LRT Line 1 (Metro Manila) explained

Box Width:320
LRT Line 1
Owner:Light Rail Transit Authority
Locale:Metro Manila, Philippines
Start:Fernando Poe Jr.
Type:Light rapid transit
System:Manila Light Rail Transit System
Status:Operational
Stations:20 (28 in the future)
Routes:1
Daily Ridership:216,667 (2022)
Ridership2:78 million (2022)
Linenumber:1
Website:,
Event1label:Privatized
Operator:Light Rail Manila Corporation
Character:Elevated
Depot:Baclaran
Zapote (future)
Stock:LRTA 1000 class
LRTA 1100 class
LRTA 1200 class
LRTA 13000 class
Linelength Km:19.7
Tracks:Double
Load Gauge:[1]
Minradius: (mainline)
(depot)
Electrification: overhead catenary
Speed Km/H:60
Signalling:Alstom Atlas 100 ETCS-1
Maxincline:3.535% (mainline)
4% (depot spur line)
Map Name:Route diagram
Map State:collapsed

The Light Rail Transit Line 1, commonly referred to as LRT Line 1 or LRT-1, is a light rapid transit system line in Metro Manila, Philippines, operated by Light Rail Manila Corporation (LRMC) and owned by the Light Rail Transit Authority (LRTA) as part of the Manila Light Rail Transit System. Originally referred to as Metrorail and the Yellow Line, LRT Line 1 was reclassified to be the Green Line in 2012. It travels in a general north–south direction from to, and then east–west from Monumento to Fernando Poe Jr. Currently, the line consists of 20 stations and runs on 19.7sp=usNaNsp=us[2] of fully elevated route. Although it has the characteristics of light rail, such as with the type of rolling stock used, it is more akin to a rapid transit system owing to its total grade separation and high passenger throughput.

First envisioned in a 1977 study conducted by Freeman Fox and Associates which suggested a street-level railway in Manila, the government revised this recommendation to an elevated system. In 1980, President Ferdinand Marcos created the LRTA and construction of the line began the following year. With its partial opening in 1984 and completion the following year, it became the first rapid transit service in Southeast Asia.[3] LRT Line 1 would become one of the busiest among Metro Manila's three rapid transit lines; it served 216,667 daily average passengers in 2022, making it the second-busiest, just behind the MRT Line 3.[4]

The line is integrated with the public transit system in Metro Manila, and passengers also take various forms of road-based public transport, such as buses and jeepneys, to and from a station to reach their intended destination. Although the line aimed to reduce traffic congestion and travel times in Metro Manila, the transportation system has only been partially successful due to the rising number of motor vehicles and rapid urbanization. Expanding the network's revenue line to accommodate more passengers, through extension projects,[5] is set on resolving this problem.

History

Planning and funding

The 1977 Metro Manila Transport, Land Use, and Development Planning Project (MMETROPLAN), a fourteen-month study conducted by Freeman Fox and Associates and funded by the World Bank, recommended the construction of a street-level (at-grade) light rail line in Manila and the proposed four lines that were included in the study that would run along Rizal Avenue, Taft Avenue, España Boulevard, Quezon Avenue, and Shaw Boulevard. A year later, public works secretary Alfredo Juinio announced that the system would consist of streetcars that were seen before the war, and they would accept bids for the project in the next few months.[6]

Following a review by the Ministry of Transportation and Communications, later the Department of Transportation (DOTr), the proposal was revised to an elevated railway to avoid building over the city's many intersections, while the option for an underground line was rejected due to the high water table in Manila; this raised the project's cost from ₱1.5 billion to ₱2 billion. An alignment along Rizal and Taft avenues, which spanned from Monumento, Caloocan in the north to Baclaran, Pasay in the south, was selected because it followed a relatively straight path for most of its route.[7]

On July 12, 1980, President Ferdinand Marcos created the Light Rail Transit Authority (LRTA) and assigned First Lady and Governor of Metro Manila Imelda Marcos as its chairman. While the LRTA confined its roles to policy making, fare regulation, and future planning, the line's operations were assigned to Meralco Transit Organization (Metro, Inc.), a sister company of Meralco. The line came to be referred to as Metrorail.[8]

The Belgian Government granted a ₱300 million soft and interest-free loan for the project's construction, with a repayment period of 30 years. Additional funding was later sourced from a ₱700 million loan, provided by a Belgian consortium consisting of ACEC, La Brugeoise et Nivelles, Tractionnel Engineering International, and Transurb Consult. The consortium also supplied the line's first light rail vehicles, power control, signalling, and telecommunications, as well as provided training and technical assistance. Designed as a public utility rather than a profit center, the line was expected to incur a deficit through 1993, but complete its repayments within a period of 20 years.[8]

Construction and opening

The government-owned Construction Development Corporation of the Philippines was the project's sole contractor.[7] Single column cast-in-place concrete piers carrying precast concrete T-girders and a concrete deck slab were used for the original line from Monumento to Baclaran. The columns are spaced apart by 66to rising from a cap on top of bored or driven concrete piles. Four of the 7sp=usNaNsp=us wide girders are side by side in each span to accommodate bidirectional standard-gauge railway tracks located 20sp=usNaNsp=us above the street level.[9]

Driven piles were originally used for 80 percent of the project, with spread footings being used for the remaining portion. However, during construction, it was determined that bored piles should be utilized in some areas to mitigate noise and avoid potential damage to nearby buildings. Additionally, the original use of stockpiled precast piles caused clutter on the streets during construction.

In 1981, an economic recession hit the country, and the government was unable to provide counterpart funds for civil works and right-of-way acquisition, which amounted to 60 percent of the project's total cost. This led to a delay in construction.[10] Work finally resumed after the economic recession in September of that year along Taft Avenue, between Epifanio de los Santos Avenue (EDSA) and Libertad Street.[11] In order to make way for Carriedo station and a segment of tracks approaching the Pasig River, a department store and a classroom building nearby FEATI University were demolished.[7]

The southern section, between the Baclaran and United Nations stations, was inaugurated on September 11, 1984, by President Ferdinand Marcos. Commercial operations along this section commenced on December 1. The line became fully operational on May 12, 1985, when the northern section between Central Terminal and Monumento opened. During the first several years, two-car trains that could accommodate up to 748 passengers were utilized. This amounted to a capacity of 20,000 passengers per direction.[12]

In July 2000, with the looming expiration of its contract with the LRTA, a labor strike was launched by employees of Meralco Transit Organization (METRO, Inc.). It paralyzed the operations of the line for a week. The LRTA decided not to renew its contract with METRO, Inc. that expired on July 31, 2000, and the former assumed operational responsibility.[13] LRTA undertook this responsibility until September 12, 2015, when the operations and maintenance of the line were privatized to the Light Rail Manila Corporation for thirty-two years as part of the line's south extension.

