Kursk Nuclear Power Plant Explained

Kursk Nuclear Power Plant
Country:Russia
Coordinates:51.6764°N 35.6064°W
Owner:Rosatom
Operator:Rosenergoatom
Construction Began:1 June 1972
Commissioned:12 October 1977
Np Reactor Type:RBMK-1000
Ps Units Operational:2 × 1,000 MW
Ps Units Decommissioned:2 × 1,000 MW
Ps Electrical Capacity:2,000
Status:O

The Kursk Nuclear Power Plant is one of the three biggest nuclear power plants (NPPs) in Russia and one of the four biggest electricity producers in the country. It is located on the bank of the Seym River about 40 kilometers west of the city of Kursk, midway between it and the town of Lgov, in western Russia. The nearby city of Kurchatov was founded when construction of the plant began. The plant feeds the grid for Kursk Oblast and 19 other regions. As of 2024, the site houses two active reactors and two decommissioned older units. It also houses the partially built Kursk 5 and Kursk 6 units which had construction halted, and two new VVER designs (Kursk II-1 and Kursk II-2) are under construction.

The International Atomic Energy Agency's Director General Rafael Grossi urged both Russia and Ukraine to exercise "maximum restraint" to avoid an accident at the plant during the August 2024 Kursk Oblast incursion following reports of "significant military activity" near the facility.[1]

Kursk I

Planning and construction

The decision to build the Kursk NPP was made in the mid-1960s by Soviet authorities. The plant was intended to supply the growing energy demands of the quickly developing industrial complex of the Kursk Magnetic Anomaly (Stary-Oskol and Mikhaylovsk ore mining and processing factories and other manufacturing companies). The general designer of Kursk I was Atomenergoproject (Moscow), the general contractor was the Research and Development Institute of Power Engineering (Moscow) and the research manager was the Kurchatov Institute. It was built by the Department for the Construction of Kursk NPP (now Kurskatomenergostroy Ltd). On-site construction began in 1971.[2]

The structure of the Kursk I plant is almost identical to Chernobyl's structure having two first-generation RBMK blocks followed by two second-generation blocks. The 1991 American television movie used the Kursk plant and the neighbouring town of Kurchatov to stand in for the Chernobyl Nuclear Power Plant and Pripyat respectively. The Kursk I plant and Kurchatov would play as the Chernobyl nuclear power plant and Pripyat once again in the 2021 Russian film .

Specifications

Kursk I is a one-circuit plant: the steam supplied to the turbines is produced inside the reactor by the boiling coolant (ordinary demineralized water circulating inside a circuit). To condense the steam the plant uses water from a 21.5 sq km cooling pond.[2] It has four RBMK-1000 reactors (1000 MW each). The first unit was launched in 1976, the second in 1979, the third in 1983 and the fourth in 1985.[2] [3] Kursk NPP is one of the three biggest NPPs in Russia and one of the four biggest electricity producers in the country (along with Balakovo and Leningrad NPPs and Sayano-Shushink WPP).[2]

Kursk NPP is an important part of the Unified Power System of Russia. Its key consumer is the ECO Center energy system covering 19 regions of the Central Federal District. Kursk NPP produces 52% of the total output of all electric power plants of Chernozemye (Black Earth Belt). It is the key energy supplier of Central Chernozemye, a region that produces 48% of iron ore, 13.5% of steel, 19% of ferrous metals, 9.6% of meat, 19.5% of sugar in Russia.[2] The development of that region is largely credited to the Kursk NPP as it provides power and a stable source of both employment and income for the communities around it. Kursk NPP feeds 90% of the industry of the Kursk region. It also supplies electricity to northern and north-eastern Ukraine.[2]

As of the beginning of 2006, the plant had generated 560 billion kWh.[2] In total Kursk's four RBMK-1000 units have generated 987 billion kWh of electricity while simultaneously providing district heating to nearby towns and process heat to industry.[4]

Shutdown

Although the Kursk I plant has been a major success for the local area, as the reactors age they begin to require much longer and more costly maintenance outages compared to modern reactor types with greater efficiency. In 2015, Rosenergoatom proposed that Unit 1 RBMK would be shut down in 2023, followed by Unit 2 in 2027. On December 19, 2021, exactly 45 years to the day since it began operation, Unit 1 RBMK shut down. Unit 2 shut down in January 2024.[5] The third and fourth units were scheduled to close in 2029 and 2031, but now they are due to close in 2033 and 2035 respectively.[3]

