Kukullaga (Bilbao metro) explained

Kukullaga
Style:Euskotren Trena
Address:33 Bernar Etxepare St.
48450 Etxebarri
Coordinates:43.2517°N -2.8897°W
Line: Line 3
Line E1
Line E3
Line E4
Structure:At-grade
Platform:1 side platform and 1 island platform
Levels:1
Tracks:3
Parking:No
Opened:8 April 2017[1]
Accessible:yes
Owned:Euskal Trenbide Sarea

Kukullaga is the southern terminus of line 3 of the Bilbao metro. The station is also served by Euskotren Trena commuter and regional rail services. The station is located in the neighborhood of Kukullaga, in the municipality of Etxebarri, which is part of the Bilbao metropolitan area. It is one of two metro stations in Etxebarri, the other one being Etxebarri. It opened on 8 April 2017.

During the planning and construction process, the station was referred to as Etxebarri-Norte[2] and San Antonio-Etxebarri.[3]

Station layout

Kukullaga is an open-air station located at-grade in a neighbourhood with the same name, part of the municipality of Etxebarri. The station was designed by British architect Norman Foster[4] The station can be accessed from the western side, facing Ametzola Park or from the eastern side using an inclined elevator that connects the station with the neighborhood of San Antonio, which is located at a higher altitude.

The station is composed of a crystal footbridge connecting the entrances with the platforms. There has been criticism over the crystal bridge getting too hot during sunny days.[5]

Access

Services

Unlike the two other lines of the Bilbao metro system (which are operated by Metro Bilbao S.A.), line 3 is operated by Euskotren, which runs it as part of the Euskotren Trena network. Trains from the Bilbao-San Sebastián, Txorierri and Urdaibai lines of the network run through line 3.[6] [7]

After the closure of the railtrack section between Kukullaga and Bilbao-Atxuri, the corridor between the neighborhood of Atxuri and the Kukullaga station will be served by an extension of the Bilbao tram, which will include the adaptation of Bilbao-Atxuri, Bolueta and Kukullaga stations to include platforms and tracks adapted to a tramway service.[8] The tramway extension to Bolueta opened in March 2022, but the tram won't reach Kukullaga until a new depot for Euskotren's material is built, since the tracks the tram would use have been adapted as a temporary depot.[9]

Notes and References

  1. News: La Línea 3 del metro supera los seis millones de viajes en su primer aniversario . 16 November 2021 . El Correo . 6 April 2018 . es.
  2. News: Igea . O. . Las siguientes paradas . 17 June 2022 . El Correo . 28 February 2011 . es.
  3. News: Metro Bilbao cierra hoy el acceso al Casco Viejo por San Nicolás . 17 June 2022 . El Correo . EFE . 15 February 2016 . es.
  4. News: Martínez Zarracina . Pablo . 8 April 2018 . Línea nueva . El Correo . Bilbao . 29 September 2018 . es .
  5. News: Pérez . Leire . 12 July 2018 . Tres chorros de agua para reducir el calor en la estación de metro de Etxebarri . El Correo . Bilbao . 29 September 2018 . es .
  6. News: Iturralde . Mikel . Bilbao va sobre ruedas . 16 November 2021 . El Correo . 24 September 2017 . es.
  7. News: Desde hoy, los trenes de Bermeo de Euskotren llegan al centro de Bilbao . 16 November 2021 . Vía Libre . 9 September 2019 . es.
  8. News: Pérez . Leire . 21 March 2017 . El tranvía entre Atxuri y Etxebarri echa a rodar . El Correo . Bilbao . 19 September 2018 . es .
  9. News: García . Josu . El tranvía viaja ya entre Atxuri y Bolueta, su primera expansión desde hace 10 años . 25 March 2022 . El Correo . 25 March 2022 . es.