Capacity expansion and facelift

Line 1 would eventually reach capacity by 1990 due to traffic congestion and air pollution. This led to an extensive refurbishing and structural capacity expansion program funded by Japan's official development assistance. The signing of the loan agreement in December 1994 marked the start of the project.[14] A consortium of Marubeni Corporation, Adtranz, and ABB was tapped in 1996 to execute the project.[15] [16] As part of the initial phase of the expansion project, in addition to structural improvements, Hyundai Precision & Industries supplied seven four-car trains, while the original two-car trains were converted into three-car trains in 1999. In line with the introduction of four-car trains, the station platforms were also extended. The project was completed in 2002.[14]

On April 7, 2000, a loan agreement was signed by the Philippine government and the Japan Bank for International Cooperation (JBIC).[17] JBIC extended an loan for the second phase of the capacity expansion project, which was initiated in preparation of the expected high demand by 2004 once the railway network in Metro Manila is completed with the full opening of the LRT Line 2.[18]

The implementation of the project was delayed for three years amid allegations of irregularities with the bidding conducted by the LRTA.[17] The joint venture of Sumitomo Corporation and Itochu was awarded the contract and was given the go-ahead in March 2005, paving the way for the project to move forward.[19] The second phase of the capacity expansion project was divided into two packages. Package A involves the procurement of twelve four-car trains, upgrades to the signaling and communications systems, and upgrades to the stations and depot. Package B, on the other hand, involves the procurement and installation of air conditioning units for the 1000 class trains, replacement of faulty air conditioning units of the 1100 class trains, renovation of 4sp=usNaNsp=us of railway track and railway sleepers, and procurement of equipment and spare parts used for track works. The installation of equipment for the automatic fare collection system was also included.[20] The project was completed in June 2009, five and a half years behind its initial deadline.[20]

North extension

With the completion of the first phase of the MRT Line 3 in 1999, there were plans to extend Line 3 towards (Phase 2) to create a seamless rail loop around Metro Manila.[21] However, the extension was shelved by then-President Gloria Macapagal Arroyo in favor of a 5.7sp=usNaNsp=us extension of Line 1 to a common station at North Avenue. The project involved the construction of three stations:, Roosevelt (renamed Fernando Poe Jr.), and the North Triangle Common Station. However, due to disputes in the common station's location, the station would only begin construction in 2017, with opening slated for 2025.

Construction began in June 2008.[22] The joint venture of DMCI and First Balfour built the viaduct and the two stations,[23] while the electrical and mechanical systems contracts were assigned to different contractors. Balintawak station opened on March 22, 2010,[24] with FPJ station opening exactly seven months later.[25]

In September 2008, then-mayor of Caloocan Enrico Echiverri, petitioned the government to construct Malvar station, an intemediary station between Balintawak and Monumento.[26] Two months later, two thousand residents from Barangay Bagong Barrio, where the station would be built, staged a protest along EDSA to urge the government to build the station.[27] Malvar station would eventually be approved in July 2009.[28] Though it was reported that the feasibility study for the station was completed, construction has yet to start.

Planned line merge with MRT Line 3

Cavite extension

Plans to build a new railway line to Cavite were pitched in the 1990s as the original LRT Line 6, which would have been running between Baclaran station of LRT Line 1 and Bacoor for about 12km (07miles), but the actual route is 8 kilometers (4 mi) from Baclaran to Zapote, and it would have also been using a heavy rail vehicle (HRV) consisting of six cars with a formation of 10 units (60 units) with a maximum speed of 60 km/h and a 3-minute headway, as well as the electrification would be using a 25KV AC overhead line. The project proposal was submitted by the Public Estates Authority (PEA, now the Philippine Reclamation Authority), and the Australia-based TGM completed the pre-feasibility study in 1997.[29] [30] The proposal was also identified in the Metro Manila Urban Transportation Integration Study Master Plan by the Japan International Cooperation Agency. This would have constructed a 12-to-15-kilometer (7.5 to 9.3 mi) elevated railway from Baclaran to Imus, with extensions leading to Cavite City (10 km; 6.2 mi), Dasmariñas (14.5 km; 9.0 mi), Airport, Sucat (9 km; 5.6 mi), and Alabang (12 km; 7.5 mi).[31] However, the project never materialized.

Planning and inception

The extension was first approved by the National Economic and Development Authority (NEDA) on August 25, 2000, while its implementing agreement was approved on January 22, 2002, to be undertaken by SNC-Lavalin as a public-private partnership project.[32] [33] The proposal however was subsequently terminated on May 3, 2006. In the same year, the government worked with International Finance Corporation, White & Case, Halcrow and other consultants to conduct an open-market invitation to tender for the extension and for a forty-year concession to run the extended line.[34] [35] However, the project was later shelved .[36]

Development

On March 22, 2012,[37] President Benigno Aquino III approved the ₱60-billion Cavite Extension Project.[38] Dubbed as the biggest infrastructure project under his presidency, the bidding process started on June 4.[39] Although it attracted huge interest from foreign and local firms,[40] four managed to pre-qualify.[41] However, the bidding itself failed in August 2013 due to all but one bidder withdrawing from the process due to financial risks, leaving the lone bidder—Metro Pacific Investments—submitting a conditional, non-compliant bid.[42]

The extension, at its current iteration, was approved on November 21, 2013, by the NEDA Board.[43] The project was subsequently rebidded and on September 12, 2014, the Light Rail Manila Corporation (LRMC) was awarded the 32-year concession to operate, maintain, and extend the line to Cavite.[44] The concession agreement was signed on October 2,[45] and LRMC took over the operations and maintenance of the line on September 12, 2015.[46]

LRMC contracted the operation and maintenance of the line for 20 years to RATP Dev under its subsidiary RATP Dev Transdev Asia, a joint venture between Transdev and RATP Dev on December 8, 2014.[47] [48]

Construction

On May 4, 2017, the 11.7km (07.3miles) Cavite extension broke ground.[49] [50] Another ceremony was held on May 7, 2019, to mark the start of construction,[51] although civil works began the following September 1.[52] The line would be extended from Parañaque southwards, connecting Las Piñas and Bacoor to the Mega Manila railway network. It is expected to cater more than 800,000 passengers daily once completed. When completed, it would be the third rail line extending outside the Metro Manila area (after the east extension of Line 2 and the construction of Line 7).[53]

The extension calls for the construction of eight stations and another two planned stations (and), the construction of three intermodal facilities, one satellite depot at Zapote, and mass upgrades to the existing Baclaran depot. The project has suffered cost overruns by an estimated two to three billion pesos as a result of construction delays caused by the COVID-19 pandemic and pending right-of-way issues.[54] It is divided in three phases—the 6.2km (03.9miles) Phase 1 covers five stations from Redemptorist to Dr. Santos, Phase 2 covering 3.2km (02miles) from Las Piñas to Zapote, and Phase 3 covers the remaining 2.4km (01.5miles) to Niog. The project would be implemented in a hybrid funding scheme, with from the Japanese official development assistance loan, from the LRMC, and from the Philippine government.[55]

LRMC partnered with Bouygues for civil works,[56] Alstom for the installation of the signaling and communication systems,[57] and the RATP Dev Transdev Asia for the overall engineering, procurement, consultation, construction and assistance services.[58] The extension was built using a full-span launching method, renowned as one of the fastest methods of construction for bridges and elevated viaducts, which cuts time and total land space needed for construction. As the first railway line to utilize the new construction method, a total of 203 pi-girders were used for the construction of the extension's first phase;[59] the last of which was laid on February 7, 2022.[60]

