LRTA 1100 class explained

Background:
  1. EFFFE6
LRTA 1100 class
Interiorimage:LRTA 1100 Class (1109A) - Interior (April 2024).jpg
Interiorcaption:Interior of the train captured in April 2024
Stocktype:Light rail vehicle
Service:1999 - present
Manufacturer:Hyundai Precision & Industries
Adtranz (later Bombardier Transportation, Alstom)
Assembly:Changwon, South Korea
Yearconstruction:1997 - 1998
Refurbishment:2019 - 2020
Numberbuilt:28 vehicles (7 sets)
Numberservice:16 vehicles (4 sets)
Formation:4 cars per trainset
(Mc - M - M - Mc)
Fleetnumbers:1101 - 1128
Capacity:1,358 passengers (320 seats)
Operator:LRTA (1999 - 2015)
LRMC (2015 - present)
Depots:Baclaran
Lines: Line 1
Carbody:Stainless steel
Trainlength:105.7abbr=onNaNabbr=on
Carlength:26.35abbr=onNaNabbr=on (Mc)
26.5abbr=onNaNabbr=on (M)
Width:2.59abbr=onNaNabbr=on
Height:3.95abbr=onNaNabbr=on
Floorheight:0.92abbr=onNaNabbr=on
Platformheight:0.69abbr=onNaNabbr=on
Doors:4 sets of double-leaf pocket doors per side
Art-Sections:2
Wheeldiameter: (new–worn)
Wheelbase:2.31abbr=onNaNabbr=on
Maxspeed:60km/h
Weight:37.4t (Mc)
36.5t (M)
Axleload:10.7t
Traction:Adtranz/Voith IGBT - VVVF
Traction Motors:4 × 3-phase AC induction motor
Poweroutput:As built:
Refurbished:
Deceleration: (service)
(emergency)
Aux:2 × Static inverter
Hvac:Roof-mounted duct-type air conditioning
Electricsystem: overhead catenary
Collectionmethod:Single-arm pantograph
Uicclass:Bo′+2′+Bo′
Bogies:FLEXX Metro 1000
Safety:ATP
Coupling:Semi-permanent
Notes:Sourced from unless otherwise noted.

The LRTA 1100 class is the second-generation class of high-floor light rail vehicles of the LRT Line 1. The trains were purchased in 1996 as part of a capacity expansion project funded by official development assistance (ODA) loans from Japan. Entering service in 1999,[2] many vehicles were taken out of service due to lack of spare parts. The trains subsequently underwent re-engineering and refurbishment by Voith from 2019 to 2020.

Operational history

Background and purchase

By 1990, the LRT Line 1 in Metro Manila reached its capacity, necessitating the need for capacity expansion. The project, launched in 1994 and undertaken at a cost of,[3] was one of the flagship projects of the administration of President Fidel V. Ramos. Initially, 32 cars with identical specifications to the 1000 class trains were planned to be ordered for the 32 two-car trains operating at the time so that each train would consist of three cars. However, with the increasing transport demand, four-car trains were considered instead.

In February 1996, four bidders were submitted to build the new trainsets. These are a consortium of Marubeni Corporation, Adtranz, and ABB; GEC Alsthom (now Alstom); a consortium of Mitsui and Siemens; and a consortium of Mitsubishi Corporation and Construcciones y Auxiliar de Ferrocarriles.[4] Mitsubishi and CAF would go on to build the fourth-generation train sets as part of the Cavite Extension Project. In August of that year, the Marubeni-Adtranz-ABB consortium was awarded the contract and was signed the following September.[5] [6] On October 18, Hyundai Precision signed a contract to produce 28 cars (7 sets) for the LRT Line 1. These cars were produced between 1997 and 1998 as its first manufactured light rail vehicle.

Commissioning and later decline

The handover ceremony and test-run of the 1100 series LRV was done with former President Joseph Estrada and former Vice-President Gloria Macapagal Arroyo in 1999. These trains raised the line's capacity by half from a carrying capacity of 18,000 passengers per hour per direction to 27,000 passengers per hour per direction.[7]

After 2001, many vehicles left the service owing to problems in operations and maintenance. Although spare parts had been substantially given in 2004, 14 cars remained out-of-service due to the lack thereof as of 2013, including two cars involved in a collision. Most of the spare parts for the trains, including brake parts, were only procurable from Adtranz. There were attempts to procure spare parts, but these attempts failed. This was affected by the acquisition of Adtranz by Bombardier Transportation in 2001 (later acquired by Alstom in 2021). Furthermore, parts in the 1200 class and the 1100 class only share 20% commonality.

In addition, these trainsets were, until 2020, used as "skip trains" or trains meant to target a particular station due to extremely high volume of passengers, especially during rush hours.

A 1100 class trainset was used for the first test run of the LRT Line 1 Cavite Extension Phase 1 on December 19, 2023. According to the Light Rail Manila Corporation (LRMC), the 1100 class is the widest in terms of car body, making it the most strategic option to check for initial compatibility of station platforms, walkways, cableways, and others.[8]

Refurbishment

Refurbishment of the second-generation trains was initiated by LRMC in February 2018, which aimed to restore the inactive fleet into serviceable conditions and increase the capacity of Line 1. LRMC and Voith signed an agreement to refurbish the said fleet which includes the control devices, traction systems, and automatic diagnostic displays of main circuits. The refurbishment was carried out between 2019 and 2020 and six out of seven sets returned to operation with an extended vehicle life. The remaining unrepaired set is in the Santolan Depot of LRT-2, due to the ongoing expansion of the Line 1 depot.

