Långå Wind Farm Explained

Långå wind park
Location:Långåvålen, Jämtland County
Country:Sweden
Coordinates:62.4694°N 13.2819°W
Owner:Agrivind AB
Status:planned
Ps Units Operational:5xEnercon 2 MW
Ps Electrical Capacity:10 MW

The Långå wind park is a wind farm in Långåvålen near the village of Långå in Härjedalen Municipality, Jämtland County, Sweden.[1] It was built at a cost of 125 million Swedish kronor by Agrivind AB of Västergötland.[2]

The park has five units (Långå 1 - 5), each German-manufactured Enercon turbines rated at 2000 kW.[3] The turbines have a tower height of 85m (279feet) and a total height of 125m (410feet).

See also

Notes and References

  1. http://www.landskapsskydd.nu/vind/vind093.htm Länsstyrelsen
  2. http://www.ltz.se/artikel_standard.php?id=259289&avdelning_1=101&avdelning_2=136 Länstidningen i Östersund
  3. http://www.vindstat.nu/ Driftuppföljning vindkraft