In August 2023, businessman Manny Villar bared plans to take over the extension project, noting the difficulty of LRMC extending the line to Cavite due to right-of-way issues. A portion of the extension will pass by Villar's properties in Las Piñas and, according to Villar, right-of-way acquisition "will not be a problem". He also plans to further extend the line into Cavite province should the unsolicited proposal be approved.[61]

On December 19, 2023, the first test run along the extension was successfully conducted by Alstom using an LRTA 1100 class train.[62]

, Phase 1 is 98.2% complete,[63] with operations expected by October. DOTR Executive Assistant Jonathan Gesmundo announced the construction of 8 additional stations to the current 20 LRT-1 stations, with an 11km (07miles) extension.[64] Meanwhile, Phases 2 and 3 will begin operations by 2031.[65]

Route

The line is predominantly aligned to the path of Taft Avenue (Radial Road 2) which was chosen largely due to its straight course. Later on, as Taft Avenue ends, it shifts to Rizal Avenue and Rizal Avenue Extension (Radial Road 9) then turning right on EDSA before ending at the corner of North Avenue, West Avenue, and EDSA. The south extension will span from Quirino Avenue, Harrison Avenue, and Taft Avenue Extension intersection, then would travel down from Redemptorist Road, Roxas Boulevard, and Manila–Cavite Expressway, afterwards, it will traverse through the Parañaque River and will enter Ninoy Aquino Avenue until reaching and traversing the C5 Extension Road; and will once again enter Coastal Road, crossing the Las Piñas-Bacoor Boundary Bridge along the Zapote River, and traverse through the Alabang–Zapote Road and Aguinaldo Highway intersection, until reaching Niog station located along Bacoor Boulevard in Bacoor, Cavite.

The line links the cities of Quezon City, Caloocan, Manila, and Pasay, with the upcoming stations passing through the cities of Parañaque, Las Piñas, and Bacoor in Cavite.

Stations

The line serves 20 stations along its route. A twenty-first station is yet to be constructed.[66] Eight stations which are part of the south extension are also set to be constructed south of Baclaran. station in Caloocan was previously proposed during the construction of the northern extension located between and, becoming a bargaining object during the entire extension line's construction in the jurisdiction of Caloocan. However, the planned Malvar station was completely shelved by the Aquino administration.[67]

Three stations serve as connecting stations between other lines in the metro. is indirectly connected to of the LRT Line 2 through a covered walkway; is immediately above its PNR Metro Commuter Line counterpart; and is connected to the station via a covered walkway. No stations are connected to other rapid transit lines within the paid areas, though that is set to change when the North Triangle Common Station, which has interchanges to MRT Line 3 and MRT Line 7, opens in 2025.

LRT Line 1 stations timeline! Date opened !! Project !! Stations
December 1, 1984 Partial operations
May 12, 1985 Initial completion
March 22, 2010 North Extension
October 22, 2010
2024 Cavite Extension Phase 1
2025 North Extension
2031 Cavite Extension Phases 2 and 3
Legend
Existing terminus
List of stations
NameDistance (km)ConnectionsLocation
Between
stations
Total
North TriangleQuezon City
Fernando Poe Jr.0.000
1.8701.870
2.2504.120Caloocan
1.0875.207
0.9546.161Manila
0.6606.821
0.9277.748
0.6718.419
0.6189.037
0.6489.685
0.68510.370
0.72511.095
1.21412.309
0.75413.063
0.79413.857
0.82714.684
1.06115.745Pasay
0.73016.475
1.01017.485
0.58818.073
Parañaque
Las Piñas
Bacoor, Cavite

Operation

The line operates from 4:30 a.m. PST (UTC+8) until 10:15 p.m. on weekdays, and 5:00 a.m. until 9:45 p.m on weekends and holidays.[68] It operates almost every day of the year unless otherwise announced. Special schedules are announced via the PA system in every station and also in newspapers and other mass media. During Holy Week, a public holiday in the Philippines, the rail line is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes after Easter Sunday.[69] During the Christmas season, operating hours are shortened to allow its staff to celebrate the holidays with their families.[70]

Station facilities, amenities, and services

All stations in Line 1 are elevated, with the exception of Zapote station.

Station layout and accessibility

Most stations are composed of only one level, accessible from the street below by stairway, containing the station's concourse and platform areas separated by fare gates. Some stations tend to have a concourse level below the platforms. The single-level stations of Line 1, however, was not built with accessibility in mind, due to the lack of barrier-free facilities such as escalators and elevators. Some stations, such as and, are connected at concourse level to nearby buildings, such as shopping malls, for easier accessibility. Some trains have spaces for passengers using wheelchairs.

Folding bicycles are allowed to be brought into trains provided that it does not exceed the LRTA's baggage size limitations of 2by.[71] The last car of each train are also designated as "green zones", where folding bicycle users can ride with their bikes.[72]

All stations have side platforms except for Baclaran, which has one side and one island platform. Due to the high patronage of the line, part of the platform corresponding to the front car of the train is cordoned off for the use of women, children, elderly and disabled passengers.[73]

Shops and services

Inside the concourse of some stations are stalls or shops where people can buy food or drinks. Stalls vary by station, and some have fast food stalls. The number of stalls also varies by station, and some stations tend to have a wide variety.

Stations such as Monumento and Baclaran are connected to or are near shopping malls and/or other large shopping areas, where commuters are offered more shopping varieties.

Ridership

The current designed daily ridership of the line is 560,000 passengers[74] and currently aims to increase the number of passengers being served on the line to more than 800,000 passengers, as the line's south extension is set to be fully operational by 2031.

On January 9, 2012, the line served a record 620,987 passengers during the Feast of the Black Nazarene (station is located near the Quiapo Church), and since the day falls on a working weekday.[75] In 2018, the line carried 300,000 to 500,000 passengers daily, due to the increased number of trains, from 86 vehicles to 113 vehicles available for daily trips. This gradually reduces the waiting time of passengers from 5 minutes to as much as 2 to 3.5 minutes.[76] [77] It also carried as much as 14.63 million passengers monthly in 2018. However, as of 2023, the waiting time has been officially reported at 5 to 6 minutes.[78]

Rolling stock

The line at various stages in its history has used different configurations of two-car, three-car, and four-car trainsets. The two-car trains are the original first-generation BN and ACEC trains (railway cars numbered from 1000). Most were transformed into three-car trains, although some two-car trains remain in service. The four-car trains are the more modern second-generation Hyundai Precision / Adtranz (1100), third-generation Kinki Sharyo / Nippon Sharyo (1200), and fourth-generation Construcciones y Auxiliar de Ferrocarriles (CAF) / Mitsubishi (13000).[79] [80] There are 259 railway cars grouped into 126 trains serving the line: 63 of these are first-generation, 28 second-generation, 48 third-generation, and 120 fourth-generation cars. Some of the cars, especially those from 1st generation, were decommissioned due to them being cannibalized or involved in accidents. Such as 1037, which was severely damaged in the Rizal Day bombings in 2000, it was subsequently decommissioned afterwards and eventually scrapped.[81]

The trains are permitted to run at a maximum operating speed of 60km/h.[82] [83]