Kursk II VVER

Kursk II Nuclear Power Plant
Country:Russia
Coordinates:51.6883°N 35.5733°W
Owner:Rosatom
Operator:Rosenergoatom
Construction Began:29 April 2018
Commissioned:(2025)
Np Reactor Type:VVER-TOI
Ps Units Uc:2 × 1,300 MW
Ps Electrical Capacity:2,600
Status:U

Planning and Construction

With the RBMK reactors of Kursk I reaching end-of-life, and because of how heavily the surrounding area relies on this site, a replacement was necessary. The new VVER-TOI reactor was chosen, and this site would be the pioneering power station with this reactor type.

Civil construction of Kursk II began in 2017 with the excavation of an estimated 1.2 million cubic meters of soil, as part of the work for the two new units. More than 800,000m³ of sand and gravel mixture was laid at the base of the buildings and structures. The formation of the sand and gravel coating of unit one was completed in October 2017, while the first concrete layer (concrete bedding) under the foundation plate was assembled in November 2017. The first 16t reinforced concrete block was installed on the rebar of the lower foundation belt in December 2017. The foundation will comprise 105 reinforced concrete blocks with a total weight of 1,600t. More than 16,000m³ of self-compacting concrete mix was proposed to be laid in the foundation slab of the reactor building, and the works were expected to be completed by June 2018. The construction work also included the engineering networks – steam pipelines, hot water supply pipelines for the construction base, and heating networks.

Five 40t GIRAFFE TDK-40.1100 pillar cranes will be used for constructing the internal and boundary walls of the reactor unit of the first power unit. DEMAG CC 6800, a heavy-duty crane, will also be used for constructing the building structures at the reactor buildings.

The first concrete was poured in April 2018, marking the start of construction of the nuclear island building foundations. The first VVER-TOI reactors Kursk-II-1 and II-2 were to replace Kursk 1 and 2 RBMK, which were approaching end-of-life.[6] [7] With two more VVER-TOI units planned, they will eventually replace all four RBMK reactors. The first Kursk RBMK reactor shut down in December 2021, while the first Kursk II unit was expected to be commissioned by the end of 2022, and the second unit in 2023.

In January of 2023, the 235-tonne steel dome was set on the unit 1 containment building, where it will serve as a key barrier between the reactor and the environment. This lift raised the overall height of the reactor building to its final height of 64.5 meters (211 feet). The steel dome will be covered in a thick layer of reinforced concrete forming the containment building.[8]

Specifications

The two 3+ generation reactors of Kursk NPP II will be the pilot units of the VVER-TOI project and include a turbine plant featuring a low-speed turbine-generator, manufactured by Power Machines PJSC. The new design will increase the reactor capacity by an additional 25% over conventional VVER-1000 reactors. A PS330/10kV substation will provide electric energy for the construction works and for the site’s facilities. The new substation will be connected from a 330kV operating outdoor switchgear to a 330kV overhead power line.[9] [10]

Kursk Complex Reactor data

Kursk I consists of six RMBK design reactors, four of which were completed, and two of which remain in operation. A new plant is under construction, Kursk II, contains VVER design reactors.

Unit[11] Reactor typeNet
capacity
Gross
capacity
Construction
started
Electricity
grid
Commercial
operation
Shutdown
Kursk 1RBMK-1000925 MW1,000 MW1972-06-011976-12-191977-10-12Shutdown 2021-12-19
Kursk 2RBMK-1000925 MW1,000 MW1973-01-011979-01-281979-08-17Shutdown 2024-01-31
Kursk 3RBMK-1000925 MW1,000 MW1978-04-011983-10-171984-03-30(2033, planned)
Kursk 4RBMK-1000925 MW1,000 MW1981-05-011985-12-021986-02-05(2035, planned)
Kursk 5 (Incomplete)RBMK-1000925 MW1,000 MW1985-12-011992 (planned)Construction stopped 1989, cancelled 2012-08-15
Kursk 6 (Incomplete) [12] RBMK-1000925 MW1,000 MW1986-08-01Construction cancelled 1993-12-01
Kursk II-1[13] VVER-1300/5101,115 MW1,255 MW2018-04-29[14]
Kursk II-2VVER-1300/5101,115 MW1,255 MW2019-04-15

