Hung Hom station explained

Style:MTR
Hung Hom
Native Name:紅磡
Native Name Lang:zh-Hant
Mlanguage:
L:Red Cliff
Showflag:jp
P:Hóngkàn
Y:Hùngham
J:Hung4ham3
Address:Cheong Wan Road, Hung Hom Bay
Borough:Yau Tsim Mong District, Kowloon
Country:Hong Kong
Coordinates:22.3029°N 114.1816°W
Owned:KCR Corporation
Operator:MTR Corporation
Train Operators:
Platform:
Tracks:11
Bus Stands:Hung Hom station bus terminus
Connections:
Structure:At-grade, fully covered (Tuen Ma line);Underground (East Rail line)
Depth:At-grade-Underground
Levels:3
Parking:Fortune Metropolis
Code:HUH
Former:Kowloon
Other Services Header:Former services
Map State:collapsed
Map Type:Hong Kong MTR#Hong Kong urban core
Map Alt:Hong Kong MTR system map

Hung Hom is a passenger[1] railway station in Hung Hom, Kowloon, Hong Kong. It is an interchange station between the and the domestic services of the MTR network, as well as the southern terminus of cross-border through-trains to mainland China which has been discontinued. This station serves the southern terminus of the East Rail Line in early morning before the first northbound train from Admiralty arrives. As the station is located next to the Cross-Harbour Tunnel's northern portal, it is also served by many cross-harbour bus routes.

Opened as the new southern terminus of the Kowloon–Canton Railway (KCR) on 30 November 1975 by Queen Elizabeth II, The station was substantially expanded in the 1990s, at which time it was given its present name. The KCR British Section was also renamed KCR East Rail in order to differentiate it from the new KCR West Rail, which opened on 20 December 2003 and was extended to Hung Hom station on 16 August 2009.

As part of the Sha Tin to Central Link project, the East Rail line was extended across Victoria Harbour to Admiralty via a new immersed tube tunnel to the south of Hung Hom. The West Rail line was also extended via eastern Kowloon to connect to the former, with the combined line being renamed "".

History

Former Hung Hom station

An older station of the same name once existed on Chatham Road South. It was situated on the former coastline of Hung Hom Bay, at the southeastern corner of the Gun Club Hill Barracks (between the current-day Chung Sze Yuen Building A of the Hong Kong Polytechnic University and the Hong Kong History Museum).

This old Hung Hom station, a temporary wooden structure, operated from 1 October 1910 (the day the Kowloon–Canton Railway began operation) until 15 September 1921[2] It was later demolished and replaced by this station on 30 November 1975.

Relocation of Kowloon station

The in Tsim Sha Tsui began operation in 28 March 1916. After decades of economic growth in Hong Kong, the station, situated at the seafront of Victoria Harbour, became too small and had no room for expansion. A new Kowloon station (the current Hung Hom station), situated to the east, was officially inaugurated by Chief Secretary Denys Roberts on 24 November 1975 as the new southern terminus of the East Rail line. However, it did not start operating until a few days later. The old terminal at Tsim Sha Tsui was closed on 29 November 1975.

The first passenger train pulled out of Hung Hom the following morning at 8:26 am. On 5 May 1975, Queen Elizabeth II unveiled a plaque commemorating the opening of the new terminal.[3] The new station cost HK$150 million and offered modern new facilities including a spacious waiting hall, a restaurant, a bar, a bookstore, a bank, escalators, and closed circuit television. It was built along with a bus terminus and a multi-storey car park.

The controversial demolition of the old station commenced on 7 June 1978;[4] a new complex of a concert hall and museums were built on Kowloon station's original site, but the clock tower was preserved as a Declared Monument.

Through trains to mainland China started running from Hung Hom station on 4 April 1979.

Renaming and expansion

The new station was renamed Hung Hom station around February or March 1996. The KCR British Section was renamed KCR East Rail in 1996, and subsequently the upon the merger of the MTR (metro services) and the Kowloon-Canton Railway (suburban train services) in December 2007. However, China Railway still referred to the station as Jiulong, which was the Mandarin pronunciation of Kowloon, until April 2019.

A HK$1.3 billion expansion of Hung Hom station began on 16 March 1995, which included a new concourse designed by Foster and Partners.[5] The expansion was completed in 1998. The passenger terminal now hosts ticket offices, waiting areas, shops and restaurants.

The construction of the East Rail extension to East Tsim Sha Tsui station began on 20 April 2001.[6] Work was undertaken at Hung Hom station to extend tracks 2 and 3 southward, and to demolish the southern concourse of the station and replace it with a new mid-level concourse. Some structural columns, supporting the Hong Kong Coliseum above, had to be demolished and underpinned to make way for the construction of the tracks. Throughout the works, at least three of the four East Rail platforms had to be kept in operation.[7] The extension was opened on 24 October 2004, turning Hung Hom into an intermediate station for the first time.

