Color: | 28457D |
KSR Bengaluru - Dharwad - Belgaum Vande Bharat Express | |
Type: | Vande Bharat Express |
Locale: | Karnataka |
First: | (Inaugural run) (Commercial run) (Extension to Belgaum) (TBC) |
Operator: | South Western Railways (SWR) |
Start: | KSR Bengaluru City Jn (SBC) |
Stops: | 3 5 (after extn to Belgaum) |
End: | (DWR) (Extn (TBC)) (BGM) |
Distance: | 490km (300miles) After Extn, 612km (380miles) |
Journeytime: | 06 hrs 25 mins |
Frequency: | Six days a week |
Trainnumber: | 20661 / 20662 |
Line Used: | Bengaluru - Hubli line |
Class: | AC Chair Car, AC Executive Chair Car |
Sleeping: | No |
Catering: | On-board catering(veg,non_veg) |
Observation: | Large windows in all coaches |
Baggage: | Overhead racks |
Otherfacilities: | Kavach |
Stock: | Mini Vande Bharat 2.0 |
Gauge: | Indian gauge broad gauge |
Speed: | (Avg, between KSR Bengaluru and Hubli Jn.[1]) |
Trainlength: | 192m (630feet) (08 coaches) |
Owners: | Indian Railways |
Maintenance: | KSR Bengaluru City Jn (SBC) |
Map State: | collapsed |
Electrification: | 25 kV 50 Hz AC Overhead line |
The 20661/20662 KSR Bengaluru - Dharwad Vande Bharat Express is India's 21st Vande Bharat Express train, connecting the city of Bengaluru with Dharwad city in Karnataka.[2] [3] [4] This train was flagged off by Prime Minister Narendra Modi on 27 June 2023 via video conference from Rani Kamalapati (Habibganj) railway station.[5] [6] [7]
As per latest updates, this VB express will continue its journey and will terminate at Belagavi (Belgaum) railway station at an earlier convenient date.[8] [9] [10]
On 21 November 2023, the trial run was performed by starting from KSR Bangalore City Jn around 05:45am and terminating at Belagavi at 01:30pm. It left from Belgaum at 02:00pm and reached Bengaluru City at 10:10pm.[11]
This train is operated by Indian Railways, connecting KSR Bengaluru City Jn, Yesvantpur Jn, Davangere, SSS Hubballi Junction and Dharwad. It is currently operated with train numbers 20661/20662 on 6 days a week basis.[12] [13] [14] [15]
It is the nineteenth 2nd Generation and the seventh Mini Vande Bharat 2.0 Express train which was designed and manufactured by the Integral Coach Factory at Perambur, Chennai under the Make in India Initiative.[16]
The 20661/20662 KSR Bengaluru - Dharwad Vande Bharat Express operates 6 days a week, covering a distance of in a travel time of 6 hrs 25 mins with an average speed of . The Maximum Permissible Speed is .[17] [18] [19]