Russo-Ukrainian War

The International Atomic Energy Agency's Director General Rafael Grossi urged both Russia and Ukraine to exercise "maximum restraint" to avoid an accident at the plant during the August 2024 Kursk Oblast incursion following reports of "significant military activity" near the facility.[15] On 11 August 2024, it was reported that Russia had been constructing defensive trench lines near the power plant and up to 8 km away,[16] with additional National Guard of Russia (Rosgvardiya) forces. Fighting occurred 20 miles (35 km) from the plant.[17]

See also

External links

Notes and References

  1. News: UN urges restraint to avoid Russia nuclear plant disaster . 2024-08-09 . 2024-08-09 . RTÉ News.
  2. Web site: Kursk NPP . . 7 August 2024 . 20 July 2017 . https://web.archive.org/web/20170720142530/http://www.rosenergoatom.ru/en/npp/structure/site-kursk-npp/ . live.
  3. News: Станки становятся в строй . The machines are being put into operation . Sergey . Kalashnikov . 15 December 2022 . . 10 August 2024.
  4. Web site: Kursk 1 retires . World Nuclear News . 21 December 2021 . 10 August 2024.
  5. Web site: Kursk's second unit retires after 45 years operation . World Nuclear News . 31 January 2024 . 10 August 2024.
  6. News: Russia to start building Kursk-II in first half of 2018 . Nuclear Engineering International . 23 January 2018 . 4 February 2018 . 12 November 2020 . https://web.archive.org/web/20201112023224/https://www.neimagazine.com/news/newsrussia-to-start-building-kursk-ii-in-first-half-of-2018-6033221 . live .
  7. News: AEM Technology sees milestone with first VVER-TOI . World Nuclear News . 17 April 2018 . 18 April 2018 . 9 November 2020 . https://web.archive.org/web/20201109033548/https://www.world-nuclear-news.org/NN-AEM-Technology-sees-milestone-with-first-VVER-TOI-17041801.html . live .
  8. Web site: Outer containment dome completed at Russia's Kursk-II unit 1 . 2023-04-04 . Nuclear Engineering International . Business Trade Media International . 4 January 2023 . 27 January 2023 . https://web.archive.org/web/20230127185240/https://www.neimagazine.com/news/newsouter-containment-dome-completed-at-russias-kursk-ii-unit-1-10486519 . live .
  9. Web site: Kursk II Nuclear Power Project, Kurchatov, Kursk Oblast, Russia . 18 April 2020 . NS Energy . Business Trade Media International . 12 May 2022 . 22 May 2022 . https://web.archive.org/web/20220522134333/https://www.nsenergybusiness.com/projects/kursk-ii-nuclear-power-project/ . live .
  10. Web site: Станции и проекты . 12 May 2022 . 12 May 2022 . https://web.archive.org/web/20220512161253/https://www.rosenergoatom.ru/stations_projects/ . live .
  11. http://www.iaea.org/programmes/a2/ Power Reactor Information System
  12. Web site: Kursk-6 on the PRIS of the IAEA . 19 July 2008 . 4 June 2011 . https://web.archive.org/web/20110604103247/http://www.iaea.org/cgi-bin/db.page.pl/pris.prdeta.htm?country=RU&refno=121 . live .
  13. Web site: Kursk 2-1 on the PRIS of the IAEA . 19 July 2008 . 4 June 2011 . https://web.archive.org/web/20110604113517/http://www.iaea.org/cgi-bin/db.page.pl/pris.prdeta.htm?country=RU&refno=166 . live .
  14. Web site: На Курской АЭС-2 началось сооружение новых блоков. 2 August 2018. 11 November 2020. https://web.archive.org/web/20201111220704/http://www.atominfo.ru/newss/z0219.htm. live.
  15. News: UN urges restraint to avoid Russia nuclear plant disaster . 2024-08-09 . 2024-08-09 . RTÉ News.
  16. News: Barber . Harriet . 2024-08-11 . Ukraine-Russia war live: Russia 'digging trenches' around Kursk nuclear plant . 2024-08-12 . The Telegraph . en-GB . 0307-1235.
  17. Web site: Security . Ellie Cook . Russia builds fortifications around Kursk nuclear plant as Ukraine advances . Newsweek . en . 12 August 2024.