Kresna Gorge Tunnel Explained

Kresna Gorge Tunnel
Location:Kresna Gorge, Bulgaria
Coordinates:41.7686°N 23.155°W
Status:Cancelled
Start:Krupnik, Bulgaria
End:Kresna, Bulgaria
Operator:NCSIP
Character:motorway, twin-tube
Route:,
Lanes:2 x 2
Traffic:automobile
Toll:no
Length:15.385km (09.56miles) east tube, 15.41km (09.58miles) west tube

Kresna Gorge Tunnel was a planned twin-tube tunnel in Blagoevgrad Province, Bulgaria. The tunnel would be part of Struma motorway (A3), that runs between Sofia and the border crossing to Greece, at the village of Kulata.

The proposed length of the tunnel of over 15 km would place it among the longest road tunnels in the world. The main reason to build a motorway tunnel of such length was to protect the environment in the Kresna Gorge.

The design works of the tunnel began in 2013.[1] The construction was expected to begin in 2016,[2] using the New Austrian Tunnelling method due to the diverse geology in the Kresna gorge, which makes the usage of TBM inapplicable.[3] The construction costs along with the access roads were estimated at 1.1 billion levs (~560 million euro).[4] As of 2015, plans were abandoned and an alternative route east of the gorge is being considered, which will involve a series of shorter tunnels and viaducts.[5]

External links

Notes and References

  1. News: Завършен е концептуалният проект, част "Пътна", на лот 3 на "Струма". stroitelstvo.info. 2013-11-18. Bulgarian. dead. https://web.archive.org/web/20131125203754/http://stroitelstvo.info/show.php?storyid=2184583. 2013-11-25.
  2. News: Bulgaria to start 830 mln euro Kresna gorge tunnel in 2016. wire.seenews.com.
  3. News: Българските тунелни фирми дадоха заявка за строителството на лот 3 на "Струма". stroitelstvo.info. 26 May 2014. Bulgarian.
  4. Web site: ОБЯВЛЕНИЕ ЗА ПРЕДВАРИТЕЛНА ИНФОРМАЦИЯ. aop.bg. Bulgarian.
  5. News: 2015-08-05. Окончателно: Без дълъг тунел през Кресненското дефиле. mediapool.bg. Bulgarian. 2015-09-28.