LRT Line 2 explained

Box Width:300
LRT Line 2
Owner:Light Rail Transit Authority
Locale:Metro Manila & Rizal, Philippines
Type:Rapid transit / Heavy rail
System:Manila Light Rail Transit System
Status:Operational
Stations:13[1]
Routes:1
Daily Ridership:138,455 (2023)[2]
Ridership2:49,428,645 (2023)
Linenumber:2
Operator:Light Rail Transit Authority
Character:Elevated
Underground
Depot:Santolan, Pasig
Stock:LRTA 2000 class
Linelength Km:17.6
Tracks:Double
Minradius:Mainline:
Depot:
Electrification: overhead catenary
Speed Km/H:60
Signalling:Siemens TBS100 fixed block ATC under ATO GoA 2 (STO), with subsystems of ATP, Rail9000 ATS, and Westrace MK1 CBI[3]
Maxincline:5%
Map State:collapsed
Aveinterstation:1.28km (00.8miles)

The Light Rail Transit Line 2, also known as LRT Line 2, LRT-2, or Megatren, is a rapid transit line in Metro Manila in the Philippines owned and operated by the Light Rail Transit Authority (LRTA). The line generally runs in an east–west direction between in Manila and . The line is officially referred to as the Purple Line.

Although commonly known as LRT-2, the line is a high capacity heavy rail line that uses large metro cars which are longer and wider than those used on the PNR network and roughly the same size as those used on the MTR in Hong Kong, instead of the light rail vehicles used in earlier lines.[4] Until the opening of MRT Line 7 in 2025, it is the country's only line using these types of trains.

Envisioned in the 1970s as part of the Metropolitan Manila Strategic Mass Rail Transit Development Plan, it was first planned in 1988 and stalled years later when Japan's official development assistance funds stepped in, the thirteen-station, 17.6adj = onNaNadj = on line was the third rapid transit line to be built in Metro Manila when it started operations in 2003. The line became the first rapid transit line extending outside the Metro Manila area after its extension to Antipolo, Rizal opened in 2021.

The line is integrated with the public transit system in Metro Manila, and passengers also take various forms of road-based public transport, such as buses and jeepneys, to and from a station to reach their intended destination. It is the least busy among Metro Manila's three rapid transit lines, with total ridership significantly below the line's built maximum capacity, serving about 140,000 passengers daily in 2023. Regardless, the line encounters periods of peak ridership during rush hour in the morning and the evening. Expanding the network's revenue line to accommodate more passengers is set on tackling this problem, with plans of a three-station westbound extension in Manila by 2024 and another eastbound extension towards downtown Antipolo.

History

Planning and early delays

During the construction of the first line of the Manila Light Rail Transit System in the early 1980s, a Swiss company called Electrowatt Engineering Services designed a comprehensive plan for metro service in Metro Manila. The plan—still used as the basis for planning new metro lines—consisted of a 150sp=usNaNsp=us network of rapid transit lines spanning all major corridors within 20 years, including a line on the Radial Road 6 alignment, one of the region's busiest road corridor.

On March 16, 1988, the project was approved by the cabinet, and a feasibility study for the LRT Line 2, then called the MRT Line 2 project,[5] that would connect Marikina to the City of Manila via Aurora Boulevard and Ramon Magsaysay Boulevard was carried out in the same year.[6] Lavalin of Canada was interested in planning to build the line when the Philippine government would look to have a contract similar to the Bangkok system that was to be developed by the company (this was cancelled in 1992).[7] The project was to be bid out as a build-operate-transfer project together with the LRT Line 1 capacity expansion project in 1989.[6] In the same year, when President Corazon Aquino directed transportation secretary Rainerio Reyes to speed up the implementation of the line, the project was one of the 10 major infrastructure projects worth ₱8.7 billion.[8] [9]

Although sixteen firms were reported to have submitted bids for the line's construction,[10] the bidding failed, causing delays. Only one consortium, made up of Japanese-European firms (Marubeni, Leighton, and Tractabel) and another Japanese firm, RRA International, attended the actual bidding. This means that the bidding for LRT 2 as a BOT project was unilaterally cancelled by transportation secretary Oscar Orbos, apparently in favor of a “ground-level” transit system.[11]

Another feasibility study was conducted in 1991 with financing from the Overseas Economic Cooperation Fund (OECF). The final revised project was approved on December 13, 1995 as a separate project from the LRT-1 capacity expansion project.[12] [13] Early in 1994, the planned route was to run from Recto inside the Old Bilibid Prison to Katipunan, totaling 11.8 kilometers, but the actual route is 10 kilometers; the plan was also to have a depot located at the vacant site of Quezon Institute, and the plan was to have 26 2-car trains.[14]

Construction and opening

The LRT Line 2 project officially began in 1996, twelve years after the opening of Line 1, with the granting of the official development assistance loans from the Japan Bank for International Cooperation (JBIC)[15] for the line's construction starting in March of that year. The LRTA would have ownership of the system and assume all administrative functions, such as the regulation of fares and operations as well as the responsibility over construction and maintenance of the system and the procurement of spare parts for trains.

Construction started with a groundbreaking ceremony on November 15, 1997, after the LRTA signed the first three packages of the agreement with Sumitomo Corporation delivering Package 1 in which covers the construction of the depot and its facilities,[20] [21] while the HanjinItochu joint venture delivered packages 2 and 3 in which covers the substructure and the superstructure plus the stations respectively.[22] [23]

The project suffered delays in 1998 when the fourth package of the project, which includes the communications and fares systems, vehicles, and trackworks, were alleged to be anomalous, according to Senator Juan Ponce Enrile.[24] Although it was promptly corrected by the Estrada administration after it assumed power in the middle of that year, it encountered similar problems two years later. In April 2000, the National Economic and Development Authority (NEDA) met with officials from the Department of Transportation and Communications (DOTC). Out of the eight bidders, only two, Ansaldo; and Mitsui with Siemens, passed the technical evaluation process. To accommodate more bidders, especially that another two were disqualified, NEDA Secretary Felipe Medalla reportedly planned to lower the pre-qualification criteria from seventy percent to fifty percent, a move strongly opposed by the DOTC which reiterated that the seventy percent passing mark was only approved by the JBIC. However, Medalla reportedly justified his actions, saying that the JBIC was dissatisfied with the two qualified bidders and would stop all loans to the Philippines if more bidders were not added.[25]

Finally, in September 2000, Package 4 was awarded to the Asia-Europe MRT Consortium (AEMC), a consortium led by Marubeni and composed of Balfour Beatty, Toshiba, Daewoo Heavy Industries, and a local company which was D.M. Consuji Incorporated (DMCI).[26] [27] AEMC, through Marubeni Corporation, entered into a contract with Singapore Technologies Engineering on December 12 of that year to supply and install the communications system, supervisory control and data acquisition (SCADA) system, automatic fare collection system, and the management information system. The consortium provided the eighteen four-car trainsets built by Rotem and Toshiba.

