Keihan Main Line Explained

Keihan Main Line
Native Name:京阪本線
Native Name Lang:ja
Color:00008B
Locale:Osaka Prefecture, Kyoto Prefecture
Open:1910
Owner:Keihan Electric Railway
Depot:Neyagawa, Yodo
Linelength:49.3km (30.6miles)
Tracks:2 (Yodoyabashi - Temmabashi, Neyagawashi - Sanjo)
4 (Temmabashi - Neyagawashi)
Electrification:1,500 V DC, overhead catenary
Speed:110abbr=onNaNabbr=on
Map State:collapsed

The is a railway line in Japan operated by Keihan Electric Railway. The line runs between Sanjō Station in Kyoto and Yodoyabashi Station in Osaka. There are through services to the Keihan Ōtō Line and the Keihan Nakanoshima Line. Trains from Kyoto to Osaka are treated as "down" trains, and from Osaka to Kyoto as "up" trains.

Train services

As of March 2022, the following services are operated.[1]

(Ln)[2]
  • All cars reserved seating. Trains run "down" in the morning, and "up" in the evening. Weekdays Only.
    (RLE)
  • Premium car is reserved seating only
    (LE)
  • Premium car is reserved seating only
    (CRE) - "down" trains only, on weekday mornings
  • (RE) - premium car is reserved seating
    (ME) - "up" trains only (Discontinued in 7/2021)
  • A train departs from Yodoyabashi for Kuzuha at 0:20 a.m. and passes Moriguchishi and Hirakata-kōen.
  • (Ex)
  • (CSbE) - "down" trains only, on weekday mornings
  • Trains are operated from Demachiyanagi, Kuzuha, Hirakatashi to Yodoyabashi or Nakanoshima in the morning and pass Moriguchishi.
    (SbE)
  • (SmE)
  • Trains stop at all stations.
  • Operation in non-rush hours per hour
  • Limited express: 6 round trips between Yodoyabashi and Demachiyanagi
  • Express: 3 round trips between Yodoyabashi and Kuzuha
  • Sub. express: 3 round trips between Yodoyabashi and Demachiyanagi
  • Local: 6 round trips between Nakanoshima and Kayashima, of which 3 extend to Demachiyanagi

