La Crosse Boiling Water Reactor Explained

La Crosse Boiling Water Reactor
Location Map Caption:Location of La Crosse Boiling Water Reactor within Wisconsin
Coordinates:43.5601°N -91.2315°W
Country:United States
Location:Genoa, Wisconsin
Status:D
Construction Began:March 1, 1963[1]
Commissioned:November 7, 1969
Decommissioned:April 30, 1987
Operator:Dairyland Power Cooperative
Ps Units Decommissioned:50 MWe
Np Reactor Type:BWR
Ps Electrical Capacity:50 MWe

La Crosse Boiling Water Reactor (LACBWR) was a boiling water reactor (BWR) nuclear power plant located near La Crosse, Wisconsin in the small village of Genoa, in Vernon County, approximately 17 miles south of La Crosse along the Mississippi River. It was located directly adjacent to the coal-fired Genoa Station #3. The site is owned and was operated by Dairyland Power Cooperative (Dairyland). Although the reactor has been demolished and decommissioned, spent nuclear fuel is still stored at the location.

LACBWR was built from 1963 to 1967 as part of a federal project to demonstrate the viability of peacetime nuclear power. It was designed and built by Allis-Chalmers and funded in part by the Atomic Energy Commission (AEC) in cooperation with Dairyland Power Cooperative. The reactor began commercial operation in 1969 and reached full capacity in 1971.[2] LACBWR had a 50 MW electrical output from a forced-circulation, direct-cycle boiling water reactor as its heat source.[3] In 1973 the reactor and fuel were transferred in full to Dairyland Power.

Decommissioning and waste disposal

In April 1987, LACBWR was shut down because the small size of the plant made it no longer economically viable. It was placed in SAFSTOR on August 7, 1991. The reactor pressure vessel was removed in May 2007 and shipped to Chem-Nuclear's Barnwell, South Carolina low-level radioactive waste (LLRW) disposal facility. The shipment weighed approximately 310 tons and required a specially designed rail car.

In 2012, spent nuclear fuel from the reactor was sealed into a dry cask storage installation located immediately south of the Genoa Generating Station.[4] Spent reactor fuel continues to be stored on site pending the creation of a national radioactive waste disposal facility such as Yucca Mountain.[5]

In 2016, Dairyland transferred control of the inactive reactor facility to LaCrosseSolutions, a subsidiary of Utah-based EnergySolutions, for the purpose of demolition and decommissioning.[6]

In February 2017, workers spilled about 400 gallons of radioactive wastewater into the Mississippi River after leaving a hose and sump pump in a tank overnight.[7] The wastewater contained Caesium-137 at concentrations greater than allowed under federal regulation for discharge; however, the resulting radiation was below levels considered harmful to human health.[8] In another incident, routine tests from December 2017 to August 2018 detected elevated levels of tritium in groundwater at the site. The tritium was traced to condensation around a vent installed during demolition of the facility and the leak was mitigated before spreading to the Mississippi River.[9]

In 2019, EnergySolutions announced that it had completed the physical demolition of the reactor.[10] The decommissioning of the site was delayed through 2022 pending the evaluation of survey data.[11] [12] In February 2023, the Nuclear Regulatory Commission approved the final decommissioning of the site. This returned the area to unrestricted use, with the exception of the independent spent fuel storage installation maintained by Dairyland Power.[13] [14]

See also

External links

Notes and References

  1. Web site: Lacrosse Reactor Details. 2022-03-15. 2022-03-16. IAEA.
  2. Driscoll . David . Slow Boil: The Story of Wisconsin's First Nuclear Reactor . Wisconsin Magazine of History . Autumn 2001 . 85 . 1 . 34–45 . 16 March 2022.
  3. Web site: La Crosse Boiling Water Reactor. 2013-04-14. Nuclear Regulatory Commission.
  4. News: Hubbuch . Chris . A nuclear option: After 25 years, Genoa reactor's waste gets new home . 16 March 2022 . La Crosse Tribune . 15 July 2012 . en.
  5. News: Hubbuch . Chris . As Trump wavers on Yucca Mountain, nuclear waste, costs mount . 16 March 2022 . La Crosse Tribune . 29 October 2018 . en.
  6. News: NRC Approves Transfer of Operational Control of LaCrosse NPP to EnergySolutions for Final D&D . 15 March 2022 . GlobeNewswire . 2 June 2016 . en.
  7. News: Hubbuch . Chris . NRC: Company dismantling Genoa nuclear plant spilled tainted water into Mississippi River . 15 March 2022 . La Crosse Tribune . 26 March 2018.
  8. News: Officials: Spill at Wisconsin nuclear plant not health risk . 15 March 2022 . AP NEWS . 27 March 2018 . en.
  9. News: Hubbuch . Chris . Report: Source of radioactive groundwater located; no contamination of drinking water, Mississippi River . 15 March 2022 . Wisconsin State Journal . 28 January 2019.
  10. News: EnergySolutions Completes Work at La Crosse Boiling Water Reactor (LACBWR) Decommissioning Project . 15 March 2022 . GlobeNewswire . 12 November 2019 . en.
  11. News: Hubbuch . Chris . Project delays plague company seeking to buy Kewaunee nuclear plant . 15 March 2022 . Wisconsin State Journal . 27 September 2021.
  12. News: US NRC delays release of La Crosse and Zion sites for unrestricted use - Nuclear Engineering International . 15 March 2022 . Nuclear Engineering International . 20 September 2021.
  13. News: La Crosse BWR site released for unrestricted use . 24 August 2023 . www.ans.org . Radwaste Solutions . en.
  14. Web site: La Crosse Boiling Water Reactor . NRC Web . Nuclear Regulatory Commission . 24 August 2023.