Since 1999, the line's fleet has been modernized to cope with increasing numbers of passengers. In that year, seven four-car second-generation trains from Hyundai Precision were commissioned providing an increased train capacity of 1,358 passengers while the original two-car trains capable of holding 748 passengers were transformed into three-car trains with room for 1,122.[84] In 2006, twelve new trains made in Japan by Kinki Sharyo and Nippon Sharyo were commissioned, providing a capacity of 1,388 passengers.[85] [79] [86] [87] The fourth-generation trains, ordered in 2017 with Japanese funding for the south extension to replace the first-generation trains,[88] [89] [90] [91] were delivered in batches from 2021 to 2022 before entering revenue service on July 20, 2023.[92]

Prior to 1999, the first-generation trains were notorious for its lack of air conditioning, relying instead on forced-air roof ventilation for cooling.[93] This however resulted in hot and stuffy rides. Although the entry of the second-generation trains in 1999 marked the introduction of air-conditioned trains in the line, the problem was fully addressed after a preparatory rehabilitation program completed in 2001 allowed the installation of air conditioners to the older rolling stock in 2004.[94] [95] [96]

LRMC has also built an in-house laboratory for production, manufacturing, fabrication and repair of train parts that are no longer available in the market.[97]

The Passenger Assist Railway Display System, a passenger information system powered by LCD screens installed near the ceiling of the train that shows news, advertisements, current train location, arrivals and station layouts, are already installed in the third-generation trains, along with the trains of Line 2 and the first-generation trains of Line 3. By 2023, these units were discreetly removed and prior to removal, were no longer operating.

Depot

The line maintains an at-grade depot in Pasay, near Baclaran, Parañaque. It serves as the center of the operations and maintenance of the line. It is connected to the mainline through a spur line. Before its expansion, the depot had a capacity of 145 light rail vehicles and an area of .[98] It was expanded to an area of to accommodate 197 vehicles, with Shimizu Corporation and First Balfour implementing the project.[99] Expansion works were completed after the depot was inaugurated on February 23, 2022.[100]

A satellite depot is being constructed in Zapote V, Bacoor, Cavite as part of the line's south extension project. When completed, the satellite depot will handle 72 light rail vehicles.[99]

Other infrastructure

Signaling

Throughout its history, the line used different signaling systems. The line currently uses the Alstom Atlas 100 solution based on ETCS Level 1.

The original signaling system used in the LRT Line 1 was based on fixed block and relay-type trackside systems. Trains had an automatic train stop system that activates if the train passes by a red signal or over-speeding. Based on a procurement plan published by the Light Rail Transit Authority, most of the signaling equipment, including track circuits, were supplied by ACEC.

In 2007, as part of a capacity expansion project, the original system was replaced with a train control system based on automatic train protection (ATP) and automatic train supervision (ATS); the fixed-block system was provided by Siemens Transportation Systems and BBR Verkehrstechnik. The ATP system monitors the speed of the trains, while the ATS system directs train operations. Prior to the 2022 upgrade, the signalling system was designed to operate at a headway of 112 seconds.[101] [102] Aside from the ATP and ATS systems, its subsystems include train detection through axle counters, and microprocessor-based interlocking.

The signaling system was again upgraded as part of the line's south extension. Alstom was awarded a contract in February 2016 to supply its Atlas 100 ETCS Level 1 solution for the south extension and upgrade the existing system. Between November 2021 and January 2022, the new system underwent testing and commissioning. The Light Rail Manila Corporation (LRMC) announced the completion of the upgrades on February 1, 2022.[103]

Tracks

The tracks have three types: ballasted, slab tracks and concrete plinth. Ballasted sections are found in the original 15km (09miles) section from to, while slab tracks are found in the north extension, and the newer Cavite extension uses concrete plinths, like the MRT-3 and LRT-2. For the ballasted and ballastless tracks, the rails are supported by twin-block concrete railroad ties, and have a track center distance of 3.2sp=usNaNsp=us.[104]

The tracks in the original 13.95km (08.67miles) line consist of 50adj=onNaNadj=on rails designed to the EB 50T rail profile, while the tracks in the future extension line consist of 54adj=onNaNadj=on rails designed to the UIC 54 rail profile.[105]

Due to the deterioration of the rail tracks in the original line, speed restrictions were implemented in 2011, decreasing the line's operating speed limit to 40km/h, except for the north extension, in which trains continued to run at 60sp=usNaNsp=us.[106] In 2012, a contract to replace 23km (14miles) of rails was awarded to the joint venture of Oriental and Motolite Marketing Corporation, Korail, Erin-Marty Fabricators Company, Inc., and Jorgman Construction and Development Corporation.[107] However, there were delays in the project implementation until February 2014, when the then-Department of Transportation and Communications issued a notice to proceed for the joint venture.[108] The first phase of the replacement started in 2014,[109] while the rails at Monumento station were replaced in March 2015.[110] The first phase of the rail replacement was completed in December 2015.[111]

The second and final phase of replacement works commenced in August 2016 by the Light Rail Manila Corporation, which contracted Joratech[112] to replace 26,458 lineal meters (26458abbr=onNaNabbr=on) of rails and was completed in 2017.[113] This was intended to increase the operating speed from 40km/h to 60km/h and was achieved on April 5, 2021.

Incidents and accidents

Rizal Day bombings

See main article: Rizal Day bombings. On December 30, 2000, during the Rizal Day, a 1000 class LRV train (Car number 1037) was involved in the Rizal Day bombings at Blumentritt station. The attack on the line killed some 22 people and injured hundreds. Eight members of both Jemaah Islamiyah and the Moro Islamic Liberation Front (MILF), which include Hambal, Asia's most wanted man, and Fathur Rahman al-Ghozi, were charged with plotting and masterminding the attacks in 2003, some three years after the attacks. Three suspects were put on trial,[114] [115] with al-Ghozi receiving 17 years in prison due to the illegal possession of explosives. Al-Ghozi later died in a firefight after attempting to escape from prison.