    Stations

    Station numberStationJapaneseSmESbECSbEExMERECRELERLELnTransfersLocation
    Through sectionfrom Temmabashi:
    L, SmE, SbE, CSbE, RE, CRE: to on the Nakanoshima Line
    KH01 (M)淀屋橋SSSSSSSS Keihan Nakanoshima Line
    Osaka Metro Midosuji Line
    Chūō-ku, OsakaOsaka Prefecture
    KH02北浜SSSSSSSS Keihan Nakanoshima Line
    Osaka Metro Sakaisuji Line
    KH03 (M)天満橋SSSSSSSSS
    KH04 (M)京橋SSSSSSSSSMiyakojima-ku, Osaka
    KH05野江||||↑||||↑|||||||rowspan="2"|Jōtō-ku, Osaka|- style="text-align: center; "| style="width:50px"|KH06| style="text-align: left; "||関目||||↑||||↑||||||style="text-align: left; "| Osaka Metro Imazatosuji Line |- style="text-align: center; "| style="width:50px"|KH07| style="text-align: left; "||森小路||||↑||||↑|||||||rowspan="2"|Asahi-ku, Osaka|- style="text-align: center; "| style="width:50px"|KH08| style="text-align: left; "||千林||||↑||||↑|||||||- style="text-align: center; "| style="width:50px"|KH09| style="text-align: left; "||滝井||||↑||||↑|||||||rowspan="3"|Moriguchi|- style="text-align: center; "| style="width:50px"|KH10| style="text-align: left; "||土居||||↑||||↑|||||||- style="text-align: center; "| style="width:50px"|KH11| style="text-align: left; "| (M)|守口市|S|S|↑|S|↓|S|↑|||||||- style="text-align: center; "| style="width:50px"|KH12| style="text-align: left; "||西三荘|S|||↑||||↑|||||||rowspan="4"|Kadoma|- style="text-align: center; "| style="width:50px"|KH13| style="text-align: left; "||門真市|S|||↑||||↑||||||style="text-align: left; "| Osaka Monorail Main Line|- style="text-align: center; "| style="width:50px"|KH14| style="text-align: left; "||古川橋|S|||↑||||↑|||||||- style="text-align: center; "| style="width:50px"|KH15| style="text-align: left; "||大和田|S||||↓|||||||||- style="text-align: center; "| style="width:50px"|KH16| style="text-align: left; "| (M)|萱島|S|S|S|||↓|||||||||rowspan="3"|Neyagawa|- style="text-align: center; "| style="width:50px"|KH17| style="text-align: left; "||寝屋川市|S|S|S|S|S|S|S||||||||- style="text-align: center; "| style="width:50px"|KH18| style="text-align: left; "| (M)|香里園|S|S|S|S|S|S|S||||||||- style="text-align: center; "| style="width:50px"|KH19| style="text-align: left; "||光善寺|S|S|S||||↑|||||||rowspan="6"|Hirakata|- style="text-align: center; "| style="width:50px"|KH20| style="text-align: left; "||枚方公園|S|S|S|S|↓|||↑|||||||- style="text-align: center; "| style="width:50px"|KH21| style="text-align: left; "| (M)|枚方市|S|S|S|S|S|S|S|S|||S|style="text-align: left; "| Keihan Katano Line|- style="text-align: center; "| style="width:50px"|KH22| style="text-align: left; "||御殿山|S|S|S||||↑|||||||- style="text-align: center; "| style="width:50px"|KH23| style="text-align: left; "||牧野|S|S|S|||↓|||||||||- style="text-align: center; "| style="width:50px"|KH24| style="text-align: left; "| (M)|樟葉|S|S|S|S|S|S|S|S|||S||- style="text-align: center; "| style="width:50px"|KH25| style="text-align: left; "||橋本|rowspan="16"||S|S||||↑|||||||rowspan="2"|Yawata|rowspan="19"|Kyoto Prefecture|- style="text-align: center; "| style="width:50px"|KH26| style="text-align: left; "| (M)|石清水八幡宮|S|S|S|||||||| style="text-align: left; " | Keihan Cable Line (Cable-hachimangu-guchi)|- style="text-align: center; "| style="width:50px"|KH27| style="text-align: left; "| (Kyoto Racecourse) (M)|淀
    (京都競馬場)|S|S|s||
    s|||||rowspan="8"|Fushimi-ku, Kyoto|- style="text-align: center; "| style="width:50px"|KH28| style="text-align: left; "| (M)|中書島|S|S|S|S|S|S|||S| style="text-align: left; " | Keihan Uji Line|- style="text-align: center; "| style="width:50px"|KH29| style="text-align: left; "||伏見桃山|S|S|||||↑|||||||- style="text-align: center; "| style="width:50px"|KH30| style="text-align: left; "| (M)|丹波橋|S|S|S|S|S|S||SKintetsu Kyoto Line
    KH31墨染SS||||↑|||||||- style="text-align: center; "| style="width:50px"|KH32| style="text-align: left; "||藤森|S|S|||||↑|||||||- style="text-align: center; "| style="width:50px"|KH33| style="text-align: left; "| (M)|龍谷大前深草|S|S||||↑|||||||- style="text-align: center; "| style="width:50px"|KH34| style="text-align: left; "||伏見稲荷|S|S|S|||↑|||||||- style="text-align: center; "| style="width:50px"|KH35| style="text-align: left; "||鳥羽街道|S|S|||||↑|||||||rowspan="6"|Higashiyama-ku, Kyoto|- style="text-align: center; "| style="width:50px"|KH36| style="text-align: left; "||東福寺|S|S|||||↑|||||| style="text-align: left; " | JR West Nara Line|- style="text-align: center; "| style="width:50px"|KH37| style="text-align: left; "||七条|S|S|S|S|S|S|S|▲||- style="text-align: center; "| style="width:50px"|KH38| style="text-align: left; "||清水五条|S|S|S||

    |}

    History

    The Temmabashi to Kiyomizu-Gojo section opened as dual track, electrified at 1,500 V DC, in 1910, and was extended to Sanjo in 1915. The Temmabashi to Yodoyabashi section opened in 1963.

    The section between Kōrien Station and Hirakata-kōen Station is set to undergo a grade separation process beginning in September 2022.[3] Preliminary works such as land acquisition had already been in progress since 2013. The project aims to eliminate 21 level crossings in the affected section, some of which are closed for up to 40 minutes per hour during the morning and afternoon rush hour. Work is expected to finish by 2027 with the transition to the elevated tracks happening by 2028.

    External links

    See also

    References

    This article incorporates material from the corresponding article in the Japanese Wikipedia.

    Notes and References

    1. http://www.keihan-holdings.co.jp/news/upload/2017-06-29%20daiya.pdf
    2. https://www.keihan.co.jp/traffic/Liner/
    3. Web site: 12 September 2022 . 京阪本線の寝屋川・枚方「高架化」鉄道工事が本格化 起工式開催、完成いつ? . Keihan Main Line Neyagawa-Hirakata "elevated" railway construction is in full swing Groundbreaking ceremony held, when will it be completed? . https://web.archive.org/web/20220912075508/https://news.railway-pressnet.com/archives/43868 . 12 September 2022 . 13 September 2022 . news.railway-pressnet.com . ja.