signalling:CBTC
Map State:collapsed

Line 10, also known as the Bantian line of the Shenzhen Metro began construction at the end of 2015.[3] The line opened on 18 August 2020. Line 10 has a length of 29.3km (18.2miles) and a total of 24 stations. It connects the Futian Checkpoint to Shuangyong Street. In the southern terminus of the line, a 555 meters long and 50.5 meters wide double deck underground depot capable of storing 16 trains will be constructed.[4]

History

Line 10 was originally a low priority line to be constructed in the long term future called Line 16. In 2011, the Shenzhen Municipal Government approved the Longgang District Government to start the preliminary work on Line 10.[5] On 2013, the Shenzhen Municipal Government renumbered Line 16 into Line 10 and included it in the Phase III expansion.[6] [7] The original Shenzhen Metro Line 10 was renumbered to Line 12 planned to be built in Phase IV.[8] This was done to fast track the construction of the line to ease the pressure on Line 4 and accommodate further growth of the Longgang area.[9] [10] According to the original plan, the northern section of Line 10 runs through Fenggang town of the neighboring Dongguan City. Due to legal and government coordination problems, Line 10 will temporarily terminate in Pinghu, with capability to extend further north into Dongguan in the future.[11] Further into construction, the line was redesigned to handle 8 car trains instead of the original specification of 6 cars to increase the line's ability to handle the growing transport demand in Shenzhen.[12]

Opening timeline

SegmentCommencementLengthStation(s)Name
Futian Checkpoint — Shuangyong Street18 August 202029.32NaN223Phase 1
Gangxia North28 October 2022Infill station1

Service routes

Stations

Service
routes
Station nameConnectionsNearby bus stopsDistance
Location
Line 10 Northern Extension (Under planning)
黄阁坑Longgang
Dynamic Town大远城邦Fenggang, Dongguan
Guanjingtou官井头
Youganpu油甘埔
Longping Road龙平路
Line 10 (In operation)
Longgang
PHQ
Futian

Line 10 Southern Extension (Under Planning)[13]
Futian

Notes and References

  1. Web site: 官宣!深圳地铁6、10号线8月18日开通初期运营. Shenzhen Metro. 2020-08-16.
  2. Web site: 地铁6号、10号线传喜讯,计划明年年中迎客. 2019-12-03.
  3. Web site: http://www.cutv.com/v2/2015-10-16/G14efeeegfiiinngimgdg7.shtml. zh:地铁10号线拟于本月动工 深圳东部将增添轨道大动脉 - 深视新闻 - 城市联合网络电视台. www.cutv.com. 2016-12-13. https://web.archive.org/web/20160601120414/http://www.cutv.com/v2/2015-10-16/G14efeeegfiiinngimgdg7.shtml. 2016-06-01. dead.
  4. Web site: 深圳将有国内最大地铁停车场 可同时停16列车_广深新闻_新闻_星岛环球网. news.stnn.cc. zh-CN. 2018-07-21.
  5. Web site: http://www.sznews.com/news/content/2013-01/07/content_7574569_2.htm . zh:地铁16号线有望2015年提前开工建设 设26站_深圳新闻_深圳新闻网 . Huang Chun (黄淳) . www.sznews.com . 2016-12-13 . https://web.archive.org/web/20150924112927/http://www.sznews.com/news/content/2013-01/07/content_7574569_2.htm . 2015-09-24 . dead .
  6. Web site: http://dtzbd.sznews.com/html/2014-02/19/content_2781666.htm. zh:地铁10号线 终点在平湖---深圳都市报. dtzbd.sznews.com. 2016-12-13. https://web.archive.org/web/20140225200627/http://dtzbd.sznews.com/html/2014-02/19/content_2781666.htm. 2014-02-25. dead.
  7. Web site: http://barb.sznews.com/html/2013-10/14/content_2649130.htm . zh:原地铁10号线将何去何从?. dead. https://web.archive.org/web/20160803185206/http://barb.sznews.com/html/2013-10/14/content_2649130.htm. 2016-08-03.
  8. Web site: http://www.sznews.com/news/content/2013-10/15/content_8623312_4.htm. zh:深圳原地铁10号线没有取消 只是建设时序调整_深圳新闻_最全最迅速的深圳资讯—深圳新闻网. www.sznews.com. 2016-12-13. https://web.archive.org/web/20140225191035/http://www.sznews.com/news/content/2013-10/15/content_8623312_4.htm. 2014-02-25. dead.
  9. News: http://gz.ifeng.com/zaobanche/detail_2012_12/05/462568_0.shtml . zh:深圳交委称早7点以前或实行地铁票价优惠. Ifeng Guangzhou . December 5, 2012. dead. https://web.archive.org/web/20141204212322/http://gz.ifeng.com/zaobanche/detail_2012_12/05/462568_0.shtml. December 4, 2014.
  10. News: http://www.sz.gov.cn/cn/xxgk/bmdt/201301/t20130107_2098547.htm . zh:我市召开轨道交通建设指挥部会议,地铁16号线有望提前开工. January 7, 2013 . 深圳市交通运输委员会 [Shenzhen Municipal Transportation Committee]. dead. https://web.archive.org/web/20150104071953/http://www.sz.gov.cn/cn/xxgk/bmdt/201301/t20130107_2098547.htm. January 4, 2015.
  11. News: December 5, 2012. 市地铁集团首席规划师刘卡丁:16号线力争提前建设,暂时不到龙岗中心城. 南方日报.
  12. Web site: 深圳地铁10号线这个站厉害了:710米,亚洲第一长!. sz.news.fang.com. 2019-05-13.
  13. Web site: 深圳轨道四期拟增加建设87公里. 2019-02-26.