Other incidents

External links

Notes and References

  1. Section VI – 3 Drawings . Part 2. Employer’s Requirements - LRT Line 1 – 4th Generation Rolling Stock . . October 16, 2015 . 3 . February 26, 2022 . December 27, 2021 . https://web.archive.org/web/20211227165109/https://dotr.gov.ph/images/Foreign_Assisted_Projects/2015/LRT1-CEP-NewRollingStockLRV4G/03-BiddingDocs_LRT1South-NewRS-LRV4G_FINAL-P3.pdf . dead .
  2. Web site: Manila . UrbanRail.Net . June 12, 2024.
  3. Web site: Marasigan. Lorenz S.. 2021-01-28. New trains for LRT-1 arrive in PHL. 2021-07-13. BusinessMirror. en-US.
  4. News: Abadilla . Emmie V. . 2023-04-12 . 10 regional airports up for sale - Bautista . Manila Bulletin . 2023-04-13.
  5. News: LRT-1 Cavite Extension more than halfway complete, Transport dep't says. Arjay L.. Balinbin. BusinessWorld. January 18, 2021. August 7, 2021.
  6. News: October 5, 1978 . Streetcars for Manila . The Straits Times . 1.
  7. Satre . Gary L. . June 1998 . The Metro Manila LRT System — A Historical Perspective . Japan Railway & Transport Review . EJRCF . 16 . June 11, 2019.
  8. Web site: LRTA History . https://web.archive.org/web/20190609183503/http://www.lrta.gov.ph/index.php/history . June 9, 2019 . April 19, 2019 . dead . Light Rail Transit Authority.
  9. News: January 20, 1983 . Light rail transit rides high; Elevated route is designed to clear snarled traffic below . 54 . . .
  10. Book: Provision of Travelway Space for Urban Public Transport in Developing Countries. 1993. UN-HABITAT. 9789211312201. June 15, 2019.
  11. Web site: July 14, 2014 . The LRT Line 1 System – The Green Line . dead . https://web.archive.org/web/20140714152448/http://www.lrta.gov.ph/line_1_system.php . July 14, 2014 . July 14, 2014 . Light Rail Transit Authority.
  12. Book: Rimmer, Peter J.. Rikisha to Rapid Transit: Urban Public Transport Systems and Policy in Southeast Asia. 2013. Elsevier. 9781483150529. 190–191.
  13. News: Abadilla . Emmie V. . 2000-08-01 . LRT operations revert to gov't, Metro contract expires . Manila Bulletin.
  14. Japan International Cooperation Agency. Metro Manila LRT Line 1 Capacity Expansion Project. December 4, 2021. Japan International Cooperation Agency. 2004.
  15. News: Marcelo . Ellen S. . P2.77-B LRT I contract awarded : Marubeni - ABB group wins . Manila Bulletin . 1996-08-29.
  16. News: Villegas . Paul N. . LRTA, Marubeni Corp. sign P1.94-B pact to expand LRT 1 . Business World . 1996-09-24.
  17. News: RP urged to speed up LRT expansion . Sandy . Araneta . The Philippine Star . April 3, 2005 . June 26, 2024.
  18. News: LRT to get facelift with new modernization program, says administrator . The Philippine Star . 2000-04-09 . 2022-04-08.
  19. News: P8.5-billion LRT-1 expansion approved . Sabdy . Araneta . The Philippine Star . March 20, 2005 . June 26, 2024.
  20. Japan International Cooperation Agency. Ex-Post Evaluation of Japanese ODA Loan Project - LRT Line 1 Capacity Expansion Project (II). 2012. December 4, 2021.
  21. News: MRTC gets support on Edsa MRT-3 phase 2 project. The Philippine Star. February 24, 2003. February 6, 2022.
  22. Web site: History of MRT3 . November 11, 2023.
  23. Web site: LRT 1 North Extension. First Balfour. November 10, 2021.
  24. Web site: LRT opens Balintawak station. ABS-CBN News. March 22, 2010. August 13, 2021. unfit. https://web.archive.org/web/20231016022050/https://news.abs-cbn.com/nation/metro-manila/03/22/10/lrt-opens-balintawak-station. October 16, 2023.
  25. News: Andreo C.. Calonzo. DOTC: LRT Line 1's Roosevelt Station now open. GMA News Online. October 22, 2010. August 13, 2021.
  26. News: Caloocan wants LRT station in Bagong Barrio. Pete. Laude. The Philippine Star. September 15, 2008 . November 11, 2023.
  27. News: Caloocan residents want additional LRT station. Pete. Laude. Jerry. Botial. The Philippine Star. November 4, 2008 . November 11, 2023.
  28. News: Lenie. Lectura. Feasibility study for P1.2-B LRT Malvar station ready. dead. https://web.archive.org/web/20120309224527/http://www.businessmirror.com.ph/home/economy/5276-feasibility-study-for-p12-b-lrt-malvar-station-ready . March 9, 2012. Business Mirror.. December 22, 2010. August 13, 2021.
  29. Web site: MMUTIS Appendices . 13 May 2024.
  30. Web site: フィリピン国マニラ首都圏鉄道標準化調査事前調査報告書 .
  31. Web site: 1999 . METRO MANILA URBAN TRANSPORTATION INTEGRATION STUDY TECHNICAL REPORT NO. 7: TRANSPORTATION PROJECT REVIEW . July 17, 2023 . Japan International Corporation Agency.
  32. News: Valencia . L. B. . $850-M LRT EXTENSION TO CAVITE STARTS IN NOVEMBER . Manila Bulletin . April 1, 2002 . February 19, 2022 . February 19, 2022 . https://web.archive.org/web/20220219073459/http://www.newsflash.org/2002/04/tl/tl001685.htm . dead .
  33. News: Valencia . L. B. . LRT1 Extension Expected to Start Construction by 2005 . Manila Bulletin . September 15, 2004 . dead . https://web.archive.org/web/20050415032610/http://www.lrta.gov.ph/news/news_item_091504_Lrt1ExtensionExpectedToStart.htm . April 15, 2005 . . February 14, 2022.
  34. Web site: Transaction Overview. MANILA LRT LINE 1 SOUTH EXTENSION PROJECT. 2006. Light Rail Transit Authority. February 14, 2022. dead. https://web.archive.org/web/20070720021852/http://www.lrta.gov.ph/L1SEP_Transaction_Overview.pdf. July 20, 2007.
  35. Web site: INVITATION TO SUBMIT EXPRESSIONS OF INTEREST AND CALL FOR REGISTRATION. 2006. MANILA LRT LINE 1 SOUTH EXTENSION PROJECT. Light Rail Transit Authority. February 14, 2022. dead. https://web.archive.org/web/20070221165051/http://www.lrta.gov.ph/L1SEP-Invitation.pdf. February 21, 2007.
  36. News: Paolo. Montecillo. Arroyo wants LRT-1 extended to Cavite. Philippine Daily Inquirer. February 25, 2010. February 14, 2022. dead. https://web.archive.org/web/20100227061604/http://newsinfo.inquirer.net/breakingnews/metro/view/20100225-255327/Arroyo-wants-LRT-1-extended-to-Cavite. February 27, 2010.
  37. News: Timeline: LRT, MRT construction . The Philippine Star . July 19, 2013 . June 26, 2024 .
  38. News: Government approves LRT Line 1 Cavite Extension Project . Dean . Ang . AutoIndustriya.com . 2012-03-23 . 2023-11-11.
  39. News: Gov’t invites investors to bid for LRT-1 extension . Rappler . June 4, 2012 . June 26, 2024 . limited . https://web.archive.org/web/20231128091327/https://www.rappler.com/business/6425-come-bidders-invite-finally-out-for-lrt-line-1-cavite-extension/ . November 28, 2023 . live.
