LOHAS Park is a Hong Kong seaside private residential development of the MTR Corporation. Overlooking Junk Bay, it is located in Tseung Kwan O Area 86, New Territories.

Name and concept

Formerly named 'Dream City', it was renamed LOHAS Park. LOHAS is an acronym for "lifestyle of health and sustainability". The Chinese name means "sunrise health city". The CLP power substation for Phase I retains the original name 'Dream City Power Substation'.

The MTR designated LOHAS Park an 'environmental protection city' when planning began in 2002. After the SARS epidemic in early 2003, the element of 'health' was incorporated.[1] Following controversy over "wall effect" buildings in 2007, the developers promised there will be sufficient space to allow wind to circulate the estate.

The project

The 3550000square feet estate is divided into 13 phases, composing of 50 high-rise residential towers, offering 21,500 apartments to accommodate 58,000 residents in the site area, which are to be completed before 2025. These will sit above the MTR LOHAS Park station.[1] The gross floor area (GFA) for domestic purposes is up to 1.6 million square metres, and retail GFA will occupy up to 50,000 m2[2]

Apart from residential development, LOHAS Park will also include 3 shopping malls upon completion, including a 480,000-square-foot iconic MTR mall named THE LOHAS, which opened in 2020, it will contain the largest indoor ice-skating rink in Hong Kong and the largest cinema in the whole Tseung Kwan O town. There will also be green area of 1,000,000 square feet, including a 200,000-square-foot central park named The Park with pet recreation facilities, icon building, waterfalls and lawns.

Environmental features

Phases

'The Capitol' belongs to the Phase I of the development. It was jointly developed by Cheung Kong Holdings and MTR Corporation in 2008. It comprises 5 high-rise buildings up to 68 storeys, occupying 1380000square feet of floor area and offering 2,096 flats.[5] [6] [7] [8]

Phase II of the development was jointly developed by Cheung Kong Holdings and MTR Corporation and Nan Fung Development.

'Le Prestige', Phase IIA (the first of three sub-phases of Phase II of the development) comprises four high-rise buildings up to 70 storeys, offering 1,688 flats and was completed in 2009.[9]

'Le Prime', Phase IIB (the second of three sub-phases of Phase II of the development) comprises three high-rise buildings up to 76 storeys, offering 1,416 flats and was completed in 2011.[10] [11]

'La Splendeur', Phase IIC (the third of three sub-phases of Phase II of the development) comprises three high-rise buildings up to 72 storeys, offering 1,416 flats and was completed in 2013.[12] Phase II apartments facing East can enjoy the unrestricted view to the permanent recovered greenery. The planned new RTHK headquarters will lie between LOHAS Park Phase II and the greenery. The RTHK building headquarters will be only 10 storeys high compared to the 70+ storeys high of the LOHAS park Phase II towers.

Phase III was jointly developed by Cheung Kong Holdings, the MTR Corporation and Nan Fung Group. It is connected directly to LOHAS Park MTR station.

'Hemera' belongs to Phase III. It comprises 4 high-rise towers up to 66 storeys. The towers are named after various gemstones namely Diamond, Emerald, Amber and Topaz.[13]

Phase IV is being jointly developed by Sun Hung Kai Properties and the MTR Corporation.

'Wings at Sea' belongs to Phase IV. It comprises two sub-phases: Phase IVA for the construction of Towers 1 and 2 and Phase IVB (also known as 'Wings at Sea II') for the construction of Towers 3 and 5.[14]

A new covered walkway is under construction which will offer direct access to the MTR station from the Wan Po Road. Currently, access to the LOHAS Park MTR station by other housing estates residents at the Northern side of the Wan Po Road need to pass through the Phase I.

According to the LOHAS Park master plan, Phase I and Phase II of LOHAS Park are furthest from the permanent sea front, as future phases are constructed, the current seaside apartments will have progressively diminished view of the sea.

