The Lanzhou–Hezuo railway or Lanhe railway (or Chinese: 兰合铁路) is a railway line under construction that will connect Lanzhou to Linxia and Hezuo by rail.[1] It is proposed to continue the line from Hezuo to Chengdu. The railway line will be the first railway to be constructed in Linxia and Gannan.[2]

The length of the line will be 187.798km (116.692miles) of which 147.455km (91.624miles) is newly constructed.

Although an existing railway connects Lanzhou to Yongjing, the new Lanhe railway will follow a different route.

History

The initial feasibility study was presented in 2009. In 2011, the Ministry of Railways requested a technical study for the railway, this was completed in 2013. Construction started in December 2014 and was originally planned to be completed in 2019.[3] However, the designs were adjusted and construction was suspended. In 2015, it was announced that the design speed was increased to 120km/h to 200km/h, and a new feasibility study was to be completed by 2016.[4]

In 2019, it was announced that the construction would resume by the end of the year.[4] Construction is by the China Railway Bureau 20th Construction Group at a total investment of CNY 22.987 billion.[5]

External links

Notes and References

  1. Web site: http://gs.people.com.cn/n/2014/1118/c183341-22937108.html . zh:新建兰州至合作铁路项目获国家发改委批复 . Chinese . 人民网 . 18 November 2014 .
  2. Web site: http://www.chnrailway.com/html/20160408/1352218.shtml . zh:兰合铁路2019年将建成通车 . Chinese . 中华铁道网 . 8 April 2016 .
  3. Web site: http://www.chnrailway.com/html/20160408/1352218.shtml . zh:兰合铁路2019年将建成通车 . Chinese . 中华铁道网 . 8 April 2016 .
  4. Web site: 兰州至合作铁路预计10月开建 将结束临夏、甘南两州无铁路的历史-甘肃-每日甘肃网. gansu.gansudaily.com.cn. 2019-11-14.
  5. Web site: 兰州至合作铁路黄家岭隧道建设动员会召开 - 中国临夏新闻网.
  6. Web site: "桑麻之地"再添"致富路""幸福路". 18 September 2020. 佟明彪.