During construction, the LRTA, along with the project consultants oversaw all the design, construction, equipping, testing, commissioning, and technical supervision of the project activities. Halcrow was appointed in 1997 as the lead consultant for the project.[28]

The pre-casting segmental method, a method used to launch girders and connect them to create a full span, was used in the construction of the original 13.8sp=usNaNsp=us line.

On April 5, 2003, President Gloria Macapagal Arroyo inaugurated the line, effectively opening the first 4.3km (02.7miles) from to . Accompanying the president were former president Corazon Aquino, Transportation Secretary Leandro Mendoza, LRTA chief Teddy Cruz Jr., and other officials, who were the first official passengers of the "Megatren". Fares were free of charge until April 9.[29] All remaining stations opened on April 5, 2004,[30] except for Recto which opened on the following October 29.[31] [32] However, ridership was initially moderate yet still far below expectations, since the passenger volume in this line is not yet fully achieved.

To address passenger complaints on the lack of universal access on earlier train lines, the LRTA made sure during the construction phase that the stations were equipped with universal access by putting up escalators and elevators for easier access, as well as making passenger fares at par with the other existing lines. However, while all stations have elevators to and from the platform, not all stations have elevators to and from the station concourse on both sides of the road.

Extension to Antipolo

Plans to extend the line to Antipolo in the province of Rizal were first laid out in 1999 as part of the Metro Manila Urban Transportation Integration Study Master Plan by the Japan International Cooperation Agency (JICA).[33] The extension was first approved by the Investment Coordination Committee (ICC) board of the National Economic and Development Authority (NEDA) in October 2003.[34] [35]

On August 3, 2006, the Light Rail Transit Authority (LRTA) announced its intention to extend the line eastward to Antipolo, also intending to extend the line westward to Port Area, Manila.[36] In May 2011, LRTA secured commitments from the Philippine National Bank, Development Bank of the Philippines, and the Land Bank of the Philippines to fund the extension project.[37] JICA then released a feasibility study report the following October. The 3.8sp=usNaNsp=us extension, starting from the eastern terminus of up to Antipolo station in Antipolo, called for two additional stations: Emerald station (now) in Marikina near Sta. Lucia Mall and Robinsons Metro East; and Masinag (now), in Antipolo near SM City Masinag. The ₱9.7 billion project, at its current form, was approved by the National Economic and Development Authority chaired by then-President Benigno Aquino III on September 4, 2012.[38] The Philippine national government funded the civil works contracts, while JICA funded the contract for the electrical and mechanical systems as part of its Capacity Enhancement of Mass Transit Systems in Metro Manila Project (CEMTSMMP) through a ¥43.2-billion loan for various projects of railway lines in Metro Manila.[39] The project aimed to accommodate an additional 80,000 passengers and reduce traffic congestion along Marcos Highway.[40]

The first two packages, awarded to D.M. Consunji Incorporated (DMCI), covered the design and construction of the viaduct and stations.[41] Unlike the original line which used the pre-casting segmental method of construction, the east extension viaduct made use of AASHTO girders with a deck slab above the girders.[42] Meanwhile, the third package, awarded to Marubeni and DMCI, covered the design and installation of the railway tracks and electrical and mechanical (E&M) systems of the extension.[43] The project broke ground on June 9, 2015, with an original 2017 deadline.[44] On May 30, 2017, another groundbreaking ceremony was held to mark the start of construction of the two stations.[45] The final phase of construction, covering the installation of the tracks, electrical and mechanical systems, commenced on April 16, 2019.[46] During construction, on March 10, 2017, a truck slammed in a concrete post of the east extension viaduct, killing one and injuring two.[47]

The initial 2017 deadline was not met, largely due to delays in the station's construction and the installation of the electrical and mechanical systems. It was repeatedly moved to 2020, before being delayed to 2021 due to the COVID-19 pandemic.[48] [49] [50] [51] Nevertheless, the extension was inaugurated by President Rodrigo Duterte on July 1, 2021, before formally opening four days later with free rides for two weeks.[52] [53] [54]

In the following two months since its opening, a shuttle service was implemented between Antipolo and Santolan pending the completion of signaling integration, with one train running within the line's extension. This arrangement caused passenger complaints concerning its inefficiency, which was further exacerbated by the lack of operational trains.[55] [56] Seamless end-to-end services were initially expected to begin within two weeks after opening,[57] but only started two months later on September 3, after integration works were completed.

Extension to Cogeo

Plans for the extension to Cogeo were mentioned in 1992.[58] [59] The Japan International Cooperation Agency (JICA) has also proposed for a second phase of the east extension to extend the line to Cogeo and downtown Antipolo. There are provisions at the end of the current rail line at Antipolo station for an extension. Two proposals were presented by JICA: a 3km (02miles), one-station underground extension, and a 6km (04miles), five-station extension, both originating from Antipolo station.[60] As of November 2022, the feasibility study is nearing its conclusion. The extension would have three stations and the alignment is still being finalized.[61] [62] [63]

Route

The rail line serves the cities that Radial Road 6 passes through: Manila, San Juan, Quezon City, Marikina, Pasig (depot), and Antipolo. The rails are mostly elevated and erected either over or along the roads covered, with sections below ground before and after the station, the only underground station on the line.

Stations

The line serves 13 stations along its 17.6sp=usNaNsp=us-route.[64] The western terminus of the line is the station at Recto Avenue, while the eastern terminus of the line is the station along Marikina–Infanta Highway.

Three stations serve as connecting stations between other lines in the metro. is within walking distance to the station of the PNR Metro Commuter Line; is indirectly connected to the station of the same name on the MRT Line 3 through local streets and inter-connected mall passageways inside Araneta City; and is indirectly connected to the station of the LRT Line 1 through a covered walkway. No stations are connected to other rapid transit lines within the paid areas.

LRT Line 2 stations timeline! Date opened !! Project !! Stations
April 5, 2003 Phase 1
April 5, 2004 Phase 2
October 29, 2004
July 5, 2021 East Extension
Legend
Existing terminus
List of stations
NameDistance (km)ConnectionsLocation
Between
stations
Total
0.000Antipolo, Rizal
2.2322.232Marikina
1.7954.027Marikina / Pasig
1.9705.997Quezon City
0.9556.952
1.4388.390
1.1649.554
1.07510.629
0.92811.557San Juan
1.23412.791Manila
1.35714.148
1.38915.537
1.05016.587

<

-- nearest bus stop from future Pier 4 station -->

Operations

The line currently runs from 5:00 a.m. PST (UTC+8) until 9:30 p.m. on a daily basis.[65] It operates almost every day of the year unless otherwise announced. Special schedules are announced via the PA system at every station and also in newspapers and other mass media. During Holy Week, a public holiday in the Philippines, the rail system is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes after Easter Sunday.[66] During the Christmas and year-end holidays, the operating hours of the line are modified and shortened, due to the low ridership of the line during the holidays.[67]

Station facilities, amenities, and services

Station layout and accessibility

Stations in the line are located above ground, except for, which is located underground. Stations have a standard layout, with a concourse level and a platform level. The concourse contains ticket booths and is usually below the platform except for the underground station, with stairs, escalators and elevators leading down to the platform level. The levels are separated by fare gates. All stations are barrier-free inside and outside the station, and trains have spaces for passengers using wheelchairs.

