Kalena Agrahara | |
Other Name: | Gottigere |
Style: | Namma Metro |
Address: | Mantri Residency Rd, near Sri Meenakshi Sundareshwara Temple, Classic Orchards Layout, Kalena Agrahara, Bengaluru, Karnataka 560076 |
Coordinates: | 12.8716°N 77.5936°W |
Structure: | Elevated, Double track |
Platform: | Side platform (TBC) Platform-1 → Train Terminates Here Platform-2 → Platform Numbers (TBC) |
Operator: | Namma Metro |
Levels: | 2 (TBC) |
Tracks: | 2 (TBC) |
Parking: | (TBC) |
Opening: | (TBC) |
Electrified: | (TBC) |
Accessible: | (TBC) |
Status: | Under Construction |
Code: | (TBC) |
Owned: | Bangalore Metro Rail Corporation Ltd (BMRCL) |
Map State: | collapsed |
Mapframe: | yes |
Mapframe-Marker: | rail |
Mapframe-Zoom: | 14 |
Kalena Agrahara is an upcoming elevated southern terminal metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bangalore, India. This metro station serves residential properties and a few other locations including Prestige Elysian, Holy Spirit School (ICSE), Doddakammanahalli suburban area and Decathlon (Bannerghatta Road).
As per the latest updates, this metro station, under the first phase, covering a total distance of 7.5km elevated stretch (Kalena Agrahara - Tavarekere), is expected to be operational around September 2025. [2] [3] [4] [5] [6]
On March 2017, the Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for building the Kalena Agrahara metro station on the 7.5 km Kalena Agrahara - South Ramp section of the 21.25 km Pink Line of Namma Metro. This section comprises 5 stations, excluding Jayadeva Hospital, which was part of a joint venture between HCC - URC Constructions. Initially, Simplex Infrastructures won the tender in September 2017 but due to slow progress, their contract was terminated. [7] In July 2021, GR Infraprojects became the lowest bidder and was awarded the Rs 364.87 Crore contract for this section. They commenced the construction of this metro station as per the agreement. [8]
Station Layout - To Be Confirmed [9]
G | Street level | Exit/Entrance | |||
valign=top | L1 | valign=top | Mezzanine | valign=top | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |||
Platform # Southbound | Towards → Train Terminates Here | ||||
Platform # Northbound | Towards ← Next Station: Hulimavu | ||||
Side platform | Doors will open on the left | ||||
L2 | |||||
__FORCETOC__