Gren Klaipėda Combined Heat and Power Plant | |
Name Official: | Gren Klaipėda termofikacinė elektrinė |
Country: | Lithuania |
Location: | Klaipėda |
Coordinates: | 55.6839°N 21.2005°W |
Status: | O |
Construction Began: | 2011 |
Commissioned: | 2013 |
Cost: | 126 mil. EUR |
Operator: | Fortum Heat Lietuva |
Th Fuel Primary: | Biomass |
Ps Electrical Capacity: | 20 MW |
Ps Annual Generation: | 140 GWh (power) 400 GWh (heat)[1] |
Gren Klaipėda, formerly Fortum Klaipėda, is combined heat and power plant in Klaipėda, Lithuania and it uses biomass and waste to produce energy.[2] Originally built in Klaipėda Free Economic Zone by Fortum Heat Lithuania which belongs to Finnish energy company Fortum.
Lithuanian president Dalia Grybauskaitė and Finnish president Sauli Niinistö both participated in the opening ceremony of the plant in 2013.[3]