Most station platforms are 100m (300feet) long and 3.5to wide, with some stations having a length of 120to. All stations have side platforms, with the exception of, which as an island platform. Part of the platform at the front of the train is cordoned off for the use of pregnant women, children, elderly, and persons with disabilities. At side-platform stations, passengers are able to switch platforms at the concourse level without leaving the closed system, while passengers can easily switch sides at stations with island platforms. Stations have toilets at the concourse level, both inside and outside the closed system.

Folding bicycles are allowed to be brought into trains provided that it does not exceed the LRTA's baggage size limitations of 2by.[68] The last car of each train is also designated as "green zones", where folding bicycle users can ride with their bikes.[69]

The line has a total of 72 escalators and 40 elevators across all 13 stations. However, by 2021, only a few elevators and escalators remain operational due to anomalies and corruption involving the procurement contracts,[70] [71] causing complaints from passengers.[72] The elevators and escalators are being repaired and restored since 2022,[73] and more are being repaired and restored as of April 2022.[74]

Shops and services

Stations have at least one stall or stand where people can buy food or drinks, which vary by station. Some stations, such as, are connected at concourse level to nearby buildings, such as shopping malls, for easier accessibility.

Since November 19, 2001, in cooperation with the Philippine Daily Inquirer, passengers have been offered copies of the Inquirer Libre, a free, tabloid-size, Tagalog version of the Inquirer, which is available at all stations.[75] [76]

Ridership

The line is designed and was forecasted to carry 570,000 passengers daily.[77] However, the line operates under its designed capacity since its opening,[78] government officials have admitted that system extensions are overdue, although in the absence of major investment in the system's expansion, LRTA has resorted to experimenting with and/or implementing other solutions to maximize the use of the system, including having bus feeder lines.[79]

Before the pandemic, the line had a ridership of 200,000 passengers, but the ridership soon decreased in 2019 due to lack of trains and a power trip that closed three stations in October 2019 that was reopened in January 2021. The line served 33,267 passengers daily on average in 2021, with eight trains available for revenue service running at an operating speed of 60km/h in ten-minute intervals, and one train in reserve for rush hour services, which cuts the time intervals to a minimum of eight minutes.[80]

Statistics

YearDaily Average[81] Yearly Total
20039,221 2.36 million[82]
2004 61,337 23.03 million
2005 116,082 41.90 million
2006 132,154 47.57 million
2007 147,032 52.93 million
2008 161,846 58.59 million
2009 171,996 62.09 million
2010 175,501 63.36 million
2011 176,818 63.81 million
2012 194,268 70.33 million
2013 197,924 71.45 million
2014 201,794 72.85 million
2015 172,318 62.21 million
2016 185,071 67.00 million
2017 182,708 65.96 million
2018[83] 177,260 64.70 million
2019[84] 156,110 56.98 million
2020 45,463 12.50 million
2021 33,267 11.84 million
2022[85] 88,597 31.63 million
2023 138,455 49.42 million

Rolling stock

See main article: LRTA 2000 class. The line runs sixteen electric multiple units made in South Korea by Hyundai Rotem powered by Toshiba-made VVVF inverters.[86] The trains came in together with the fourth package during the system's construction. The four-car trains have a capacity of 1,628 passengers, which is more than the normal capacity of the rolling stock of Lines 1 and 3. The trains are capable of running at a maximum design speed of 80km/h, but only run at a maximum operational speed of 60km/h. These trains prominently use wrap advertising.

In 2017, the entire train fleet was retrofitted with the TUBE (formerly known as PARDS), a passenger information system powered by LCD screens installed near the ceiling of the train that shows news, advertisements, current train location, arrivals and station layouts.[87]

In 2019, the train ventilation was upgraded to replace the aging air-conditioning units and to alleviate complaints of the commuters for uncomfortable hot rides.[88] Two years later, three train sets underwent refurbishment and resulted in new fitted propulsion systems and train monitoring systems from Woojin Industrial Systems.[89]

The LRTA is also acquiring 14 additional train sets by 2020 to augment the existing 18 sets, due to the expected increase of passengers ahead of the East Extension, and the West Extension.[90] The purchase however was delayed to 2022.[91]

Included in the design-and-build contract of the west extension is the procurement of five four-car train sets.

Depot

The line maintains an at-grade depot in Barangay Santolan in Pasig, near Santolan station in the side of Barangay Calumpang in Marikina. The depot occupies approximately 10ha of space and serves as the headquarters for light and heavy maintenance.[28] Due to its location in a flood-prone area, the depot was raised 2m (07feet) above ground level.[28] It is connected to the mainline network by a spur line.

The depot is capable of storing 24 sets of electric multiple units, with the option to expand to include more vehicles as demand arises. They are parked on several sets of tracks, which converge onto the spur route and later on to the main network.[92]

There are eight decommissioned 1000 class and one set of 1100 class trains formerly used in LRT Line 1 being stored in this depot due to the expansion of the Line 1 depot in Parañaque.

Other infrastructure

Signaling

The line uses a fixed block system with automatic train control (ATC), which has three subsystems: automatic train protection (ATP), automatic train operation (ATO), and Rail9000 automatic train supervision (ATS). The ATO subsystem automatically drives the trains, while the opening and closing of doors is controlled by an onboard train attendant. The ATP system, meanwhile, maintains safe operations and monitors the train's speed. Lastly, the Rail9000 ATS system is located at the operations control center at the line's Santolan Depot, which directs train operations and monitors the train movement along the line. Other components of the signaling system includes train detection through track circuits and Westrace MK1 computer-based interlocking.[93]

The signaling equipment were manufactured by Westinghouse Signals (later Westinghouse Rail Systems, acquired by Siemens in 2013).[94]

The signaling system was upgraded with the replacement of its communication link and the upgrading of the Westrace interlocking module. The project started on February 15, 2022,[95] and was completed on March 29.[96]

Tracks

The rails are 54sp=usNaNsp=us rails designed to the UIC 54 rail profile. The rails are supported by concrete plinths.[97]

Plans and proposals

West extension

A 3.02adj=onNaNadj=on extension of the line to the Manila North Harbor in Tondo, Manila has been proposed. It was first announced in August 2006, when the LRTA announced its intention to extend the line eastward to Antipolo and westward to the Pier 4 of the Manila North Harbor. It was approved by the National Economic and Development Authority (NEDA) on May 19, 2015. The construction of this extension would create three stations, one near the Tutuban PNR station, one in Divisoria, and one near the North Port Passenger Terminal in Manila North Harbor's Pier 4 which would serve as its terminus.[98] In an interview, LRTA Administrator Ret. Gen. Reynaldo Berroya stated that they are aiming to finish the project by 2022 to 2023.