On 16 August 2009, East Tsim Sha Tsui was transferred to the West Rail line following the opening of the Kowloon Southern Link, and Hung Hom became the southbound terminus station of both the East Rail and West Rail lines. Platforms 2 and 3 were transferred to the West Rail line, and Platform 1 and 4 became the termination platform of the East Rail line.

As part of the Sha Tin to Central Link project, two new island platforms were constructed under the eastern side of the existing station podium.[8] [9] The West Rail line was relocated to its new platforms on 20 June 2021, a week ahead of the full opening of the Tuen Ma line. Temporary walkways were placed across the original West Rail line tracks, now defunct, to connect the East Rail line's platforms.[10] [11] On 27 June 2021, the West Rail line was absorbed into the Tuen Ma line.

The moved to the new underground platforms beneath the Tuen Ma line platforms on 15 May 2022, upon the opening of the line's extension to . The last train departed from the old platforms at 00:28 on 15 May 2022, and the original East Rail, West Rail line and through train platforms were permanently closed to passengers thereafter. Hung Hom is now an intermediate station on both the East Rail and Tuen Ma lines.

On 25 October 2023, it was announced that the MTR Corporation would be invited by the government of Hong Kong to conduct a preliminary study and submit proposals in 2024 for the redevelopment of an approximately 10-hectare area centred on the station.[12] [13]

In 2024, an exhibition named “Station Rail Voyage” was held at Hung Hom station as part of the celebration events for the 45th anniversary of the MTR company, with three types of retired trains displayed at the original platforms, namely the unrefurbished Metro Cammel E44 unit, an MLR train and the EMD G16 locomotive no. 56 “I. B. Trevor”. The exhibition was planned to be held from 27 April to the end of the year.[14]

Cross-border services

Platforms 5 and 6 were used by China Railway for cross-border trains to (Beijing–Kowloon line), (Shanghai–Kowloon line), and Foshan (Guangzhou–Kowloon line). It was permanently discontinued on May 2020, citing the increase of frequency of East Rail Line and the demand has moved to High Speed Rail as a result. Only West Kowloon station remains open.

Sha Tin to Central Link expansion

Background

Under the North South Corridor concept, the was extended to Hong Kong Island via a new immersed tube tunnel south of the station. At the same time, the was connected with the via East Kowloon, forming the new .

To facilitate this expansion, new platforms were built underneath the Hung Hom station Exit C concourse. The Tuen Ma line platforms sit above the East Rail line platforms.[15] New approach tracks have also been built north and south of the station.

Construction safety scandal

In 2018, a major scandal emerged regarding construction malpractice at the Hung Hom station construction site. In 2015, contractors building the concrete slab forming the Tuen Ma line platform level reportedly cut off the ends of reinforcing bars that were supposed to be screwed into couplers within the diaphragm wall forming the side of the underground station box. The contractor then poured the concrete even though the bars were not connected to the couplers. As a result, engineers have cast doubt on the long-term structural safety of the slab.[16]

The government has demanded that MTR Corporation submit a report on the safety of the station. An independent engineer, C M Wong & Associates Ltd., will conduct safety tests.[17] On 12 June 2018, Chief Executive Carrie Lam announced that she will appoint a commission on inquiry, headed by Hong Kong judge Michael Hartmann, to investigate the scandal.[18]

Station layout

5PodiumStation Carpark
U3LoftRestaurants
3/U2Intercity Through
Train Concourse/
Main Station Concourse
Exit C, a transport interchange
ticketing office, Customer Service Centre, toilets, Hong Kong Immigration Department
and Customs and Excise Department checkpoints (for intercity train passengers)
MTRShops, vending machines
ATMs, lockers
2/U1PassagewayExit A, B & D, footbridge, public transport interchange
Vending machines
Footbridgesto Cross-Harbour Tunnel, Hong Kong Polytechnic University,
Tsim Sha Tsui East, Hong Kong Museum of History,
Hong Kong Science Museum, Hung Hom
G
Platforms
siding
Island platform, not in use
East Rail line siding
East Rail line siding
Island platform, not in use
East Rail line siding
Platform 5Former intercity trains (Now a temporary exhibition)
Island platform, restricted access
Platform 6Former intercity trains (Now a temporary exhibition)
TrackDisused track
Platform 2 towards
Island platform, doors will open on the right
Platform 3← Tuen Ma line towards
L1
Platforms
Platform 1 towards or
Island platform, doors will open on the right
Platform 4← East Rail line towards

Former layout

Station layout from 16 August 2009 to 19 June 2021:

