Kushabhau Thakre Marg Explained
Country: | IND |
State: | Madhya Pradesh |
Length Km: | 12 |
Direction A: | North |
Terminus A: | Luv Kush Square |
Direction B: | South |
Terminus B: | Gandhi Nagar Square |
Kushabhau Thakre Marg commonly known as Super Corridor (MR10) is a road that connects AH47 Agra - Mumbai National Highway with MP SH 27 and Indore Airport. Kushabhau Thakre Marg is one of the busiest roads of the city of Indore and has become a new hub in the city.[1] [2] [3] [4]
Connectivity
Metro
The work for the Phase-1 of the Indore Metro is currently in full swing slated to be operational by late 2023. A depot is also being developed near Gandhi Nagar Square.[5] [6] [7]
Notes and References
- http://www.hindustantimes.com/indore/super-corridor-to-be-unveiled-as-financial-tech-hub-ida/story-3qVU6XD30rnzTtQHpDQFsJ.html Super Corridor to be unveiled as financial-tech hub: IDA
- http://www.hindustantimes.com/indore/indore-super-corridor-fails-to-give-returns-but-future-is-bright/story-9IRFKhF9gl2ZUuXnUZNBNJ.html Indore Super Corridor fails to give returns, but future is bright
- http://timesofindia.indiatimes.com/city/indore/major-roads-discussed-in-the-meet/articleshow/57350753.cms Major roads discussed in the meet
- News: Indore Super Corridor fails to give returns, but future is bright . 30 December 2022 . Hindustan Times . 22 May 2016.
- News: Indore: First phase of metro rail to be operational in Sept, 2023, says Minister Bhupendra Singh . 30 December 2022 . The Free Press Journal . 7 Oct 2022.
- News: Indore: MPMRCL faces hectic work schedule ahead of PBD, GIS . 30 December 2022 . The Free Press Journal . 15 Dec 2022 . Indore, MP.
- News: Metro Rail construction: Segment work for viaduct between Super Corridor 3 and Super Corridor 2 started . 30 December 2022 . The Free Press Journal . 23 Oct 2022 . English.