Kanungu Hydroelectric Power Station Explained

Kanungu Hydroelectric Power Station
Location Map:Uganda#Africa#World
Location Map Caption:Map of Uganda showing the location of Kanungu.
Location:Kanungu, Kanungu District
Coordinates:-0.8814°N 29.6706°W
Country:Uganda
Purpose:P
Status:O
Opening:18 March 2011
Owner:Eco Power Private Limited
Operator:Eco Power Private Limited
Dam Crosses:Ishasha River
Plant Commission:18 March 2011

Kanungu Power Station is a run-of-the-river hydroelectric power station on the Ishasha River in Uganda. The station is sometimes referred to as the Ishasha Power Station.[1] [2]

Location

The power station is in the Kanyantorogo sub-county of Kanungu District in southwestern Uganda, about by road from the district headquarters in the town of Kanungu, although the straight air distance is only about 12km (07miles).[3] The geographical coordinates of the power station are: 0°52'53.0"S, 29°40'14.0"E (Latitude:-0.881389; Longitude:29.670556).

The dam and weir on the Ishasha River are downstream from the boundary of the Bwindi Impenetrable National Park. A penstock takes water downstream to the twin-Francis turbine power station, for a rated head of . A tailrace then takes water from the power station and returns it to the Ishasha River. Provision has been made for an open-pipe flow of 250 liters per second into the section of the river between the dam and the tailrace to ensure that local fish species are not adversely affected.[4] A, 33 kiloVolt transmission line connects the power station to the national grid.[4]

History

The power station was constructed by Eco Power Uganda Limited, a subsidiary of Eco Power Holdings Limited of Sri Lanka. Construction was completed in March 2011.[2] The power plant was technically commissioned on 18 March 2011.[2] Political commissioning was performed on 22 November 2011. The plant is expected to support development of industries and stimulate other areas of investment in Kanungu and the surrounding rural areas, including parts of the neighboring Democratic Republic of the Congo.[5]

See also

External links

Notes and References

  1. Web site: Oluka . Uganda's energy relief still a long way . Benon Herbert . . 18 February 2016 . 6 April 2010 . Kampala.
  2. Web site: Ishasha dam boosts grid supply . 9 June 2018 . 20 March 2011 . Patson . Baraire . . Kampala.
  3. Web site: 9 June 2018 . Distance between Ntungamo, Kanungu, Uganda and Kanungu, Uganda . 9 June 2018 . Globefeed.com . Globefeed.com.
  4. Web site: UNFCC . Ishasha 6.6 MW Small Hydropower Project: Project design document . 9 June 2018 . 8 October 2014 . United Nations Framework Convention on Climate Change (UNFCC) . New York City.
  5. Web site: 18 February 2016 . Kampala . Kanungu mini-hydro dam starts work today amid power outages . 22 November 2011 . Perez . Rumanzi . Daily Monitor.