Krümmel Nuclear Power Plant Explained

Krümmel Nuclear Power Plant
Coordinates:53.41°N 10.4089°W
Country:Germany
Status:Mothballed (Earmarked not to return following moratorium on nuclear power)
Construction Began:1974
Commissioned:September 28, 1983
Owner:50% PreussenElektra
50% Vattenfall
Operator:Vattenfall
Ps Units Operational:1 x 1,402
Np Reactor Type:BWR
Np Reactor Supplier:Siemens
Ps Cooling Source:Elbe River
Ps Units Manu Model:Siemens
Ps Electrical Capacity:1,402
Ps Annual Generation:10,178
Ps Electrical Cap Fac:82.9%

Krümmel Nuclear Power Plant is a German nuclear power plant in Geesthacht, Schleswig-Holstein, near Hamburg. It was taken into operation in 1983 and is owned 50% by Vattenfall via Vattenfall Europe Nuclear Energy GmbH and 50% by E.ON, and operated by the Swedish Vattenfall. Its gross power production is 1,401 MW, using a boiling water reactor.

The reactor was the world's second largest of its type in commercial operation. It is nearly identical to three other German nuclear reactors, namely Brunsbüttel Nuclear Power Plant (near Hamburg), Philippsburg Nuclear Power Plant Block 1 and Isar Nuclear Power Plant Block 1, as well as the Austrian Zwentendorf Nuclear Power Plant, that never went into service.[1]

Since July 4, 2009, after the reactor is not running, and since 2011 it is definitely shutdown due to popular demand. (Atomausstieg).

Controversies and accidents

Since 1986, a significantly higher than average number of cases of leukemia have been found in the area around the power plant.[2] [3]

On June 28, 2007, a short circuit caused a fire in the transformer of the power plant and required the plant to be shut down. Power outages were experienced in the neighboring areas. The sequence of events caused the dismissal and resignation of several Vattenfall Europe AG employees.[4]

On June 21, 2009, the Krümmel reactor was restarted for the first time since the 2007 fire, and the plant started to produce electricity again[5] but was shut down for the second time on July 4, 2009, only a few days after its two-year-long repair period.[6] The shutdown was caused by a short circuit in a transformer that was very similar to what caused the June 2007 fire. The reactor shut down normally and was not affected. The plant's general manager resigned.[7] In a press conference July 9, Ernst Michael Züfle, head of the nuclear division of Vattenfall, acknowledged that there was damage to "perhaps a few fuel elements." Even before the shutdown, foreign bodies—sharp shards of metal from earlier work that should have been flushed—were found to have ended up, potentially dangerously, in the reactor and had, to some degree, been cleaned out. On July 7, Wulf Bernotat, CEO of E.on, wrote in a sharply worded letter to Vattenfall management in Sweden that his company was "appalled" by the handling of safety procedures at the plant, according to a lengthy report in Spiegel. The report went on to discuss how the accident could impact the German national debate about nuclear power plant license extensions.[8] Before new transformers could be installed, it was decided in March 2011 to decommission the plant.

External links

Notes and References

  1. http://www.rbb-online.de/kontraste/archiv/kontraste_vom_15_07/atomkraft___laufzeitverlaengerung.html ARD-Magazin "kontraste" vom 15. Juli 2010: Atomkraft – Laufzeitverlängerung trotz Sicherheitsdefiziten
  2. Web site: Background information KiKK study. dead. https://web.archive.org/web/20090820030542/http://www.bfs.de/en/kerntechnik/kinderkrebs/kikk.html. 2009-08-20. 2009-04-20.
  3. Web site: Leukemia in the Proximity of a German Boiling-water Nuclear Reactor: Evidence of Population Exposure by Chromosome Studies and Environmental Radioactivity. dead. https://web.archive.org/web/20080924171846/http://www.ehponline.org/members/1997/Suppl-6/schmitz-feuerhake-full.html. 2008-09-24. 2009-04-20.
  4. Nuclear Engineering International. German Chain Reaction . July 24.
  5. http://www.vattenfall.com/www/vf_com/vf_com/370103press/558539press/index.jsp?pmid=103417 Krümmel nuclear power plant starts up again
  6. http://www.vattenfall.com/www/vf_com/vf_com/370103press/370165vatte/558562vatte/index.jsp?pmid=103890 Quick shutdown in nuclear power plant Krümmel
  7. http://www.thelocal.de/national/20090708-20449.html Krümmel nuclear plant won't resume until 2010
  8. http://www.spiegel.de/international/germany/0,1518,635788,00.html "ATOMIC NIGHTMARE: Krümmel Accident Puts Question Mark over Germany's Nuclear Future"