KivuWatt Power Station explained

Kivuwatt Power Station
Coordinates:-2.0542°N 29.3533°W
Country:Rwanda
Location:Kibuye
Status:O
Commissioned:17 May 2016[1]
Owner:KivuWatt Limited
Th Fuel Primary:methane
Ps Electrical Capacity:26MW

KivuWatt Power Station is a 26MW methane gas-fired thermal power plant in Rwanda.[2]

Location

The power plant is located in Kibuye, Karongi District, in the Western Province of Rwanda, approximately 130km (80miles), by road, west of Kigali, the capital and largest city in the country.[3]

Overview

KivuWatt project will extract methane from the waters of Lake Kivu and use the gas to generate electricity. The generated power will be purchased by Rwanda Energy Group (REG), the Rwandan electricity utility.

The $200 million project, owned by ContourGlobal and executed in cooperation with Wärtsilä, is expected to add 26MW of generating capacity in its first phase (ongoing now) and eventually scale up to 100MW in the coming years. In a developed country, the current 25MW would provide enough energy for 45,000 people.[4]

Phase 1 of the project, with capacity of 25MW, was expected to start commercial operation in 2012. Phase 2 of the project, with additional capacity of 75 MW, is expected to start construction six months after the commissioning of Phase 1. The project is being developed by KivuWatt Limited, a subsidiary of ContourGlobal, under a concession agreement made with the Government of Rwanda in 2009.[5] KivuWatt Limited plans to extract some of the estimated 60 billion cubic meters of methane gas trapped under Lake Kivu and convert that gas into electricity, something that has not been done on a large commercial scale before.[6] Construction concluded in November 2015 and the power station was under testing and calibration from November 2015[7] until commissioning in June 2016.

The KivuWatt power plant was inaugurated by Rwanda's president Paul Kagame on 16 May 2016.[8]

External links

Notes and References

  1. Web site: Reuters. Rwanda launches power plant that uses methane gas. 17 May 2016 . . Nairobi. 18 May 2016.
  2. Web site: Rwanda: Government Moves To Fix Power Challenges. 17 July 2015. 17 July 2015. Tumwebaze. Peterson . New Times (Rwanda) via AllAfrica.com. Kigali.
  3. Web site: Road Distance Between Kigali And Kibuye With Map. Globefeed.com . 17 July 2015. 17 July 2015.
  4. Web site: Killer lake's renewable potential. www.wartsila.com. Twentyfour7.. 2016-11-16.
  5. Web site: KivuWatt Power Plant Project: Executive Summary of the Abbreviated Resettlement Action Plan. 2012. Nagarajan S . etal . African Development Bank. 17 July 2015. PDF.
  6. Web site: 17 July 2015. 16 April 2015. Lake Kivu’s Great Gas Gamble. Rosen. Technologyreview.com. Jonathan W..
  7. Web site: 18 May 2016. New Times (Rwanda). KivuWatt energy finally connected to national grid. 17 November 2015 . Kenneth . Agutamba. Kigali.
  8. Web site: 11 February 2017. 16 May 2016. President Kagame inaugurates the KivuWatt power plant. Jean. Umuseke.rw. Nizeyimama..