  40. News: LRT-1 extension bidding gets huge interest . July 11, 2012 . The Manila Times . Rosalie . Periabras . June 26, 2024 . Public-Private Partnership Center.
  41. News: LRT-1 extension bidding gets huge interest . Rosalie . Periabras . The Manila Times . July 11, 2012 . June 26, 2024 . Public-Private Partnership Center.
  42. News: LRT-1 Cavite extension bidding ‘a failure’. Rappler. 29 August 2013. 13 December 2021. limited.
  43. News: Tan, Kimberly Jane. November 21, 2013. NEDA approves MRT 7, LRT-1 extension projects. GMA News and Public Affairs. June 27, 2024.
  44. News: Manila LRT1 extension contract awarded . International Railway Journal . 12 September 2014 . 27 June 2024 . Keith . Barrow.
  45. Web site: PPP contract signed for Manila LRT 1 project . live . https://web.archive.org/web/20210124095412/https://www.infrapppworld.com/news/ppp-contract-signed-for-manila-lrt-1-project . January 24, 2021 . December 4, 2021 . October 6, 2014 . InfraPPP.
  46. News: LRT1 now under Ayala, Metro Pacific management . . Cabacungan, Gil . Camus, Miguel . September 15, 2015 . June 26, 2024.
  47. Web site: Light Rail Manila Corp inks operation and maintenance contract with French firm RATP Dev for the LRT1 extension project . February 4, 2018 . France in the Philippines and in Micronesia – Embassy of France in Manila. live. https://web.archive.org/web/20180205000749/https://ph.ambafrance.org/Light-Rail-Manila-Corp-inks. February 5, 2018.
  48. Web site: Philippines: Manila LRT-1 Cavite Extension . February 4, 2018 . International Finance Corporation . dead . https://web.archive.org/web/20180204182506/https://www.ifc.org/wps/wcm/connect/3c4fdc804701783183f8ef57143498e5/PPPStories_Phillipines_ManilaLRT1.pdf?MOD=AJPERES . February 4, 2018.
  49. Barrow . Keith . May 4, 2017 . Manila breaks ground on LRT 1 Cavite extension . Simmons-Boardman Publishing . May 4, 2017 . International Railway Journal.
  50. Web site: DOTr, LRMC break ground for LRT-1 Cavite extension project . Cordero . John Ted . GMA News Online . May 4, 2017 . May 5, 2017.
  51. News: Faye. Orellana. Construction of LRT-1 Cavite extension begins. Philippine Daily Inquirer. May 7, 2019. July 20, 2021.
  52. News: Piling works for LRT-1 Cavite Extension begin . September 2, 2019 . Philippine News Agency . May 30, 2024.
  53. Web site: LRT Line 1 Cavite Extension and Operation & Maintenance. ppp.gov.ph. Public-Private Partnership Center. July 6, 2021.
  54. News: Phase1 LRT-1 Cavite Extension extension cost balloons due to delays . Emmie V. . Abadilla . Manila Bulletin . April 13, 2023 . November 11, 2023.
  55. News: Tugade says LRT1 Cavite extension to be completed in 2021 . Cordero . Ted . July 4, 2018 . GMA News Online . July 8, 2018 . en-US.
  56. Web site: LRT-1 Cavite Extension features world-class construction technology. Wheels.ph. October 1, 2020.
  57. Web site: Alstom to supply an integrated metro solution to Manila. Alstom.com. 12 February 2016.
  58. Web site: Manila. RATP Dev.
  59. News: LRT-1 Cavite Extension moves closer to completion, celebrates new milestone. NationBuilder PH. February 5, 2022. February 5, 2022. https://web.archive.org/web/20220205080158/https://nationbuilderph.com/2022/02/lrt-1-cavite-extension-moves-closer-to-completion-celebrates-new-milestone/. dead.
  60. News: LRMC, contractor complete LRT-1 Cavite Extension viaduct. Raymond Carl. Dela Cruz. February 7, 2022. Philippine News Agency. February 14, 2022.
  61. News: Villar: PAVI wants to extend LRT-1 up to Silang in Cavite . VG . Cabuag . BusinessMirror . August 17, 2023 . November 11, 2023.
  62. News: FAST FACTS: What's the LRT-1 Cavite Extension? . December 20, 2023 . Lance Spencer . Yu . Rappler . December 20, 2023 . limited.
  63. News: Cordero . Ted . LRT1 Cavite extension Phase 1 98.2% complete. June 7, 2024 . GMA Integrated News. June 7, 2024.
  64. News: DOTR: Partial operations of LRT-1 Cavite Extension expected by October 2024 . Pia . Gutierrez . ABS-CBN News . June 18, 2024 . June 18, 2024.
  65. News: LRT-1 Cavite Extension to be completed by 2031 . Anna Leah . Gonzales . June 7, 2024 . Philippine News Agency . June 8, 2024.
  66. Web site: Lines 1 and 2 Route Map . . June 10, 2014 . dead . https://web.archive.org/web/20140528161903/http://lrta.gov.ph/lrt_route_map.php . May 28, 2014.
  67. Government urged to construct LRT station in Bagong Barrio. Caloocan City Public Information Office.. November 3, 2008. https://web.archive.org/web/20100804101729/http://www.caloocancity.gov.ph/content.aspx?sectionid=455. August 4, 2010. August 13, 2021.
  68. Web site: LRT-1 Train Service Hours . Light Rail Manila Corporation . August 26, 2020 . March 28, 2022.
  69. News: LRMC releases LRT-1 train schedule for 2022 Holy Week . Manila Standard . April 6, 2022 . April 6, 2022 .
  70. News: Here are the LRT-1, LRT-2, MRT-3 schedules for Christmas 2021. Leandre. Grecia. Top Gear Philippines. 21 Dec 2021. 2022-03-28.
  71. Web site: Wala pong limit sa diameter ng wheels. Kaugnay naman po ng bagahe, hanggang 2 feet x 2 feet po ang maximum dimension na pinapayagan sa LRT-2. . 2022-05-15 . Twitter . en.
  72. Web site: Dedace . Sophia . Bikes, trains, and fewer cars with LRT's Bike O2 project . 2022-05-15 . GMA News Online . November 18, 2009 . en.
  73. #LRT1 Customer Advisory . March 9, 2022 . March 9, 2022.
  74. News: Marya . Salamat . 'Best to keep LRT1 run by public servants' — consumer groups . Bulatlat . 2014-10-14 . 2022-03-25.
  75. News: Sammy. Martin. Light rail transit sets new ridership record. The Manila Times. 11 January 2012. 9 January 2022. PressReader.
  76. News: LRT-1 posts record 14.63 million ridership in August . September 23, 2018 . Mercurio . Richmond.
  77. News: LRMC sees LRT 1 passengers increasing by 75% in 2021 . May 24, 2018 . Marsigan . Lorenz S. . BusinessMirror .
  78. 1661158740408811520. officialLRT1. Hi! The minute interval is not the train's arrival at the station but the interval of the train that departs at the end line. The train arrival will depend on your location which is every 5-6 minutes in every station. Thank you for your understanding. Ingat po sa biyahe!. Light Rail Manila Corporation. May 24, 2023. June 1, 2023.
  79. Web site: Kinki Sharyo. https://web.archive.org/web/20110717034657/http://www.kinkisharyo.co.jp/eng/e_products/sh/e_manila.htm. Light Rail Transit Authority, Manila Philippines, Light Rail Vehicle. July 17, 2011. March 8, 2010.
