Bridge Name: | Kamačnik Bridge |
Official Name: | Most Kamačnik |
Carries: | A6 motorway |
Crosses: | Kamačnik stream |
Locale: | Gorski Kotar, Croatia |
Maint: | Autocesta Rijeka - Zagreb |
Design: | Box girder bridge |
Mainspan: | 127.1 m |
Length: | 240 m |
Width: | 2 x 13.05 m |
Clearance: | 29 m |
Open: | 2003 |
Toll: | charged as a part of A6 motorway toll |
Coordinates: | 45.359°N 15.0655°W |
Kamačnik Bridge is located between the Vrbovsko and Ravna Gora interchanges of the A6 motorway in Gorski Kotar, Croatia, spanning Kamačnik stream. It is long. The bridge was designed by Zlatko Šavor. It consists of two parallel structures, both completed in 2003 by Konstruktor.[1] The bridge is tolled within the A6 motorway ticket system and there are no separate toll plazas associated with use of the bridge.[2]
The bridge spans deep Kamačnik stream bridge canyon which is legally protected as a listed landscape.[3] This prevents any construction on the canyon cliffs and in turn requires an asymmetrical structure across a span of approximately .[4]
At this location the motorway route follows a horizontal curve therefore the transversal grade of the deck is slightly increased. It is constant and equals 4.2%, while elevation grade of the bridge is constant at 5.7%, sloping down towards Vrbovsko. The bridge is a box girder structure supporting the deck across three spans. The southbound bridge spans are 71.18m (233.53feet) + 127.1m (417feet) + 23.9m (78.4feet). Its piers are and tall. The northbound bridge spans are 69.86m (229.2feet) + 127.74m (419.09feet) + 23.45m (76.94feet). Its piers are and tall. All of the piers comprise box cross section, 7.5m (24.6feet) (perpendicular to the bridge axis) by 4.5m (14.8feet) to 3.5m (11.5feet) (parallel to the bridge axis. The parallel bridge structures were built simultaneously.[1] [2] [4] [5]
Traffic is regularly counted and reported by Autocesta Rijeka - Zagreb, operator of the viaduct and the A6 motorway where the structure is located, and published by Hrvatske ceste. Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries substantial tourist traffic to the Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales.[6]
Kamačnik Bridge traffic volume | |||||||||
align=center style="background:#f2f2f2;" | Road | align=center style="background:#f2f2f2;" | Counting site | align=center style="background:#f2f2f2;" | AADT | align=center style="background:#f2f2f2;" | ASDT | align=center style="background:#f2f2f2;" | Notes |
A6 | 3006 Vrbovsko west | align=center | 11,979 | align=center | 20,091 | Between Vrbovsko and Ravna Gora interchanges. |