Kai Tak station explained

Style:MTR
Kai Tak
Native Name:啟德
Native Name Lang:zh-Hant
Mlanguage:
T:啟德
S:启德
P:Qǐdé
W:Ch'i3-te2
Y:Káidāk
J:Kai2dak1
Showflag:y
Address:Concorde Road, Kai Tak Development Area
Borough:Kowloon City District, Hong Kong
Coordinates:22.3304°N 114.1994°W
Structure:Underground
Platform:2 (1 island platform)
Tracks:2
Accessible:Yes
Code:KAT
Owned:KCR Corporation
Operator:MTR Corporation
Map Type:Hong Kong MTR
Map Alt:Hong Kong MTR system map

Kai Tak is an underground MTR rapid transit station located on the Tuen Ma line, in the Kai Tak Development area of Hong Kong (near the old east apron of the former Kai Tak Airport in Kowloon City District). The station was opened on 14 February 2020 as part of the Tuen Ma line's first phase. It will provide access to the multi-purpose Kai Tak Sports Park, currently under construction, as well as other facilities. The station was built as part of the Sha Tin to Central Link (SCL).[1]

History

The contract to construct Kai Tak station (and the approach tunnels), valued at HK$1,422,000,000, was awarded on 25 April 2013 to the Kaden-Chun Wo joint venture.[2] The station was built using the cut-and-cover method. A topping-out ceremony was held on 16 July 2015. It was the second SCL station to be topped out, after Hin Keng.[3]

The station opened on 14 February 2020. It acted as the southern terminus for the Ma On Shan line (renamed Tuen Ma Line Phase 1 on the same day) until the entire opened on 27 June 2021.[4]

The station was temporarily closed on 17 July 2020 after a wartime bomb was found nearby.[5] The station reopened on the morning of the next day.

Features

The station includes an artwork within the adit leading to Exit A. Entitled Memories of Kai Tak – 1925–1998, the piece comprises a display of more than 30 photos and other materials related to the former Kai Tak Airport. It was designed by Cliff Dunnaway, author of two books about Hong Kong's aviation history.[6]

Station layout

The station has two levels: a concourse level above a lower level with an island platform.[7]

GGround levelExits
L1ConcourseCustomer service, MTRshops
L2
Platforms
SidingNo passenger service[8]
Platform 1← towards Tuen Mun (Sung Wong Toi)
Island platform, doors will open on the left
Platform 2 Tuen Ma line towards Wu Kai Sha (Diamond Hill)

Exits

Notes and References

  1. Web site: 27 October 2019. Scandal-hit HK$99 billion Sha Tin-Central rail link set for 2020 opening. 9 August 2020. South China Morning Post. en.
  2. Web site: MTR – Shatin to Central Link – Construction – Major Contracts Awarded. 9 August 2020. mtr-shatincentrallink.hk.
  3. Web site: Main Structure of Shatin to Central Link's Kai Tak Station Completed . MTR Corporation . 16 July 2015.
  4. News: MTR opens phase one of the Tuen Ma Line . RTHK . 14 February 2020.
  5. Web site: Police dismantle 45kg US wartime bomb at Kai Tak – RTHK. 9 August 2020. RTHK. en-gb.
  6. Web site: Time Tunnel at MTR Kai Tak Station Takes Passengers Back to Old Kai Tak . MTR Corporation . 20 April 2020.
  7. http://www.mtr.com.hk/chi/projects/images/KCDC%20Paper_final.pdf 九龍城區區議會沙中綫區議會諮詢文件
  8. Web site: zh:沙中線環評報告 197/2011號. http://www.epd.gov.hk/eia/register/report/eiareport/eia_1972011/EIA/pdf/Figures/FIGURE%206.2.2.pdf. 22 January 2012. zh.
  9. Web site: 28 September 2023 . New Entrance/Exit C at MTR Kai Tak Station Opens Today More Convenient Access between Station and Kai Tak and San Po Kong . 2024-04-09 . MTR.