  80. Web site: MANILA LINE 1 LRV . 2023-12-09 . www.caf.net . en.
  81. News: How the Rizal Day bombings changed the PH's security landscape. Gerg. Cahiles. CNN Philippines. 2019-12-30. 2021-12-16.
  82. Razon, Evangeline M. . The Manila LRT System . Japan Railway and Transport Review . 16 . 38–39 . June 1998 . December 15, 2009 .
  83. Otaki, Tsutomu . The Commissioning – In Case of a Project in Manila . KS World . 14 . . 2007 . 12–13 . January 15, 2010 . dead . https://web.archive.org/web/20110928074957/http://www.kinkisharyo.co.jp/pdf/gihou/KSW14/KSW14_e_P12-13.pdf . September 28, 2011 .
  84. Web site: The Line 1 Capacity Expansion Project (Phase I). dead. https://web.archive.org/web/20060517095717/http://www.lrta.gov.ph/projects/proj_capexIph1.htm . May 17, 2006. Light Rail Transit Authority. April 7, 2006.
  85. PGMA, Japan PM inaugurate 3G trains . Light Rail Transit Authority . 7 December 2006 . April 6, 2022 . dead . https://web.archive.org/web/20080708181740/http://www.lrta.gov.ph/press_release/press_release_061207_3GTrains.htm . 2008-07-08.
  86. News: 3rd Generation LRV Mock Up on Display . . March 9, 2006 . April 7, 2006 . https://web.archive.org/web/20060424160210/http://www.lrta.gov.ph/press_release/press_release_060309_3rdGenLRV.htm . April 24, 2006 . dead .
  87. News: Olchondra. Riza T.. December 7, 2006. '3G' trains to serve LRTA riders Dec. 11: More comfortable, safer rides assured for commuter. dead. https://archive.today/20130222041909/http://services.inquirer.net/print/print.php?article_id=20061207-36856 . February 22, 2013 . Philippine Daily Inquirer. February 7, 2010.
  88. Web site: CAF and Mitsubishi win LRV contract in Manila . 2017-11-21 . Railway PRO . 2022-02-20.
  89. News: LRT-1 to get new train cars from Japan's Mitsubishi . Camus . Miguel R. . November 21, 2017 . Inquirer.net.
  90. News: CAF awarded Manila rolling stock contract . November 20, 2017 . June 7, 2020 . Metro Report International.
  91. Web site: CAF TO SUPPLY 30 LRVS TO MANILA (THE PHILIPPINES) . Construcciones y Auxiliar de Ferrocarriles . May 19, 2019.
  92. News: New, state-of-the-art train sets await LRT-1 riders starting July 20 . Aaron . Recuenco . 19 July 2023 . Manila Bulletin . 19 July 2023.
  93. News: Ronda . Rainier Allan . No more 'sweaty' LRT rides . . August 15, 2003 . November 11, 2023.
  94. Web site: The Line 1 Rehabilitation I Project Phase 3 – Rolling Stock Rehabilitation. dead. https://web.archive.org/web/20130522142703/http://www.lrta.gov.ph/projects/proj_l1rehabIph3.htm . May 22, 2013 . Light Rail Transit Authority. January 19, 2010.
  95. News: Varella, Benjie . Line 1 to have all air-conditioned trains by April . . September 26, 2003 . April 7, 2006 . dead . https://web.archive.org/web/20050415020251/http://www.lrta.gov.ph/news/news_item_092603_LrtToHaveAirconditionedTrainsByApril.htm . April 15, 2005 .
  96. Web site: LRT Line 1 Capacity Expansion Project (Phase II): Package B . . June 11, 2014 . https://web.archive.org/web/20130522132852/http://www.lrta.gov.ph/projects/proj_capexII_B.htm . May 22, 2013. dead.
  97. News: officiallrt1 . LRMC and DOST-MIRDC ink knowledge-sharing partnership on rail technology . April 23, 2021 . Light Rail Manila Corporation . April 12, 2022.
  98. News: Construction works launched for LRT-1 Cavite extension. Railway Pro. 10 May 2019. 13 December 2021. live. https://web.archive.org/web/20211213005927/https://www.railwaypro.com/wp/construction-works-launched-for-lrt-1-cavite-extension/. 13 December 2021.
  99. Web site: LRT Line 1 Expansion of Existing Depot at Baclaran. First Balfour. 3 December 2021.
  100. News: Faith . Argosino . Baclaran Depot of LRT-1 Cavite Extension project completed . Manila Bulletin . February 23, 2022 . February 23, 2022.
  101. MANILA LRT1 EXTENSION, OPERATIONS AND MAINTENANCE PROJECT . Public-Private Partnership Center . June 7, 2020 . June 4, 2012 . Department of Transportation and Communications. Department of Transportation (Philippines). Light Rail Transit Authority. Light Rail Transit Authority .
  102. Japan International Cooperation Agency . Japan International Cooperation Agency . Oriental Consultants Co., Ltd. . ALMEC Corporation . Katahira & Engineers International . Tonichi Engineering Consultants, Inc. . LRT LINE 1 CAVITE EXTENSION PROJECT . STUDY ON RAILWAY STRATEGY FOR ENHANCEMENT OF RAILWAY NETWORK SYSTEM IN METRO MANILA OF THE REPUBLIC OF THE PHILIPPINES - FINAL REPORT . July 2013 . 13 January 2022 . live . https://web.archive.org/web/20211227073918/https://openjicareport.jica.go.jp/pdf/12126629_01.pdf . 27 December 2021 . 1.
  103. Web site: LRMC completes upgrade of LRT-1 signalling system. officialLRT1. Light Rail Manila Corporation. 1 February 2022. 2 February 2022.
  104. Japan International Cooperation Agency . Japan International Cooperation Agency . Oriental Consultants Co., Ltd. . ALMEC Corporation . Katahira & Engineers International . Tonichi Engineering Consultants, Inc. . APPENDICES . STUDY ON RAILWAY STRATEGY FOR ENHANCEMENT OF RAILWAY NETWORK SYSTEM IN METRO MANILA OF THE REPUBLIC OF THE PHILIPPINES - FINAL REPORT - LRT LINE 1 CAVITE EXTENSION PROJECT . July 2013 . 13 January 2022 . 1.
  105. BIDDING DOCUMENTS - Part 2 for Procurement of New Rolling Stock LRV (4th Generation) . LRT 1-South (Cavite) Extension Project . . 2015 . 98–103, 121, 126, 148–149 . December 16, 2021 . December 16, 2021 . https://web.archive.org/web/20211216011345/https://dotr.gov.ph/images/Foreign_Assisted_Projects/2015/LRT1-CEP-NewRollingStockLRV4G/02-BiddingDocs_LRT1South-NewRS-LRV4G_FINAL-P2.pdf . dead .
  106. Web site: officiallrt1. 2021-04-04. LRMC increases LRT-1 speed to 60kph. 2021-04-25. Light Rail Manila Corporation. en-US.
  107. Web site: Amendatory and Restated Contract . Project No. 2 Systematic Replacement of Gantry Anchor Bolts of I-RT 1 Revenue Line . . April 19, 2022 . January 26, 2022 . https://web.archive.org/web/20220126151210/http://dotr.gov.ph/images/Public_Bidding/Goods/2012/RAIL/LRTASafetyReliability1_2/contract%20lrt%20proj%20%20no%202.pdf . dead .
  108. News: LRT 1 rail supplier targets to complete contract in November . Manila Bulletin . 11 February 2015 . April 8, 2022 . Yahoo News Philippines . unfit . https://web.archive.org/web/20220408085211/https://ph.news.yahoo.com/lrt-1-rail-supplier-targets-complete-contract-november-165147202--sector.html . April 8, 2022.