The total project cost is estimated to be ₱10.12 billion. In 2019, WESTRAX Joint Venture was awarded the contract for the consultancy services for the project.

In October 2019, the project was under bidding process, consisting 3 stations,,, and, with the project scheduled to be completed by 2024.[99]

On August 27, 2020, the Light Rail Transit Authority published the bidding documents for the design-and-build contract for the west extension. According to the documents, the turn back area after the station will have three tracks; two of which are the main tracks and one serves as a pocket track. The three stations will feature side platforms.[100]

The project was originally planned to be funded through a public-private partnership (PPP) scheme, in line with the Marcos administration's policy to use the said scheme to complete various infrastructure projects. The contract would have also covered the procurement of five new four-car trains, along with the maintenance of the line and the refurbishment of the trains.[101] However, it was decided that the government will instead fund the project through the national budget.

Privatization

The privatization of the operations and maintenance of Line 2 was planned by the then-Department of Transportation and Communications (DOTC; later the Department of Transportation as part of the agency's improvement and modernization of the railway lines in the Philippines. The bidding process for this project begun on September 13, 2014.[102] In this project, the interested companies were required to submit pre-qualification documents and submit a bid proposal if the company is qualified for the bidding. In January 2015, four companies submitted pre-qualification documents for the project. The bidders included Aboitiz Equity Ventures with SMRT Transport Solutions (Aboitiz Equity Ventures and SMRT International Pte Ltd. through SMRT Trains),[103] DMCI Holdings with Tokyo Metro, Light Rail Manila 2 Consortium (RATP and Metro Pacific),[104] and San Miguel Corporation with Korea Railroad Corporation. All bidders were pre-qualified for the bidding.[105] However, the project would eventually be shelved in 2016.

In 2017, it was reported that the Metro Pacific Investments Corporation was interested in a possible auction for the privatization of the line.[106] The plan to privatize the operations and maintenance of the line was restarted in October 2019, following a power trip that damaged two rectifiers.[107] Since then, no new reports have surfaced about this plan as of 2021.

Capacity expansion and upgrade

Due to the aging of the line, a capacity expansion project for the line was announced in April 2022. The project would include upgrades to the trains, signaling, telecommunications, power supply, overhead systems, railway tracks, and other system equipment. The project is still under the stages of the procurement of a consultant for the project, which would assess the current condition of the line.[108]

TÜV Rheinland has been shortlisted for the list of consultants and is the only consultant to be shortlisted in June 2022.[109]

Like the west extension, the upgrading of the train cars would be funded through a public-private partnership scheme. The contract would also cover the maintenance of the line and the construction of the west extension.

Incidents

  • On June 11, 2011, a man jumped in front of a moving train at the Araneta Center-Cubao station, leaving the man severely injured. This forced the line operations to be suspended.[110] [111]
  • On May 9, 2017, at 4:03 PM, a tree fell to the tracks at the Anonas area, causing the line's operations to be disrupted and a 2000 class train nearby was hit. The Department of Public Works and Highways local office was doing roadworks at the site of the incident when they accidentally hit a tree that fell on the tracks. Partial operations between Recto and V. Mapa were implemented, until the line's operations were suspended an hour later. The incident area was cleared and full operations resumed at 7:41 PM.[112]
  • On May 30, 2018, a damaged cable between J. Ruiz and V. Mapa stations caused limited operations between Santolan and Araneta Center-Cubao stations at 11:46 AM. Normal operations resumed at 7:46 PM.[113]
  • On May 18, 2019, two trains collided between Anonas and Cubao stations, injuring 34 passengers, with none in critical condition.[114] [115] Revenue operations were suspended to give way to maintenance checks, and normal operations resumed at 10:47 AM the next day.[116] Trainset no. 18 returned to service in June 2021,[117] while Trainset no. 13 returned to service in September 2021.
  • On October 2, 2019, at 9:43 am, a lightning struck the station, causing the power transformers at the and stations to trip and disrupt the power supply. The operations of the line were suspended for safety checks and normal operations resumed at 10:11am.[118]
  • On October 3, 2019, another power trip caused rectifier substations located between Anonas and Katipunan stations and in the Santolan depot to catch fire at around 11 in the morning, cutting the line's power supply in the area. Line operations from Recto to Santolan were suspended at 11:24 am, and passengers were evacuated from the line with no injuries. The LRTA, MMDA and the Philippine Coast Guard immediately deployed shuttle buses to help ferry stranded passengers. Partial operations between Cubao and Recto stations resumed on October 8, 2019, while Santolan, Katipunan and Anonas Stations are expected to reopen after nine months. The initial estimated amount of damages is at around PHP428 million.[119] Due to the incident, the Light Rail Transit Authority claimed full operations would be back in 2 to 3 months.[120] As the initial deadline was not met the three stations that were caught in a power trip were expected to resume services at the end of June 2020.[121] However, this deadline was also not met due to delays brought by the COVID-19 pandemic, rescheduled for the first quarter of 2021.[122] Finally, the three stations were reopened, albeit in partial speed, on January 22, 2021. The reopening was made possible by a temporary power supply system installed in the damaged portion while the proper systems are still on order and awaiting delivery.
  • On October 8, 2020, a fire broke out in the electrical room at causing the operations to be suspended at 5:10am. The fire damaged the station's uninterruptible power supply. Normal operations returned a few hours later.[123] [124]
  • On September 17, 2021, a defective catenary wire at the east extension area caused disruptions in operations. A shuttle service between Santolan and Antipolo was implemented at 9:43 AM. On the same day, the line's operations were briefly suspended at 11:36 AM after a tangled t-shirt was seen hanging at the contact wires between Cubao and Anonas stations. Operations with the shuttle service resumed at 11:49 AM, while full end-to-end operations were known to be resumed the following day.[125]
  • On October 9, 2021, an entangled balloon was discovered between V. Mapa and Pureza stations, causing the line's operations to be temporarily suspended. The operations resumed after 30 minutes.[126]
  • On August 17, 2024, a street dweller was spotted in between the rail line’s Pureza and Legarda stations. The situation forced to limit the train line's service from Antipolo to V. Mapa. Normal operations resumed after a few hours.[127]
  • On August 19, 2024, a catenary cable caught fire between the Katipunan and Santolan stations. This led the line's operations to be limited from Recto to Cubao. It was only the following morning wherein full operations resumed.[128]

