Karusa Wind Power Station Explained

Karusa Wind Power Station
Country:South Africa
Coordinates:-32.8858°N 20.6564°W
Location:Laingsburg, Laingsburg Municipality, Central Karoo District, Western Cape
Status:O
Construction Began:January 2019
Commissioned:June 2022
Cost:€200 million
Owner:Enel Green Power
Operator:Karusa Wind Energy
Wind Farm Type:Onshore
Ps Units Manu Model:4.2 MW
Ps Electrical Capacity:147 MW
Ps Units Operational:35
Ps Annual Generation:~500 GWh

The Karusa Wind Power Station, is a 147 MW wind-power plant in South Africa. The wind farm which achieved commercial commissioning in June 2022 was developed by Enel Green Power, a subsidiary of Enel, the Italian energy conglomerate. Under a 20-year power purchase agreement, the power station sells the energy generated here to Eskom Holdings, the national electricity utility parastatal company.[1] [2]

Location

The wind farm is located approximately 62.5km (38.8miles), north west of the town of Laingsburg, in the Western Cape Province of South Africa. This is approximately 282km (175miles) northeast of Cape Town, the nearest large city.[3]

Overview

The power station comprises 35 turbines manufactured by Vestas, based in Denmark, each rated at 4.2 MW, capable of generating 147 MW at peak production. Enel Green Power won the concession to build this power station in 2016 as part of the 4th window of the Renewable Energy Independent Power Producer Procurement Programme (REIPPP), of the South African government.[1] [2]

Ownership

In 2021, Qatar Investment Authority, the sovereign wealth fund of Qatar, signed a joint venture agreement with Enel Green Power, thereby becoming a co-owner in this power station. The table below illustrates the ownership of Karusa Wind Power Station.[1] [4]

Domicile Notes
1
2

Construction

The engineering, procurement and construction contract was awarded to Vestas Wind Systems, based in Denmark. Construction began in 2019 and commercial commissioning occurred in June 2022.[1] [2] [4]

Cost and funding

The cost of construction is reported as €200 million. This project received loan support from Absa Group Limited and Nedbank Group, both large South African financial houses.[1] [4]

Other considerations

Karusa Wind Power Station is one of five wind park concessions awarded to Enel Green Power, under the South African government's Renewable Energy Supply Programme (REIPPP). The other four wind farms are Oyster Bay Wind Power Station, Garob Wind Power Station, Nxuba Wind Power Station and Soetwater Wind Power Station. As of July 2022, Enel Green Power had a generation portfolio of 1,257 MW in South Africa, which included wind and solar power stations.[1] [2] [4]

See also

External links

Notes and References

  1. Web site: South Arica: Karusa wind farm (147 MW) finally goes into commercial operation . Afrik21.africa . 4 July 2022 . Jean Marie Takouleu . 5 July 2022 . Paris, France.
  2. Web site: EngineeringNews.co.za . 147 MW Karusa Wind Farm enters commercial operation . 29 June 2022 . Engineering News South Africa . 5 July 2022 . South Africa.
  3. Web site: Travel Distance Between Cape Town, South Africa And Karusa Wind Farm, South Africa . 5 July 2022.
  4. Web site: South Africa: Karusa wind farm (147 MW) finally goes into commercial operation . 4 July 2022 . Africa Energy Portal . Africa Energy Portal . 5 July 2022 . Abidjan, Ivory Coast.