In April 2015, the tender for LOHAS Park Package 4 was awarded to a subsidiary of Sun Hung Kai Properties. In November 2015, the tender for LOHAS Park Package 5 was awarded to a subsidiary of Wheelock & Co.[15]

The LOHAS

The LOHAS
康城

A shopping mall called The LOHAS is located in LOHAS Park. It opened on 23 August 2020. The mall will also be connected to Phase VIIA: Montara. There is an Ice rink, a supermarket named Fresh and a way to go to the MTR [16]

COVID-19

Tower 9 of La Splendeur was put under lockdown on 19 March 2021.[17]

See also

Notes and References

  1. Victor Cheung, Green, green grass of home, The Standard, 8 November 2007
  2. Web site: Official Website: Planning parameters . 4 October 2009 . MTR Corporation . https://web.archive.org/web/20091010002912/http://www.lohaspark.com.hk/eng/index.html . 10 October 2009 . dead .
  3. Web site: Landfill Restoration and Afteruse - Summary Information - Environmental Protection Department. 7 June 2016.
  4. Web site: Problems & Solutions - Environmental Protection Department. 7 June 2016.
  5. Web site: 首都 The Capitol (日出康城第 1 期 / 第 1-5 座) 解碼 - 康城物業 專注經營.康城峻瀅 (Lohas Park). 7 June 2016.
  6. Web site: http://www.thestandard.com.hk/news_detail.asp?we_cat=16&art_id=56455&sid=16188755&con_type=3&d_str=20071108&fc=7. 7 June 2016. https://web.archive.org/web/20150713135948/http://www.thestandard.com.hk/news_detail.asp?we_cat=16&art_id=56455&sid=16188755&con_type=3&d_str=20071108&fc=7. 13 July 2015. dead.
  7. Web site: http://www.thestandard.com.hk/news_detail.asp?we_cat=16&art_id=62196&sid=17807105&con_type=1&d_str=20080228&fc=7. 7 June 2016. https://web.archive.org/web/20150713170916/http://www.thestandard.com.hk/news_detail.asp?we_cat=16&art_id=62196&sid=17807105&con_type=1&d_str=20080228&fc=7. 13 July 2015. dead.
  8. News: LOHAS Park to be built in Hong Kong . Veronica . Fung . The Standard . 20 December 2007 . 11 December 2009 . https://web.archive.org/web/20090221131752/http://www.thestandard.com.hk/news_detail.asp?pp_cat=48&art_id=58929&sid=16823483&con_type=1&d_str=20071220 . 21 February 2009 . dead .
  9. Web site: 領都 Le Prestige (第 2a 期 / 第 1-5 座) 解碼 - 康城物業 專注經營.康城峻瀅 (Lohas Park). 7 June 2016.
  10. Web site: 領峯 Le Prime (第 2b 期 / 第 6-8 座) 解碼 - 康城物業 專注經營.康城峻瀅 (Lohas Park). 7 June 2016.
  11. Pictures Far From Reality . Green Sense . 7 June 2009.
  12. Web site: 領凱 La Splendeur (第 2c 期 / 第 9-11 座) 解碼 - 康城物業 專注經營.康城峻瀅 (Lohas Park). 7 June 2016.
  13. Web site: 緻藍天 HEMERA – 長實、南豐及港鐵的香港將軍澳分層屋苑項目. Richitt. 2018-09-22. 覓至房. zh-HK. 2019-08-29.
  14. News: 將軍澳晉海下周開價. 頭條日報. 頭條日報 Headline Daily. 2019-08-30. zh-HK.
  15. Web site: 2014 Annual Report. MTR Corporation.
  16. Web site: 商場The LOHAS康城明年下半年開幕 - 20190511 - 報章內容 財經. 明報財經網. zh-tw. 2019-08-29.
  17. https://www.thestandard.com.hk/breaking-news/section/4/167758/HK-reports-13-Covid-cases-with-four-infections-untraceable Standard HK