External links

Notes and References

  1. Web site: The Line 2 System . Light Rail Transit Authority . June 10, 2014 . dead . https://web.archive.org/web/20141011002758/http://www.lrta.gov.ph/line_2_system.php . October 11, 2014.
  2. Web site: LRT-2 Sets New Ridership Record with Over 49 Million Passengers in 2023 Light Rail Transit Authority . 3 January 2024.
  3. August 9, 2017 . Maintenance of the Manila LRT Line 2 System, Terms of Reference . Light Rail Transit Authority . Light Rail Transit Philippines . 2021-12-26 . live . https://web.archive.org/web/20200612124628/http://publiccontent.sinpro.cz/PublicFiles/2017/11/26/PB17-167-8.Bidding%20Document.072523311.pdf . 2020-06-12 .
  4. News: It's a misnomer! Light Rail Transit Line 2 is actually a heavy rail-subway system. Catalina Ricci S.. Madarang. October 7, 2019. InterAksyon. January 5, 2022.
  5. News: March 17, 1988 . Tutuban-Cubao LRT okayed . Manila Standard.
  6. A Tale of Three Cities: Urban Rail Concessions in Bangkok, Kuala Lumpur and Manila – Final Report . World Bank . Author . 17 . December 2, 2004 . dead . https://web.archive.org/web/20060424181753/http://siteresources.worldbank.org/INTEAPINFRASTRUCT/Resources/855084-1137106254308/threecities.pdf . April 24, 2006. (Prepared by Halcrow Group Limited).
  7. News: December 10, 1988 . Doubly hurting . Manila Standard . 10.
  8. News: March 11, 1989 . Cory: Speed up implementation of new LRT line . Manila Standard . 9.
  9. News: April 20, 1989 . New LRT must be better . Manila Standard . 10.
  10. News: Cuneta . Jopen. 1990-04-16. 16 foreign firms file bids for construction of LRT 2. Malaya.
  11. News: May 3, 1990 . New bidding for LRT II mulled . The Philippine Star . 13.
  12. News: August 20, 1991 . Manila rail project to get foreign loans . The Business Times . 18.
  13. News: December 13, 1995 . P-26B LRT 2 project okayed . Manila Standard . 15.
  14. News: June 20, 1994 . DOTC allots P15.7-B for LRT 2 Project . Manila Standard . 6.
  15. Web site: Reyes, Miguel Paolo P. . It's Not You, It's Me? An Inquiry into the Problems of Philippine-Korean Cooperation for Metro Manila's Rail-based Mass Transit Systems . January 31, 2022 . The Mass Transit System in Metro Manila: From Tranvia to MRT, 1879-2014 . University of the Philippines Diliman.
  16. COA, 1998: n.p.
  17. Web site: Philippines Projects Fujita . 2024-07-03 . Fujita Corporation . en.
  18. Web site: Metro Manila Mass Rail Transit - Line 2 . 2024-05-20 . Rizzani de Eccher . en-US.
  19. Web site: Singapore Technologies Electronics. . Electronics Systems Package for Manila Line 2, Philippines . dead . https://web.archive.org/web/20061118052824/http://www.stee.stengg.com/lsg-grp/capabilities/pdf/transport/rail/13022006/eSys_Package-Manila-LRT-Line2.pdf . November 18, 2006 . February 6, 2022 . Singapore Technologies Engineering.
  20. Web site: 日本財団図書館(電子図書館) マニラ首都圏の公共交通整備に関する研修用ソフト制作事業 利用手引書 . 2024-05-17 . nippon.zaidan.info.
  21. Web site: Package 1 - Depot . dead . https://web.archive.org/web/20060505004155/http://www.lrta.gov.ph/projects/proj_mmsmrtdp_pack1.htm . May 5, 2006 . December 23, 2021 . Metro Manila Strategic Mass Rail Transit Development Project Line 2 - Megatren . Light Rail Transit Authority.
  22. Web site: Package 2 - Substructure . dead . https://web.archive.org/web/20060505004210/http://www.lrta.gov.ph/projects/proj_mmsmrtdp_pack2.htm . May 5, 2006 . December 23, 2021 . Metro Manila Strategic Mass Rail Transit Development Project Line 2 - Megatren . Light Rail Transit Authority.
  23. Web site: Package 3 - Superstructure and Stations . dead . https://web.archive.org/web/20060505004202/http://www.lrta.gov.ph/projects/proj_mmsmrtdp_pack3.htm . May 5, 2006 . December 23, 2021 . Metro Manila Strategic Mass Rail Transit Development Project Line 2 - Megatren . Light Rail Transit Authority.
  24. News: 1998-02-03 . Anomaly in LRT-2 bidding - Enrile . Today.
  25. Web site: 2000-05-03 . LRT 2 bidding hounded by alleged anomalies . 2024-05-29 . Philstar.com.
  26. News: Baetiong . May Czarina A. . 2000-09-13 . Marubeni-led consortium bags light railway contract . Business World.
  27. Web site: Package 4 - Systems, Vehicles and Trackworks . dead . https://web.archive.org/web/20060505004214/http://www.lrta.gov.ph/projects/proj_mmsmrtdp_pack4.htm . May 5, 2006 . December 23, 2021 . Metro Manila Strategic Mass Rail Transit Development Project Line 2 - Megatren . Light Rail Transit Authority.
  28. Web site: Manila light rail transit – Purple Line . dead . https://web.archive.org/web/20100426021331/http://www.halcrow.com/Our-projects/Project-details/Manila-LRT-Philippines/ . April 26, 2010 . April 5, 2022 . Halcrow.
  29. News: GMA leads Megatren inauguration. Marichu A. . Villanueva . April 6, 2003 . The Philippine Star . June 27, 2024.
  30. Web site: Railway Operations. Light Rail Transit Authority. https://web.archive.org/web/20210724021116/https://www.lrta.gov.ph/railway-operations/. July 24, 2021. September 3, 2021. live.
  31. Web site: The Metro Manila Strategic Mass Rail Transit Development Line 2 Project. Light Rail Transit Authority. December 23, 2021. dead. https://web.archive.org/web/20060517095706/http://www.lrta.gov.ph/projects/proj_mmsmrtdp.htm. May 17, 2006.
  32. News: Bergonia, Allan. October 28, 2004. Line 2 Recto Station Opens. People's Journal. dead. https://web.archive.org/web/20050308020226/http://www.lrta.gov.ph/news/news_item_102804_RectoStationsOpens.htm. March 8, 2005. May 11, 2006. lrta.gov.ph.
