The is a railway line in Kumamoto Prefecture, Japan, connecting Hitoyoshi-Onsen Station in Hitoyoshi and Yunomae Station in Yunomae. It is the only railway line operated by the third sector . As the company name suggests, the line parallels the Kuma River. The company is also called . The company took over the former JR Kyushu line in 1989.
The entire line was opened by the then Japanese Government Railways in 1924.
Freight services ceased beyond Taragi in 1974, and completely in 1980.
Kumagawa Railroad, a third sector company, took over the line from JR Kyushu in 1989.[1]
On 6 July 2020, all services were suspended until further notice, due to severe damage caused by the rainfall, including the complete destruction of a large bridge over the Kuma River. In May 2021, it was officially announced that the line would be restored as a railway. Restoration work is estimated to cost around 4.6 billion yen, with the national government paying 97.5% of it, with the remaining 2.5% being paid by local governments.
Kumagawa Railway announced on 9 November 2021 the planned resumption of services starting from 28 November 2021 between Yunomae Station and Higo-Nishinomura Station. Trial runs will be conducted between 19 and 21 November, and training runs will be conducted between 22 and 27 November.[2] Services resumed between Yunomae Station and Higo-Nishinomura Station on 28 November 2021.
No. | Station | Japanese | Distance (km) | Notes | Location | |
---|---|---|---|---|---|---|
1 | Hitoyoshi-Onsen Station | 人吉温泉 | 0.0 | formerly Hitoyoshi Connection to JR Kyushu Hisatsu Line (Hitoyoshi Station) | Hitoyoshi | Kumamoto |
2 | Sagarahan-Ganjōji Station | 相良藩願成寺 | 1.5 | formerly Higashi-Hitoyoshi | ||
3 | 川村 | 4.4 | Sagara | |||
4 | 肥後西村 | 5.8 | Nishiki | |||
5 | Ichibu Station | 一武 | 9.2 | |||
6 | Kinoe Station | 木上 | 11.3 | |||
7 | Okadome-Kōfuku Station | おかどめ幸福 | 13.0 | Asagiri | ||
8 | Asagiri Station | あさぎり | 15.0 | formerly Menda | ||
9 | 東免田 | 17.4 | ||||
10 | 公立病院前 | 18.5 | Taragi | |||
11 | Taragi Station | 多良木 | 19.8 | |||
12 | 東多良木 | 21.7 | ||||
13 | Shin-Tsuruba Station | 新鶴羽 | 23.3 | |||
14 | Yunomae Station | 湯前 | 24.8 | Yunomae |
The company's railway operations have not produced an operating profit since its creation in 1989, and in fiscal 2011, it had operating profit losses of 120.76 million yen.
As of June 2012, the company operates a fleet of eight diesel cars. With the exception of two tourist trains, these were scheduled to be replaced by five new diesel cars between fiscal 2013 and 2014. The new trains were designed by industrial designer Eiji Mitooka.[3] The new trains are now in service.
All five diesel cars were inundated at Hitoyoshi Onsen Station during torrential rains on 4 July 2020.[4]