MTR KTT explained

Background:orange
KTT - KCR Through Train Guangdong Through Train (MTR)
九廣通直通車
Service:1998–2020
Manufacturer:SLM and ABB (locomotives)
Kinki Sharyo (coaches)
Factory:Winterthur and Zürich, Switzerland (locomotives)
Osaka, Japan (coaches)
Fleetnumbers:Kowloon Through Train
Operator:MTR Corporation
Lines:MTR intercity services along East Rail line
Yearconstruction:1995
Yearservice:28 August 1998[1]
Numberbuilt:2 locomotives and 12 coaches
Carlength:
  • 25.50NaN0 (coaches)[2]
  • 18.50NaN0 (locomotives)[3]
Width:
  • 3.050NaN0 (coaches)
  • 30NaN0 (locomotives)
Height:
  • 4.60NaN0 (coaches)
  • 4.310NaN0 (locomotives)
Floorheight:1.25m (04.1feet)
Maxspeed:160km/h (design)
Weight:
  • 84t (locomotives)
  • 56t (premium class coaches)
  • 55.5t (first class coaches)
Capacity:112 (first class car), 72 (premium class car)
Acceleration:1m/s2
Deceleration:1m/s2 (service)
1.3m/s2 (emergency)
Traction:ABB GTOVVVF
Traction Motors:8 × ABB 6FHA-7067 1.6MW1.8MW 3-phase AC induction motor
Poweroutput:12.2MW
Electricsystem: Catenary
Collectionmethod:Pantograph
Brakes:Air
Coupling:Buckeye
Safety:AWS (former), TBL (enhanced with ATP)

KTT (Chinese: t=九廣通|s=九广通|order=ts)[4] is a train set used by the MTR Corporation Limited in Hong Kong on the Guangdong Through Train route. It is used on the Guangdong line (Hung Hom (Kowloon), Hong Kong - Changping - Guangzhou East) of the through train service.

The double-deck "KTT" trailers have bottom floors which are lower than ordinary cars serving on the same pair of tracks.

After the Guangdong Through Train and all other intercity passenger services were suspended in early 2020 amidst the coronavirus pandemic, the KTT trains were placed into storage. Despite border reopenings, there were no plans to resume intercity services.

In 31 July 2024, the General Administration of Customs announced that in June 2024, the State Council had approved the closure of all four railway ports of the inter-city through trains, effective from the date of notice, citing that high-speed passenger trains have effectively met the travel needs of passengers between the mainland and Hong Kong.[5]

Rolling stock

Builder Model Fleet size Notes
SLM
ABB
SBB-CFF-FFS Re 4602electric locomotives numbered TLN001 and TLS002 arrived in Hong Kong on 11 May 1997
Kinki SharyoPremium Class T1 (T1C) and First Class T2 (T2A, T2B)12passenger carriages

Although the locomotive has a top speed of 2000NaN0, KTT only runs at a maximum service speed of 1400NaN0 on the Hong Kong section of the Guangzhou - Kowloon Railway and at 1600NaN0 on the Guangzhou - Shenzhen Railway. KTT now has ten compartments (eight first-class compartments and two executive-class compartments).

Since March 2018, all KTT coaches have undergone minor refurbishments. Refurbished trains feature reupholstered seats, new flooring, train automatic broadcast system devices and improved barrier-free facilities.

See also

Notes and References

  1. Book: Kowloon–Canton Railway Corporation Annual Report 1998. 1999. KCR Corporation. Hong Kong. 8.
  2. Web site: MTR Corporation Hong Kong, China Passenger Car. Kinki Sharyo. 1 March 2018.
  3. News: KTT expresses to link Kowloon and Guangzhou. Railway Gazette. 1 March 2018.
  4. http://www.mtr.com.hk/eng/intercity/index.html MTR Intercity Passenger Services
  5. Web site: 31 July 2024 . 海關總署公告2024年第96號(關於關閉北京西站、上海站、廣州、東莞等4個鐵路口岸的公告) . live . https://web.archive.org/web/20240731135355/http://gdfs.customs.gov.cn/customs/302249/2480148/6013329/index.html . 31 July 2024 . 31 July 2024 . General Administration of Customs of the People's Republic of China.