Kingston station (Rhode Island) explained

Kingston, RI
Style:Amtrak
Address:1 Railroad Avenue
Borough:West Kingston, Rhode Island
Country:United States
Coordinates:41.484°N -71.5607°W
Owned:State of Rhode Island
Line:Amtrak Northeast Corridor
Platform:1 side platform
1 island platform
Tracks:3 [1]
Connections: RIPTA:
Parking:150 spaces
Bicycle:Yes
Accessible:yes
Opened:June 1875 (current station)
Rebuilt:May 31, 1998
October 30, 2017
Other Services Header:Former services
Other Services Collapsible:yes
Architectural Style:Stick/Eastlake
Mapframe:yes
Mapframe-Zoom:14
Nrhp:
Kingston Railroad Station
Embed:yes
Added:April 26, 1978
Refnum:78000018

Kingston is a historic railroad station located on the Northeast Corridor in the village of West Kingston, in the town of South Kingstown, Rhode Island. It was built at this location in 1875 by the New York, Providence and Boston Railroad, replacing earlier stations dating back to the opening of the line in 1837. Current rail services consist of Northeast Regional trains in each direction, most of which stop at the station. Historically Kingston provided commuter rail service to Providence and Boston via Amtrak's commuter rail services. The MBTA is looking at extending their commuter service on the Providence/Stoughton Line.

History

19th and 20th centuries

The New York, Providence and Boston Railroad opened in November 1837.[2] Since its tracks did not go through the village of Kingston, a new village - West Kingston - sprang up around the railroad station on Waites Corner Road.[3]

The station has remained in continuous use from the day it opened in June 1875. Historically, Kingston Station also served the Narragansett Pier Railroad. Travel time for the NaNmiles trip between Kingston and Narragansett Pier was approximately 20 minutes[4] before passenger service ended unofficially in June, 1952.[5] (In 2000 the former right-of-way was converted into the William C. O'Neill Bike Path.)

By the 1960s, service to Kingston consisted of regional service from Boston to New York City, plus a single commuter round trip from New London to Boston.[6] When Amtrak took over intercity service from Penn Central in May 1971, Penn Central was not given license to discontinue the commuter trip. When permission was given in 1972, it was replaced with a state-funded Westerly-Providence round trip also stopping at Kingston. This trip lasted until June 1977.[7] From September 1976 to October 1977 and January–April 1978 Amtrak's Clamdigger ran local service from Providence to New Haven with a stop at Kingston. The Beacon Hill replaced the Clamdigger in April 1978, running local from New Haven to Boston.[8] Faced with declining ridership and the loss of state subsidies, the Beacon Hill was discontinued effective October 24, 1981, leaving Kingston with just intercity stopping service.[9]

The station was added to the National Register of Historic Places on April 26, 1978 as Kingston Railroad Station.

An organization called "The Friends of Kingston Station" was instrumental in preserving the station and assuring its restoration after a fire there on December 12, 1988.[10]

Although most Northeast Regional trains stop at Kingston, Acela trains do not. Kingston is located on one of several sections of track where the Acela Express is permitted to run at its top speed of 150-1NaN-1. Kingston and Mansfield are the only stations where the Acela will pass through at full speed on tracks adjacent to platforms.[11] Signs and automated announcements warn passengers of the potential danger. Since it is the only station between New London and Providence that can deboard passengers from Acela trains due to its high-level platforms, they occasionally do stop at Kingston in emergencies such as downed wires or problems with the locomotives.[12] [13]

Railroad museum

For a time, half of the station was home to the Rhode Island Railroad Museum. The museum, operated by Friends of The Kingston Railroad Station, was open Sunday afternoons, and included old artifacts from railroads in Rhode Island.[14] Its highlight was an operating model railroad which depicted Kingston in 1948. The museum was closed because the second half of the building is needed due to increasing ridership at the station. The area will be renovated and used as a second waiting room with outlets and extra seating.[15]

Infrastructure expansion

In 2009, RIDOT requested American Recovery and Reinvestment Act of 2009 funds for engineering of a siding and platform that would allow local trains to stop at the station, possibly including future MBTA Commuter Rail trains on an extension of the Providence/Stoughton Line.[16] On June 29, 2015, Amtrak and local officials held a groundbreaking on the expansion of the station. This project will replace the current low-level platforms at the station with new, accessible high-level platforms and add a 1.5miles-long third track, allowing Acela Express trains to pass through the station while Northeast Regional or possible future commuter rail trains are stopped at the station. Construction work also incorporated installation of drainage, retaining walls and poles to support catenary wires for the new track as well as renovations to the interior of the station. The project was projected to cost $41 million, of which $26.5 million was provided via a High-Speed Intercity Passenger Rail Program (HSIPR) grant from the federal government and RIDOT, with Amtrak providing the remainder of the funding. Amtrak projected a completion of construction by summer 2017.[17] Renovations to Kingston station were officially completed on October 30, 2017[18] [19]

Proposed commuter service

Currently, Kingston is one of only three stations on the Northeast Corridor - along with adjacent stations Westerly and Mystic to the south - that is served exclusively by Amtrak, with no commuter rail service. In 1994, a Rhode Island Department of Transportation (RIDOT) report indicated that the Northeast Corridor was the most viable route for commuter service in Rhode Island.[20] That same year, a Federal Railroad Administration report estimated that Kingston-Providence service would begin in 1999.[21] In 2001, RIDOT released a potential operations plans for South County commuter rail service from Westerly to Providence, with a stop at Kingston plus infill stops at Wickford Junction and T.F. Green Airport. The report considered the service as an extension of Shore Line East, an extension of the MBTA's Providence/Stoughton Line, or a stand-alone service.[22] However, the 2003 Environmental Assessment and a 2009 report studying service to Woonsocket did not discuss extending service further south than Wickford Junction.[23] [24] Service to T.F. Green Airport began in December 2010, and to Wickford Junction in April 2012.

