Kayan River Explained

Kayan River
Name Other:Sungai Kayan, Sungai Bulungan, Sungai Kajan, Sungai Ulungan, Boetoengan Rivier, Bulungan River, Boeloengan Rivier
Pushpin Map:Indonesia Kalimantan#Indonesia
Pushpin Map Size:285
Pushpin Map Caption:Location of river mouth
Subdivision Type1:Country
Discharge1 Avg:2184m3/s
Basin Size:33005km233171.8km2
Discharge1 Location:Kayan III Hydropower Station, 72 km upstream of Tanjung Selor (basin size 26260km2
Discharge2 Location:Tanjung Selor
Discharge2 Avg:2454m3/s(Period of data: 2016–2020)2261m3/s
Discharge3 Location:Kayan Delta, Sulawesi Sea
Discharge3 Avg:77.738km3/year
Mouth Coordinates:2.9115°N 117.5539°W
Qid:Q6380446
River System:Kayan basin (DAS320024)[1]

The Kayan River is a river of Borneo island, flowing in the North Kalimantan province of Indonesia, about 1,600 km northeast of the capital Jakarta.[2] [3] Tributaries include the Bahau River.

Hydrology

The Kayan River rises on Mount Ukeng, passing Tanjung Selor city, and discharges into the Sulawesi Sea, with a total length of about 576km (358miles) and a basin size of 33005km2, forming a wide area at the upstream and narrower in the center until downstream.

Uses

Transportation

For ages, the Kayan River served as the main transportation route for the inhabitants of Malinau and Bulungan Regency to reach the inland region of Malinau Regency using traditional boats or out of the Bulungan Regency using speed boats, while downstream there are some river ports for passengers and goods, such as Port of Kayan and Port of Pesawan.[4]

Fishery and agriculture

The people along the Kayan River utilize the water for agriculture and fishery, either by traditional fishing or netting, especially in the upstream area, whereas about 30,000 hectares of land of the Delta Kayan is used as a Food Estate area, for fish ponds and farmlands.[5]

Hydroelectricity

The Kayan River is used to produce hydroelectricity using some power plants, such as the Diesel-powered one in the village of Long Nawang, Kayan Hulu subdistrict.[6] The river can produce around 900 megawatts (MW).[7] There is also a dam for the hydroelectric power plant in the village of Desa Long Peso, Peso sub-district, Bulungan Regency.[8]

Villages along the Kayan River

Antutan

Antutan village (Bahasa Indonesia – Desa Antutan) is one of the many villages situated along the Kayan River. The population of the village consists of Dayak sub-tribes: the Kenyah and the Kayan as well as the Tidung and the Bulungan. There are several main sources of income in this village, such as paddy plantation, farming, fishing, and crafts selling. The majority of the villagers heavily depended on the paddy rice plantation to make a living. However, some are also public servants, for example, teachers, nurses, soldiers, and police personnel.

See also

References

2.9115°N 117.5539°W

Notes and References

  1. Web site: Hukum Online. Keputusan Menteri Kehutanan No. SK.511/MENHUT-V/2011. id.
  2. Book: McNally, Rand . The New International Atlas . 1993.
  3. Web site: Sungai Bulungan . 29 June 2022 . GeoNames.
  4. News: 26 January 2017 . Pelabuhan Pesawan Siap Ramaikan Jalur Perdagangan di Indonesia Timur . id . TribunNews.com . Dewi Agustina . live . 25 January 2019 . https://web.archive.org/web/20190126113741/http://www.tribunnews.com/regional/2017/01/26/pelabuhan-pesawan-kalimantan-utara-siap-ramaikan-jalur-perdagangan-di-indonesia-timur?page=2 . 26 January 2019.
  5. News: 6 May 2012 . Kemenakertrans Buka Lahan 30.000 Hektar di Kaltim . id . Berita Satu . live . 29 June 2022 . https://web.archive.org/web/20220629181942/https://www.beritasatu.com/ekonomi/46441/kemenakertrans-buka-lahan-30000-hektar-di-kaltim . 29 June 2022.
  6. News: 3 February 2018 . PLTD Long Nawang di Malinau Dibantu Mesin Pembangkit Listrik Milik Desa . id . TribunKaltim.co . Mathias Masan Ola . live . 25 January 2019 . https://web.archive.org/web/20180705004400/http://kaltim.tribunnews.com/2018/02/03/pltd-long-nawang-di-malinau-dibantu-mesin-pembangkit-listrik-milik-desa . 5 July 2018.
  7. News: 29 January 2018 . Firsta Susan Ferdiany . Kaltara Fokus Realisasi Bendungan PLTA Kayan 900 MW . live . https://web.archive.org/web/20190126164237/https://kaltara.antaranews.com/berita/449864/kaltara-fokus-realisasi-bendungan-plta-kayan-900-mw . 26 January 2019 . 29 June 2022 . Antara Kaltara . id.
  8. Web site: Mediatama . Grahanusa . 16 June 2016 . Pemerintah bangun PLTA Kayan di Kaltara . live . https://web.archive.org/web/20220629181946/https://industri.kontan.co.id/news/pemerintah-bangun-plta-kayan-di-kaltara . 29 June 2022 . 29 June 2022 . Kontan.co.id . id.