Kazarman hydropower cascade | |
Country: | Kyrgyzstan |
Location: | Jalal-Abad Region |
Location Map: | Kyrgyzstan |
Location Map Caption: | Approximate location in Kyrgyzstan |
Coordinates: | 41.5833°N 129°W |
Status: | P |
Plant Capacity: | 1160 MW |
The Kazarman hydropower cascade (ru|Казарманский каскад ГЭС) is a future hydropower project near Kazarman in Jalal-Abad Region, Kyrgyzstan. When completed, it will consist of 4 hydropower plants on the river Naryn: Ala-Buga, Kara-Bulung-1, Kara-Bulung-2 and Toguz-Toro, with a total installed capacity of 1160 MW.[1] [2] [3]