  33. News: Emmie V.. Abadilla. P4.5-B LRT-2 East Extension to start operation next week. Manila Bulletin. 2021-07-01. 2021-07-01. live. https://web.archive.org/web/20220309201028/https://mb.com.ph/2021/07/01/p4-5-b-lrt-2-east-extension-to-start-operation-next-week/. 2022-03-09.
  34. Web site: MRT Line 2 East Extension Project . Light Rail Transit Authority . February 18, 2022 . dead . https://web.archive.org/web/20031017102039/http://www.lrta.gov.ph/projects/proj_l2eastex.htm . October 17, 2003.
  35. News: Abigail L. . Ho . Extension of LRT Line 2 to Antipolo gets NEDA backing . Philippine Daily Inquirer . February 18, 2022 . dead . https://web.archive.org/web/20070312213710/http://www.lrta.gov.ph/news/news_item_101403_ExtLine2NEDAbacking.htm . October 14, 2003 . March 12, 2007.
  36. News: Gov't planning to extend LRT Line 2 . GMA News . August 3, 2006 . April 4, 2022.
  37. News: Govt secures commitments for LRT 2 extension funds . May 9, 2011 . Darwin G. . Amojelar . The Manila Times . February 18, 2022 . Public-Private Partnership Center.
  38. News: Neda Board OKs 9 big projects . Gonzalez . Mia M. . dead . https://web.archive.org/web/20120906032601/http://businessmirror.com.ph/home/top-news/32326-neda-board-oks-9-big-projects . September 4, 2012 . September 6, 2012 . September 6, 2012 . Business Mirror.
  39. Status of LRT Projects as of December 31, 2021. January 19, 2022. 4. January 31, 2022. Light Rail Transit Authority. dead. https://web.archive.org/web/20220131070307/https://www.lrta.gov.ph/wp-content/uploads/2022/01/project-status-as-of-December-31-2021.pdf. January 31, 2022.
  40. Web site: Ong. Ghio. 2021-01-10. 3 LRT-2 stations set to reopen. 2021-01-12. Philstar.com.
  41. News: DMCI bags P2.3-B LRT-2 extension project. ABS-CBN News. January 27, 2015. July 8, 2021.
  42. PREPARATORY STUDY FOR LRT LINE2 EXTENSION PROJECT : FINAL REPORT. Japan International Cooperation Agency. Japan International Cooperation Agency. October 2011. November 8, 2021.
  43. Web site: LRT Line 2 East Extension Project Awarded to Marubeni-DMCI. Marubeni Philippines Corporation. March 7, 2019. July 8, 2021.
  44. News: Next stop, Antipolo: LRT-2 begins expansion. Jacque. Manabat. ABS-CBN News. June 9, 2015. April 27, 2022. unfit. https://web.archive.org/web/20160602183132/https://news.abs-cbn.com/business/06/09/15/next-stop-antipolo-lrt-2-begins-expansion. June 2, 2016.
  45. Web site: DOTr AND LRTA BREAKS GROUND FOR LRT2 EAST EXTENSION PROJECT - PACKAGE 2. dotr.gov.ph. Department of Transportation. July 8, 2021. July 9, 2021. https://web.archive.org/web/20210709184600/https://dotr.gov.ph/10-press-releases/240-dotr-and-lrta-breaks-ground-for-lrt2-east-extension-project-package-2.html. dead.
  46. News: Final phase of LRT-2 extension project starts. Richmond. Mercurio. The Philippine Star. 17 April 2019. 30 November 2021.
  47. News: Marlly Rome C.. Bondoc. One dead, two injured as dump truck slams into LRT-2 post in Marikina. GMA News. March 10, 2017. November 10, 2021.
  48. Web site: Quismorio. Ellson. Anticipating Antipolo: DOTr hypes up April opening of new LRT-2 stations. February 26, 2021. March 2, 2021. Manila Bulletin. dead. https://web.archive.org/web/20220521014954/https://mb.com.ph/2021/02/26/anticipating-antipolo-dotr-hypes-up-april-opening-of-new-lrt-2-stations/. May 21, 2022.
  49. News: LRT2 East Extension to commence ops on April 27. Ted. Cordero. GMA News. March 4, 2021.
  50. News: Rey, Aika . COVID-19 curbs delay LRT2 East Extension opening to June 23 . Rappler . 16 April 2021 . 16 April 2021.
  51. News: LRT-2 East Extension Project inauguration moved; weekend closures announced. CNN Philippines. June 21, 2021. June 22, 2021. June 21, 2021. https://web.archive.org/web/20210621175511/https://cnnphilippines.com/news/2021/6/21/lrt-2-extension-project-inauguration-postponed.html. dead.
  52. News: Leandre. Grecia. The new LRT-2 stations in Marikina and Antipolo are now operational. Top Gear Philippines. 2021-07-05. 2021-07-05.
  53. News: Manila Light Rail Transit Line 2 East Extension Line Starts Operation. Marubeni Corporation. July 6, 2021. July 8, 2021.
  54. News: Duterte: Free rides from Antipolo to Santolan stations, vice versa for 2 weeks. GMA News. July 1, 2021. July 1, 2021.
  55. News: New LRT-2 stations riddled with long queues on first day of operations. Top Gear Philippines. Leandre. Grecia. July 5, 2021. November 24, 2021.
  56. Web site: Clara. Rosales. Free Rides, Fares, More: LRT-2 Marikina, Antipolo Stations Open Today. reportr.world. November 24, 2021. July 2, 2021.
  57. News: More trains to operate in LRT-2 east extension after July 18 – LRTA. CNN Philippines. July 5, 2021. July 6, 2021. July 6, 2021. https://web.archive.org/web/20210706020744/https://www.cnnphilippines.com/news/2021/7/5/More-trains-operate-LRT-2-East-Extension-after-July-18---LRTA-.html. dead.
  58. News: July 18, 1992 . DOTC told to speed up on LRT phase II . Manila Standard . 15.
  59. News: August 22, 1992 . LRT II to be constructed by year' end . Manila Standard . 7.
  60. Web site: March 2014. ROADMAP FOR TRANSPORT INFRASTRUCTURE DEVELOPMENT FOR METRO MANILA AND ITS SURROUNDING AREAS (REGION III&REGION IV-A). live. July 18, 2021. 14. https://web.archive.org/web/20200627170121/https://openjicareport.jica.go.jp/pdf/12149654.pdf. June 27, 2020.
  61. News: 3 new stations mulled on Rizal end of LRT-2 . Elijah Felice . Rosales . The Philippine Star . November 1, 2022 . November 2, 2022.
  62. News: Antipolo discusses LRT-2 extension project, sees great benefits for the city . September 30, 2022 . October 1, 2022 . Politiko South Luzon.
  63. News: LRT-2 extension under study . BusinessWorld Online . 21 August 2023.