Design

The 1100 class are the first 6-axle (3-bogie) light rail vehicles with two articulated cars in the entire rolling stock of the LRT Line 1, as its predecessor, the 1000 class, was built to the 8-axle (4-bogie) design with three sections.

Car body

The train car body is made of stainless steel, sporting a silver body with yellow and blue cheatlines. Each LRV has four sliding pocket-type doors per side. The 1100 class trains are 90abbr=offNaNabbr=off wider than the 1000 class.

Similar to the 1000 class, the 1100 class have cheatlines of blue and yellow that run through its sides. The trains also served as a prototype for future LRVs made by Hyundai Precision, which bears resemblance to the trains used in the Adana Metro and the Hyundai Rotem LRV34 trains of the Line T4 of the Istanbul Tram.

Each light rail vehicle has two roof-mounted air-conditioning units. In total, there are eight air-conditioning units in a four-car train set.

Interior

The trains have longitudinal seating. A wheelchair provision is present near the articulated portion of the intermediate cars.

Electrical

The 1100 class trains are the first Line 1 trains to have a propulsion system controlled by variable-voltage/variable frequency drive (VVVF) inverters with insulated-gate bipolar transistors (IGBT). The two inverters drive the four 3-phase alternating current, enclosed-type induction motors. Adtranz supplied the original electrical components, while Voith installed the new components. The traction equipment in a refurbished train consists of two Voith EmCon I1000-9AU traction inverters with 350 kilovolt-amperes continuous power in each, two auxiliary static inverters, and a VPort IO control unit.

Prior to refurbishment, the trains produced a distinct high-pitched acceleration sound unique to the Adtranz VVVF controller used, a trait present in the train's derivative models. After refurbishment, the traction acceleration sound is now identical to the one used in the MRTC 3100 class trains, as its traction controller is manufactured by Voith as well.

Mechanical

Each LRV has three outside-frame bogies consisting of two motorized bogies at the ends of the LRV and one trailer bogie under the articulation. Unlike other trains, which have a bogie wheelbase of 1.9m (06.2feet), the long, 2.31m (07.58feet) wheelbases of the 1100 class trains has caused restricted access to some tracks at the Baclaran Depot. The primary suspension is a chevron rubber spring, while the secondary suspension is an air suspension, similar to the 1200 class. Semi-permanent couplers are present in the ends of each light rail vehicle except the driving cab section of the MC car.

Train formation

The configuration of a four-car trainset is Mc - M - M - Mc. Mc denotes a driving car while M denotes an intermediate car.

Car type! colspan="2"
McM
A-carB-carA-carB-car
Quantity22
Control cab
VVVF inverter
Auxiliary inverter
Pantograph
Car lengthm26.3526.5
ft in26.35m (86.45feet)26.5m (86.9feet)
CapacitySeated7882
Standing252267
Total330349

Incidents

See also

Sources

Notes and References

  1. Web site: Manila shutoken no kōkyō kōtsū seibi ni kansuru kenshū-yō sofuto seisaku jigyō riyō tebiki-sho . ja:マニラ首都圏の公共交通整備に関する研修用ソフト制作事業 利用手引書 . User guidebook for the production of training software for public transport maintenance in Metro Manila . Nippon Foundation . 2011 . May 27, 2020.
  2. Web site: Managing Safety in LRT-1 . . May 27, 2020 . December 2, 2019.
  3. News: LRT to get facelift with new modernization program, says administrator . The Philippine Star . 2000-04-09 . 2024-06-26.
  4. News: February 25, 1996 . 4 foreign firms eye P2.8-B LRT deal . Manila Standard . 13.
  5. News: Marcelo . Ellen S. . P2.77-B LRT I contract awarded : Marubeni - ABB group wins . Manila Bulletin . 1996-08-29.
  6. News: Villegas . Paul N. . LRTA, Marubeni Corp. sign P1.94-B pact to expand LRT 1 . Business World . 1996-09-24.
  7. Web site: The Line 1 Capacity Expansion Project (Phase I). dead. https://web.archive.org/web/20060517095717/http://www.lrta.gov.ph/projects/proj_capexIph1.htm . May 17, 2006. Light Rail Transit Authority. January 11, 2022.
  8. Web site: Sarao . Zacarian . 2023-12-20 . LRT-1 successfully tests Cavite extension phase 1 . 2023-12-31 . INQUIRER.net . en.
  9. News: VJ. Bacungan. WATCH: LRT-1 train runs with open door. CNN Philippines. November 28, 2017. July 11, 2021. October 30, 2021. https://web.archive.org/web/20211030094345/https://cnnphilippines.com/transportation/2017/11/28/lrt-1-jason-ibe-open-door.html. dead.
  10. News: LRT1 rides limited to Gil Puyat-Fernando Poe Jr. route from August 25 to 27 . Lance Spencer . Yu . Rappler . August 24, 2023 . June 11, 2024 . https://web.archive.org/web/20230826121522/https://www.rappler.com/business/lrt1-rides-limited-gil-puyat-fernando-poe-jr-route-august-25-27-2023/ . August 26, 2023 . limited.