Kasturinagara metro station explained

Kasturi Nagar
Other Name:Kasturinagara
Style:Namma Metro
Address:NH 44, Jyothi Puram, Kasturinagara, Bengaluru, Karnataka 560043
Coordinates:13.0049°N 77.6632°W
Owned:Bangalore Metro Rail Corporation Ltd (BMRCL)
Operator:Namma Metro
Platform:Side platform (TBC)
Platform-1 → /
Platform-2 →
Platform Numbers (TBC)
Tracks:2 (TBC)
Connections: Channasandra railway station
Kasthuri Nagar Bus Stop leading towards Tin Factory or Horamavu
Structure:Elevated, Double track
Levels:2 (TBC)
Parking:(TBC)
Accessible:(TBC)
Status:Under Construction
Code:(TBC)
Opening: (TBC)
Electrified:(TBC)
Mapframe:yes
Mapframe-Marker:rail
Mapframe-Zoom:14
Map State:collapsed

Kasturi Nagar is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. It is located in the main Kasturinagar area consisting of residential buildings, followed by the main Channasandra railway station, RTO Office (Kasturinagar), Steel Authority of India (SAIL) (Kasturinagar) and Banasawadi Police Station. This metro station is slated to become operational around June 2026.[2] [3] [4] [5]

Station layout

Station Layout - To Be Confirmed

GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2Side platform | Doors will open on the left |-| style="border-bottom:solid 1px gray;" width="85" |Platform #
Southbound
| style="border-bottom:solid 1px gray;" width="500" |Towards → /
Next Station: Krishnarajapura Change at the next station for |-|Platform #
Northbound
|Towards ←
Next Station: Horamavu|-| colspan="2" style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" align="center" |Side platform | Doors will open on the left |-| rowspan="2" style="border-bottom:solid 1px gray;" width="30" valign="top" |L2| style="border-bottom:solid 1px gray;" width="85" || style="border-bottom:solid 1px gray;" width="500" ||-|}

Connections

This metro station will be connected with Channasandra of Indian Railways network and also will be connected with the Kasthuri Nagar bus stop leading towards Tin Factory or towards Horamavu.

See also

External links

  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.

]

Notes and References

  1. Web site: Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty . 2023-12-14 . timesproperty.com.
  2. Web site: L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B Metro Rail Today . 2023-12-14 . Metro Rail Today: Gateway to Rail & Metro Industry.
  3. Web site: 2023-06-06 . Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar . 2023-12-14 . The Indian Express . en.
  4. Web site: 2023-06-07 . Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026 . 2023-12-14 . TimesNow . en.
  5. Web site: Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL . 2023-12-14 . The New Indian Express.