  64. YEAR-END ACCOMPLISHMENT REPORT . . December 31, 2021 . March 8, 2022.
  65. News: Pia . Regalado . LRT-2 Extends Operating Hours at Night . reportr.world . June 18, 2022 . June 17, 2022.
  66. News: MRT, LRT-2 to suspend operations during Holy Week holidays . March 13, 2023 . ABS-CBN News . March 13, 2023.
  67. News: Here are the LRT-1, LRT-2, MRT-3 schedules for Christmas 2021. Leandre. Grecia. Top Gear Philippines. 21 Dec 2021. 2021-12-21.
  68. Web site: Wala pong limit sa diameter ng wheels. Kaugnay naman po ng bagahe, hanggang 2 feet x 2 feet po ang maximum dimension na pinapayagan sa LRT-2. . 2022-05-15 . Twitter . en.
  69. Web site: Dedace . Sophia . Bikes, trains, and fewer cars with LRT's Bike O2 project . 2022-05-15 . GMA News Online . November 18, 2009 . en.
  70. LRTA management files corruption cases against agency execs, contractors linked to anomalous purchase of substandard equipment. Light Rail Transit Authority. 2022-01-05. 2021-12-13.
  71. News: Karen. Villanda. LRTA files graft case due to anomaly purchase of LRT-2 equipment . PTV News. 2021-12-13. 2022-01-05.
  72. News: LRTA apologizes for defective elevators, escalators; complaints filed vs officials allegedly involved in anomalous purchase. Ted. Cordero. GMA News. 2022-01-08. 2022-01-09.
  73. News: 28 more LRT-2 elevators, escalators restored. Raymond Carl. Dela Cruz. 20 January 2022. Philippine News Agency. 21 January 2022.
  74. News: Escalators, elevators ng LRT-2, operational na simula Lunes . Mer . Layson . Pilipino Star Ngayon . fil . April 18, 2022 . April 19, 2022.
  75. News: Ulanday, Abelardo S. . December 9, 2001 . The best things in life are Libre . August 14, 2014 . Philippine Daily Inquirer . Google News Archive.
  76. Web site: Vega . Chito dela . 2017-01-16 . Libre renews train distribution contracts . 2024-06-08 . INQUIRER.net . en.
  77. Metro Manila Strategic Mass Rail Transit Development (I), (II), (III) . . 2009 . April 4, 2022.
  78. Republic of the Philippines: Metropolitan Manila Strategic Mass Rail Transit Development-Line 2 . Climate-Eval (GEF IEO) . Author . August 2009 . August 18, 2014 . https://web.archive.org/web/20140821050643/https://www.climate-eval.org/sites/default/files/evaluations/429%20philippines08.pdf . August 21, 2014 . dead. (Prepared by Sanshu Engineering Consultant)
  79. Interim Performance Scorecard for CY 2013 . Light Rail Transit Authority . Author . October 29, 2013 . August 18, 2014 . https://web.archive.org/web/20140821030757/http://www.lrta.gov.ph/upload/3.%202013%20Interrim%20Scorecard.pdf . August 21, 2014 . dead .
  80. Web site: Status and availability of the Line 2 train fleet. eFreedom of Information. Government of the Philippines. 29 December 2021.
  81. Web site: Monthly Ridership – Line 2 System Ridership . Light Rail Authority . January 4, 2019.
  82. News: LRT 2 Close to Hitting 2004 Ridership Target . Daily Tribune . Light Rail Transit Authority . 2004-08-09 . dead . https://web.archive.org/web/20041112182040/http://www.lrta.gov.ph/news/news_item_080904_LRT2CloseToTarget.htm . 2004-11-12 . 2022-03-29.
  83. Annual Report 2018 . . 20 . December 31, 2018 . January 2, 2020 . https://web.archive.org/web/20200102203335/http://lrta.gov.ph/images/upload/Annual-Report-2018.pdf . January 2, 2020 . dead.
  84. Accomplishment Report - CY2019 . . 17 . December 31, 2019 . March 2, 2022.
  85. News: MRT-3, LRT-2 post surge in ridership . Ghio . Ong . The Philippine Star . January 10, 2023 . January 23, 2023.
  86. Power Systems and Industrial Equipment . Toshiba . 2003 . April 8, 2022.
  87. News: . Line 2 unveils PARDS for passengers . . ANC . May 6, 2017 . May 23, 2020.
  88. News: Rita, Joviland . Expect 'cooler' LRT2 trains as aircon units undergo temporary fix before being replaced . GMA News . March 7, 2019 . November 3, 2021.
  89. Web site: Ted. Cordero. LRT2 to add more running trains by April, says LRTA. GMA News. March 19, 2022. March 11, 2021.
  90. News: Expect more comfortable LRT-2 trains by April: LRTA . March 7, 2019 . Aerol John . Pateña . Philippine News Agency.
  91. News: Arjay . Balinbin . LRT-2 extension 77% complete . Bworldonline.com . February 11, 2020 . March 9, 2021.
  92. LRT LINE 2 OPERATIONS AND MAINTENANCE PROJECT. Department of Transportation and Communications. Department of Transportation (Philippines). Light Rail Transit Authority. Light Rail Transit Authority. September 2014. 22 November 2021. November 22, 2021. https://web.archive.org/web/20211122103848/https://dotr.gov.ph/images/PPP/2014/LRT2_OperationsMaintenance/masinag%20om%20pim%20final.pdf. dead.
  93. Web site: Request for Proposal (Negotiated Procurement) . Light Rail Transit Authority . March 3, 2021 . 23 February 2022.
  94. Contract for the Supply of Various Signaling Equipment (Interlocking, Jointless Track Circuits, and Miscellaneous Wayside) or its approved equivalent . March 16, 2022 . Light Rail Transit Authority . March 22, 2022 . 40–46.
  95. News: LRT-2 delays expected as signaling system undergoes upgrade. Jon Viktor D.. Cabuenas. GMA News. 2022-02-13. 2022-02-13.
  96. Year-End Accomplishment Report (CY 2022) . Light Rail Transit Authority . April 2023 . June 11, 2024.
  97. Rail Section Profiles from TECHNICAL REQUIREMENTS - DRAWINGS. BIDDING DOCUMENTS - CAPACITY ENHANCEMENT OF MASS TRANSIT SYSTEMS IN METRO MANILA: PROCUREMENT OF TRACKWORKS, ELECTRICAL AND MECHANICAL SYSTEMS AND INTEGRATION WITH EXISTING SYSTEMS FOR LRT LINE 2 EAST (MASINAG) EXTENSION PROJECT. February 3, 2022. December 27, 2021. https://web.archive.org/web/20211227171303/https://dotr.gov.ph/images/Foreign_Assisted_Projects/2015/LRT2E-ExtnCE-Track-EM-Intgn/05-BidDocs_LRT2EastExtn-CEP_SGD-2-2.pdf. dead.