  109. News: Replacement of LRT 1 worn out steel rails to start next month . Manila Bulletin . 13 November 2014 . February 25, 2022 . Yahoo News Philippines . unfit . https://web.archive.org/web/20220323161400/https://ph.news.yahoo.com/replacement-lrt-1-worn-steel-rails-start-next-164742373--sector.html . March 23, 2022.
  110. News: Joel . Locsin . LOOK: LRT-1 tracks replaced at Monumento station . GMA News . March 7, 2015 . April 8, 2022.
  111. Web site: officialLRT1. LRMC commences 26-km rail replacement in LRT-1. Light Rail Manila Corporation. 31 August 2016. 10 November 2021.
  112. Web site: Systematic Rail Replacement - 26, 458 lm LRT1 Mainline Tracks . Joratech . 2022-04-24.
  113. News: LRMC to raise LRT1 train speed to 60 kph . Ted . Cordero . GMA News . February 1, 2018 . February 25, 2022.
  114. News: Tubeza . Philip . Terrorist raps filed vs Asia's most wanted man . Inquirer . Philippine Daily Inquirer . July 8, 2003 . https://web.archive.org/web/20031206145304/http://www.inq7.net/nat/2003/jul/08/nat_3-1.htm . December 6, 2003.
  115. Web site: DOJ Indicts Asia's Most Wanted Terrorist in 2000 LRT Bombing . Department of Justice (Republic of the Philippines) . https://web.archive.org/web/20080725034220/http://www.doj.gov.ph/news_07-07-03.html . July 25, 2008 . July 7, 2003 . dead.
  116. News: Baclaran fire disrupts LRT operations. GMA News and Public Affairs. 3 January 2008. 1 November 2021.
  117. News: LRT closes Baclaran station again. GMA News and Public Affairs. 4 January 2008. 1 November 2021.
  118. News: LRT Baclaran terminal resumes operation; mall fire 'under control'. GMA News and Public Affairs. 13 August 2008. 1 November 2021.
  119. News: Sophia. Dedace. LRT Line-1 trips disrupted – report. GMA News. GMA News and Public Affairs. 8 December 2008. 1 November 2021.
  120. News: Castro . Doland . February 18, 2011 . 2 LRT trains collide . unfit . ABS-CBN News . ABS-CBN News and Current Affairs . Quezon City, Metro Manila . https://web.archive.org/web/20200526074945/https://news.abs-cbn.com/video/nation/metro-manila/02/18/11/2-mrt-trains-collide . May 26, 2020 . May 26, 2021 .
  121. News: Door problem disrupts LRT operations anew. GMA News and Public Affairs. 15 April 2011. 1 November 2021.
  122. News: Lightning disrupts LRT-1 operations for 3 hours. GMA News and Public Affairs. 21 June 2011. 1 November 2021.
  123. News: Zhander. Cayabyab. Woman commits suicide inside LRT station. ABS-CBN News. 30 August 2012. 10 November 2021 . unfit . https://web.archive.org/web/20231016022055/https://news.abs-cbn.com/nation/metro-manila/08/29/12/woman-commits-suicide-inside-lrt-station . October 16, 2023.
  124. News: Glitch disrupts LRT-1 operations in Monumento. GMA News and Public Affairs. 21 December 2012. 1 November 2021.
  125. News: Glitch isolates LRT-1's Roosevelt station. GMA News and Public Affairs. 14 November 2014. 1 November 2021.
  126. News: Gonzales . Yuji Vincent . May 23, 2015 . 2 LRT trains collide due to technical glitch; at least 1 hurt . INQUIRER.net . live . South Caloocan, Metro Manila . https://web.archive.org/web/20160204182202/https://newsinfo.inquirer.net/693097/2-lrt-trains-collide-due-to-technical-glitch-at-least-1-hurt . February 4, 2016 . May 26, 2021 .
  127. News: Palma . Paola . May 23, 2015 . Minor collision disrupts LRT operation Saturday . CNN Philippines . dead . Metro Manila . https://web.archive.org/web/20160101070456/https://cnnphilippines.com/metro/2015/05/23/lrt-collision.html . January 1, 2016 . May 26, 2021 .
  128. News: LRT-1 train travels two stations with door open. CNN Philippines. March 11, 2016. October 30, 2021. dead. https://web.archive.org/web/20160318084626/http://cnnphilippines.com/metro/2016/03/11/LRT-1-open-door-video.html. March 18, 2016.
  129. News: LRT passengers trapped as LRT doors fail to open. Ramil. Bajo. Rey. Galupo. The Philippine Star. March 23, 2016. October 30, 2021.
  130. People Trapped inside LRT and One Passed Out Because the Door Won't Open!. video. https://ghostarchive.org/varchive/youtube/20211214/Ri0URxX25Jk . 2021-12-14 . live. YouTube.
  131. News: LRT-1 door slams shut on passengers; no one hurt. Jovic. Yee. Philippine Daily Inquirer. 28 September 2016. 30 October 2021.
  132. News: Anna Felicia. Bajo. Man ends up in ICU after foot got stuck in moving LRT train's door. GMA News. 7 November 2017. 30 October 2021.
  133. News: VJ. Bacungan. WATCH: LRT-1 train runs with open door. CNN Philippines. November 28, 2017. October 30, 2021. October 30, 2021. https://web.archive.org/web/20211030094345/https://cnnphilippines.com/transportation/2017/11/28/lrt-1-jason-ibe-open-door.html. dead.
  134. News: Pascual, Jekki. Aquino, Lyza. Reyes, Isay. LRT-1, MRT nagkaaberya, nagpababa ng mga pasahero. ABS-CBN News. February 20, 2018. June 1, 2021. fil. live. https://web.archive.org/web/20231016042843/https://news.abs-cbn.com/news/02/20/18/lrt-1-mrt-nagkaaberya-nagpababa-ng-mga-pasahero. October 16, 2023.
  135. News: Mga pasahero ng LRT-1 pinababa matapos magka-aberya. ABS-CBN News. fil. 21 July 2018. 1 November 2021. live. https://web.archive.org/web/20211101135443/https://news.abs-cbn.com/news/07/21/18/mga-pasahero-ng-lrt-1-pinababa-matapos-magka-aberya. November 1, 2021.
  136. News: YOU SHALL NOT PASS: Malfunctioning train door closes by itself, makes disembarking a challenge for commuters. Coconuts Manila. 28 September 2018. 30 October 2021.
  137. News: Galvez . Daphne . Glitch stalls LRT-1's Monumento – Roosevelt operations . Philippine Daily Inquirer . October 3, 2019 . May 26, 2021.
  138. News: LRT-1 train catches fire in Pasay; management limits train ops. INQUIRER.net. Consuelo. Marquez. November 6, 2020. April 25, 2021.
  139. News: LRT-1 resumes regular operations after technical woes at Gil Puyat Station. INQUIRER.net. Consuelo. Marquez. November 6, 2020. May 26, 2021.
  140. News: LRT1 ops temporarily affected by train glitch; normal ops resumed —LRMC . GMA News . April 4, 2022 . May 5, 2022.
  141. News: LRT-1 operations limited after electrical problems . Aric John Sy . Cua . February 17, 2023 . The Manila Times . February 17, 2023.
  142. 25kph speed restriction has been put in place from Baclaran to Roosevelt . Twitter . 14 April 2023 . 14 April 2023 .
  143. A stop for safety has been put in place from Baclaran to Roosevelt . Twitter . 14 April 2023 . 14 April 2023 .
  144. Limited operations of LRT-1 . Twitter . 14 April 2023 . 14 April 2023 .
  145. Resumed operations . Twitter . 14 April 2023 . 14 April 2023 .