See also

References

Notes

External links

Notes and References

  1. Web site: Kingston Station Capacity Expansion . Amtrak . October 2017.
  2. Book: The Rail Lines of Southern New England . Karr, Ronald Dale . Branch Line Press . 1995 . 0942147022 . 123–127, 130–132.
  3. Web site: Kingston, RI (KIN) . Great American Stations . Amtrak . 10 August 2013.
  4. Friends of Kingston Station Newsletter. Spring 2012 . 1 . A Bit of Information About Kingston Station . It also served the Narragansett Pier Railroad, a seven-mile long railroad that ran to Narragansett Pier. The running time between Kingston and Narragansett Beach was 20 minutes (try that today on a Friday afternoon!).
  5. Web site: A Brief History of the William C. O'Neill Bike Path . Votava, Bob . 21 April 2010 . 3 May 2012 .
  6. Web site: Changes to Transit Service in the MBTA district . Belcher . Jonathan . 1 July 2013 . NETransit . 10 August 2013.
  7. Web site: https://web.archive.org/web/20120504020112/http://www.prrths.com/Hagley/PRR1977%20August%202011.pdf . 4 May 2012 . PRR CHRONOLOGY: 1977 . Pennsylvania Technical and Historical Society . August 2011 . Baer, Christopher T. . 11 October 2012.
  8. Web site: National Train Timetables . 30 April 1978 . National Railroad Passenger Corporation (Amtrak) . 11 October 2012 . 18 . The Museum of Railway Timetables.
  9. News: New Amtrak Network Keeps Most of System Intact . . August 26, 1981 . 10 August 2013 . H. Josef . Hebert.
  10. News: Historic station burns. Lowell Sun. December 13, 1988. 3. Newspaper Archive. April 18, 2018.
  11. Attleboro, T. F. Green Airport, and Wickford Junction are also located on 150-1NaN-1 sections, but these stations have platform tracks not normally used by the Acela.
  12. Friends of Kingston Station Newsletter . Winter 2008 . 1 . Acela Halted at Kingston for speeding again? . Yes, every so often the Acela actually has been witnessed at a full stop in front of the Kingston Station. On Labor Day weekend of 2007, the crowds had a real show! ... A regularly scheduled Acela to New York encountered a pantograph problem that required attention, so it was decided by the dispatchers to transfer the travelers to the following Acela set and bring it up on the station side..
  13. Although Kingston did not have full-length high platforms until 2017, the mini-high platforms were sufficient for deboarding passengers if required. Of the other stations between New London and Providence, Mystic and Westerly have only low-level platforms, while the platforms at T. F. Green Airport and Wickford Junction are located on non-electrified sidings.
  14. Web site: Museum. https://web.archive.org/web/20141124200446/http://kingstonstation.org/museum.php. dead. 24 November 2014. Friends of the Kingston Station. 27 September 2016.
  15. Web site: INTERIOR OF KINGSTON STATION. These shots were taken Sept 17. They show (more or less) what the interior of the old museum space is going to look like... . Railroad of Rhode Island. . September 17, 2017. November 3, 2017.
  16. News: Kingston MBTA stop project proposed . Chris Barrett . Providence Business News . 31 December 2009 . 10 August 2013 . dead . https://web.archive.org/web/20100110211552/http://www.pbn.com/detail/47003.html . 10 January 2010 .
  17. Web site: Ground Broken on Third Track at Kingston Station. Patch. Mark Schieldrop. June 29, 2015. February 24, 2016.
  18. Web site: Renovations complete at Kingston Station. Narragansett Times. Kendra Gravelle. November 3, 2017. November 3, 2017.
  19. Reed, Raimondo Cut Ribbon on Kingston Train Station Upgrades . Office of Jack Reed . October 30, 2017.
  20. Web site: https://web.archive.org/web/20130424230300/http://www.dot.state.ri.us/documents/intermodal/RIDOT_Rail_Feasibility_Study_1994.pdf . 24 April 2013 . Rail Corridor Feasibility Study . Rhode Island Department of Transportation . November 1994 . 14 April 2012.
  21. Web site: Northeast Corridor Transportation Plan - New York to Boston (Appendices) . Office of Railroad Development . Federal Railroad Administration . July 1994 . 11 August 2013.
  22. Web site: https://web.archive.org/web/20090416051517/http://www.dot.ri.gov/documents/intermodal/OperationsPlanMaster2.pdf . 16 April 2009 . South County Commuter Rail Service Plan . July 2001 . Rhode Island Department of Transportation . Edwards and Kelcey, Inc . 10 August 2013.
  23. Web site: South County Commuter Rail Environmental Assessment . https://web.archive.org/web/20120324095315/http://www.dot.state.ri.us/documents/intermodal/socountyrail.pdf . 24 March 2012 . February 2003 . Rhode Island Department of Transportation . 10 August 2013.
  24. Web site: https://web.archive.org/web/20130501201745/http://www.dot.ri.gov/documents/intermodal/Final_Report_Intrastate_Commuter_Rail_Report.pdf . 1 May 2013 . Rhode Island Intrastate Commuter Rail: Feasibility Study . Rhode Island Department of Transportation . Jacobs Engineering Group and Oak Square Resources . 9 June 2009 . 10 August 2009.