  98. News: President Aquino approves Line 2 extension to Manila port area, 6 other infra projects . Roices . Naguit . . May 20, 2015 . dead . https://web.archive.org/web/20150522001634/http://www.interaksyon.com/business/110789/president-aquino-approves-lrt2-extension-to-manila-port-area-6-other-infra-projects . May 22, 2015 . May 19, 2015 .
  99. News: LOOK: Gov't to build 3 more Line 2 stations . October 14, 2019 . October 13, 2019 . ABS-CBN News.
  100. Web site: Bidding of the Design-and-Build Contract for One (1) Lot for LRT Line 2 West Extension Project . Light Rail Transit Authority . August 27, 2020 . March 15, 2022.
  101. News: Bidders sought for P10 billion LRT upgrade, extension . Elijah Felice . Rosales . The Philippine Star . July 25, 2022 . July 25, 2022.
  102. Web site: DOTC awards LRT-1 Cavex PPP; starts bid for LRT-2 O&M. Official Gazette of the Republic of the Philippines. 13 September 2014. 19 September 2021.
  103. Web site: Aboitiz Equity Ventures, Inc. and SMRT Transport Solutions Consortium. PRE-QUALIFICATION OF THE LIGHT RAIL TRANSIT LINE 2 OPERATIONS AND MAINTENANCE PROJECT. 17 February 2015. 3 February 2022. December 27, 2021. https://web.archive.org/web/20211227155446/https://dotr.gov.ph/images/PPP/2014/LRT2_OperationsMaintenance/04-GBB_09-2015_PreQual_LRT2_OM_Aboitiz-Smart_021715.pdf. dead.
  104. Web site: LRM2 Consortium. PRE-QUALIFICATION OF THE LIGHT RAIL TRANSIT LINE 2 OPERATIONS AND MAINTENANCE PROJECT. 17 February 2015. 3 February 2022. December 27, 2021. https://web.archive.org/web/20211227163029/https://dotr.gov.ph/images/PPP/2014/LRT2_OperationsMaintenance/06-GBB_09-2015_PreQual_LRT2_OM_LRM2_021715.pdf. dead.
  105. News: LRT-2 bidding postponed anew. Louella. Desiderio. The Philippine Star. April 2, 2016. September 19, 2021.
  106. News: 6 June 2017. Imee Charlee C.. Delavin. Metro Pacific interested in possible LRT-2 O&M auction. BusinessWorld. 19 September 2021. ppp.gov.ph.
  107. News: Solon pushes for LRT-2 privatization. Filane Mikee. Cervantes. October 8, 2019. Philippine News Agency. September 19, 2021.
  108. Web site: Request for Expression of Interest (REI) for Consulting Services for the LRT Line 2 Capacity Expansion . Light Rail Transit Authority . April 27, 2022 . April 27, 2022.
  109. Consulting Services for the LRT Line 2 Capacity Expansion . Light Rail Transit Authority . 2 June 2022 . June 1, 2022 . 2 June 2022.
  110. News: Dennis. Datu. Jon. Ibanez. Pia. Gutierrez. Man jumps in front of LRT train. June 11, 2011. ABS-CBN News. July 11, 2021.
  111. Man jumps in front of LRT. https://ghostarchive.org/varchive/youtube/20211214/fBaBIVeDHzs . 2021-12-14 . live. YouTube. video. June 19, 2011. July 11, 2021.
  112. News: Raoul. Esperas. LRT-2 operation resumes after clearing of tree branches. ABS-CBN News. May 9, 2017. September 7, 2021.
  113. News: . LRT-2 limits trips over damaged power lines. CNN Philippines. May 30, 2018. April 16, 2021. April 16, 2021. https://web.archive.org/web/20210416130126/https://cnnphilippines.com/news/2018/05/30/lrt-2-santolan-cubao-station.html. dead.
  114. News: Barcelon . Paolo . Authorities to probe Line 2 collision that injured 34 . CNN Philippines . May 19, 2019 . May 19, 2019 . May 19, 2019 . https://web.archive.org/web/20190519091836/http://cnnphilippines.com/news/2019/5/19/authorities-to-probe-LRT-2-collision.html . dead .
  115. News: Rita . Joviland . Probe underway into Line 2 trains collision; 34 hurt . GMA News Online . May 19, 2019 . May 19, 2019.
  116. News: LRT-2 resumes operations after train collision. ABS-CBN News. Bianca. Dava. May 19, 2019. March 7, 2021.
  117. Web site: LRTA Line 2 TS #18 is back on track while TS #13 is 15% complete as of April 2021. . July 13, 2021.
  118. News: Ong . Ghio . Power glitches disrupt LRT-2, MRT-3 operations . Philstar Global . October 3, 2019 . May 26, 2021.
  119. Web site: Line 2 temporarily halts operation due to power supply problem caused by fire . GMA News Online. en-US . October 3, 2019.
  120. Web site: Line 2 full operations eyed to resume in 2 to 3 months . October 14, 2019 . ABS-CBN News . en . February 4, 2020.
  121. Web site: Anonas, Katipunan and Santolan Line 2 stations to be repaired by end of June 2020 . Luna . Franco . February 3, 2020 . Philstar . en-US . live . https://web.archive.org/web/20200606084617/https://www.philstar.com/nation/2020/02/03/1990083/anonas-katipunan-and-santolan-lrt-2-stations-be-repaired-end-june-2020 . June 6, 2020 . February 4, 2020.
  122. Web site: LRT-2 aims to resume full operations by January 2021. 2020-12-20. cnn. en. January 4, 2021. https://web.archive.org/web/20210104064756/https://cnnphilippines.com/news/2020/11/26/LRT-2-full-operations-target-january-2021.html. dead.
  123. Web site: LRT-2 operations suspended after fire breaks out at Santolan station. Top Gear Philippines. Leandre. Grecia. October 8, 2020. April 7, 2021.
  124. News: LRT-2 back to normal ops hours after Santolan Station fire. Philippine News Agency. Raymond Carl. Dela Cruz. October 8, 2020. April 7, 2021.
  125. News: Ghio. Ong. Tangled t-shirt stops LRT-2 train trips. The Philippine Star. September 18, 2021. September 18, 2021.
  126. News: Cordero . Ted . 9 October 2021 . LRT2 stops ops on Saturday morning due to entangled balloon . GMA News . 9 October 2021 .
  127. Web site: Ong . Ghio . LRT-2 limits trips as street dweller climbs post . 2024-08-20 . Philstar.com.
  128. Web site: News . GMA Integrated . 2024-08-20 . LRT-2 on full line operation following catenary repair . 2024-08-20 . GMA News Online . en.