Loftstyle="border-top:solid 1px gray;border-bottom:solid 1px gray;width:100px;vertical-align:top"-Restaurants
U3Intercity Through
Train Concourse/
Exit C Concourse
Exit C, a transport interchange
ticketing office, Customer Service Centre, toilets, Hong Kong Immigration Department
and Customs and Excise Department checkpoints (for intercity train passengers)
MTRShops, vending machines
ATMs, lockers
U2Exit A & B
Concourse
Exit A, B, footbridge, public transport interchange
Customer Service
Exit D ConcourseExit D, footbridge, Customer Service
Footbridgesto Cross-Harbour Tunnel, Hong Kong Polytechnic University,
Tsim Sha Tsui East, Hong Kong Museum of History,
Hong Kong Science Museum, Hung Hom
P
Platforms
Platform 1 towards Lo Wu or Lok Ma Chau (Mong Kok East)
Island platform, doors will open on the left
Platform 2← West Rail line towards Tuen Mun (East Tsim Sha Tsui)
Platform 3← West Rail line towards Tuen Mun (East Tsim Sha Tsui)
Island platform, doors will open on the right
Platform 4 towards Lo Wu or Lok Ma Chau (Mong Kok East)
Platform 5 Intercity Through Train towards Guangzhou, Shanghai or Beijing West
Island platform, restricted access
Platform 6 Intercity Through Train towards Guangzhou, Shanghai or Beijing
TrackRunaround track for intercity locomotives

Exits

An interchange for buses (lower level) and public light buses and taxis (upper level) is located outside the station building. The lower-level bus station is situated at the Kowloon entrance of the Cross-Harbour Tunnel. Elevated walkways connect the station to the Hong Kong Coliseum; Hong Kong Polytechnic University; the residential area of Hung Hom; and tourist attractions in eastern Tsim Sha Tsui, such as the Science Museum and the Avenue of Stars along Victoria Harbour.

External links

Notes and References

  1. Cargo services ended on 16 June 2010; https://zh.wikipedia.org/zh-hk/港鐵貨場https://www.mtr.com.hk/eng/corporate/file_rep/PR-09-122-C.pdf (Chinese only)
  2. Kowloon–Canton railway 1910 Annual Report.
  3. Book: Annual Departmental Report by the General Manager, Railway and Chief Resident Engineer for the Financial Year 1975-76. 1976. Government Information Services. Hong Kong.
  4. Hong Kong Kung Sheung Daily, 8 June 1978.
  5. Book: Kowloon-Canton Railway Corporation Annual Report 1995. 1996. Kowloon-Canton Railway Corporation. Hong Kong.
  6. Web site: New extension brings KCR back to Tsim Sha Tsui . Kowloon-Canton Railway Corporation . https://web.archive.org/web/20181213153048/http://www.kcrc.com.hk/en/announcements/2001/010420.html . 13 December 2018 . 20 April 2001.
  7. Web site: Ng . Patrick . Kwan . Peter . Chu . Reuben . KCR Hung Hom Station Modifications – Planning, Design and Construction . Transactions . Hong Kong Institution of Engineers . 27 October 2023 . 1 March 2004.
  8. Web site: AECOM . Consideration of Alternatives . Environmental Impact Assessment (EIA) Study for Shatin to Central Link - Mong Kok East to Hung Hom Section . Environmental Protection Department . 28 October 2023 . 11 . 24 November 2011.
  9. Web site: AECOM . Typical Cross Section for Hung Hom Station . Environmental Impact Assessment (EIA) Study for Shatin to Central Link - Mong Kok East to Hung Hom Section . Environmental Protection Department . 28 October 2023 . 24 November 2011.
  10. Web site: Hung Hom Station to Transform into an Upgraded Interchange Hub; New Interchange Arrangements for the East Rail Line and West Rail Line . MTR Corporation . 27 October 2023 . 7 June 2021.
  11. Web site: Hung Hom Station layout . MTR Corporation . https://web.archive.org/web/20210621105747/http://www.mtr.com.hk/archive/en/services/layouts/huh.pdf . 21 June 2021.
  12. Web site: CE's speech in delivering "The Chief Executive's 2023 Policy Address" to LegCo (7) . www.info.gov.hk . Government of Hong Kong . 27 October 2023 . 25 October 2023.
  13. Web site: MTR Welcomes 2023 Policy Address In Advancing the Railway Network and City's Sustainable Development . MTR . MTR Corporation . 27 October 2023 . 25 October 2023.
  14. News: Retired train cars to be displayed in new Hung Hom station exhibition . The Standard . 18 April 2024 .
  15. Web site: Wong. Marcus. 2018-12-25. New Shatin to Central Link platforms at Hung Hom station. 2021-06-29. Checkerboard Hill. en-US.
  16. News: Cheng . Kris . Gov't highly concerned about corner-cutting scandal at Hung Hom MTR station, says Chief Exec. Carrie Lam . Hong Kong Free Press . 5 June 2018.
  17. News: Cheng . Kris . MTRC top official unsure why contractors cut corners during Hung Hom MTR station expansion . Hong Kong Free Press . 6 June 2018.
  18. News: Cheng . Kris . Retired judge to lead investigation into corner-cutting scandal at the MTRC's Hung Hom station expansion . Hong Kong Free Press . 12 June 2018.