The Jubilee Line Extension (JLE) is the extension of the London Underground Jubilee line from to through south and east London. An eastward extension of the line was first proposed in the 1970s. As part of the development of London Docklands, the line was extended to serve Canary Wharf and other areas of south and east London. Construction began in 1993, and it opened in stages from May to December 1999, at a cost of £3.5 billion.

The 11 new stations were designed to be "future-proof", with wide passageways, large quantities of escalators and lifts, and emergency exits. The stations were the first on the Underground to have platform edge doors, and were built to have step free access throughout. Each of the stations was designed by a different architect, and the overall design of the project was led by Roland Paoletti. The stations have subsequently been praised as exemplary pieces of 20th-century architecture. The project was the single largest addition to the Underground in 25 years.

Stations

The extension diverges just east of, eastward to:

Station London borough InfrastructureArchitects[1]
new ticket hall and two additional deep-level platformsHopkins Architects
new ticket hall and two additional deep-level platformsJLE Project Architects
new station with two deep-level platformsMacCormac, Jamieson, Prichard
new ticket hall and two additional deep-level platformsWeston Williamson and JLE Project Architects
new station with two deep-level platformsIan Ritchie
new station with two deep-level platforms and two new sub-surface platforms on East London LineJLE Project Architects and Heron Associates
new bus stationEva Jiřičná
new station with two deep-level platformsFoster + Partners
new station with three deep-level platformsAlsop, Lyall and Störmer
new bus stationFoster + Partners
new station with two surface platforms, two new elevated platforms for the DLR and two surface platforms for the North London line, new bus stationTroughton McAslan
new station building with two additional surface platformsVan Heyningen and Haward Architects
new station building and plazaWilkinsonEyre
three additional surface platforms and train crew buildingTroughton McAslan

Before the extension, the Jubilee line terminated at . The section between Charing Cross and Green Park, which diverges to the northwest, is now unused for passenger services but is maintained for emergency use. The abandoned platforms are occasionally rented out by TfL as a film set e.g. Skyfall, and Woman in Black II.[2]

Planning

Original 1970s plans

The Jubilee line between and was intended to be the first phase of the Fleet Line (as the Jubilee line was originally called).[3] In the first version of the Fleet Line Extension plan, the line ran from Charing Cross via and to station, then via tunnel under the River Thames to connect to the East London line north of Surrey Docks (now Surrey Quays) from where it would take over Underground services to and with tunnels continuing from the latter to Lewisham. In anticipation of this, the tunnels of the first phase of the line continued eastward from Charing Cross under Strand almost as far as Aldwych.

This plan was modified shortly before the Jubilee line opened in 1979. Under the new plan (known for planning purposes as the River Line), it would run to Fenchurch Street as before and continue via the Isle of Dogs, Royal Docks and Woolwich Arsenal to the "new town" at Thamesmead. A branch from Silvertown to Beckton would have provided a link to a new depot. This route is not dissimilar to the Crossrail route through the Docklands.

Jubilee Line Extension

Plans to extend the line were revived in the late 1980s, prompted by the proposed development of London Docklands and Canary Wharf, which substantially increased the predicted numbers of jobs in the Isle of Dogs and required a transport network with much greater capacity than provided by the Docklands Light Railway (DLR). Initially, Olympia and York, the developers of Canary Wharf, proposed building a dedicated 'Waterloo and Greenwich Railway' from Waterloo through London Bridge to Canary Wharf and then to Westcombe Park in Greenwich, costing £400 million. However, London Transport resisted this, preferring to wait for the results of studies into new railway construction. One of these, the East London Railway Study, recommended an extension of the Jubilee line from Green Park to Westminster, then following the route of the Waterloo and Greenwich Railway, continuing to Stratford via Canning Town alongside the North London Line. This option was adopted, with an estimated cost of £2.1 billion to which Olympia and York would make a £400 million contribution, the original cost estimate of the Waterloo and Greenwich Railway. In the end it cost £3.5bn, partly because of huge cost overruns during construction. Where initially the developers were to pay for a large part of the extension, their final contribution was less than 5%.[4]

The extension was authorised in 1990. A station was originally planned at Blackwall, but this was replaced by diverting the line between Canary Wharf and Stratford underneath the Thames to serve the Greenwich peninsula at station. Plans for the Millennium Dome did not yet exist, and this diversion was made to provide for a planned housing development on the site of disused gasworks. British Gas plc contributed £25 million to the scheme.[5] The stations at Southwark and Bermondsey were not initially certain.[6]

The project also required the construction of a new depot to serve the extended line, given the increased number of trains could not be accommodated at the existing Neasden Depot - hence a site at Stratford Market was chosen.[7] [8] 59 1996 Stock trains were ordered as part of the extension, following cancellation of the plan to heavily refurbish the original 1983 stock trains.[9]

Main works were authorised by the London Underground Act 1992,[10] with additional works allowed by the London Underground (Jubilee) Act 1993.[11] In May 1992, Olympia and York (the developers of Canary Wharf) went into administration following the early 1990s recession. This caused a delay to the project, as the Treasury did not wish to proceed without private sector investment.[12] In September 1993, the financial restricting of Canary Wharf was completed, and it was agreed that the £400 million contribution would be maintained.[13] In October 1993, Secretary of State for Transport John MacGregor gave the go ahead for the project.[14] Contracts to built the project were awarded soon after, at a cost of around £1.2 billion.

Construction

Construction of the project began on 8 December 1993, with a ceremony at Canary Wharf attended by Prime Minister John Major.[15] [16] Construction was expected to take 53 months, with an opening date of May 1998.[17] Tunnelling began in August 1994 at North Greenwich. By August 1996, all tunnelling work had been completed.

Tunnelling had been delayed after a collapse during the Heathrow Express project in October 1994, which used the same New Austrian Tunnelling method.[18] Indeed, construction under Westminster caused the Elizabeth Tower to tilt slightly.[19] Other delays subsequently affected the project, including wildcat strikes by electricians and changes to the designs of the stations.[20] [21] The extension was supposed to have moving block signalling, designed by Westinghouse, in order to reach 36 trains per hour at peak times. As design of this overran, this was postponed in favour of more traditional signalling.[22] Twelve years later these features were completed, allowing for up to 33 trains per hour.[23] By November 1997, a September 1998 date was planned.[24]

The new Stratford Market Depot was completed in March 1998 - allowing for testing and commissioning of the new 1996 Stock trains, as well as the testing of the new extension itself.[25] [26] By June 1998, opening was planned in Spring 1999.[27] By November 1998, a phased opening throughout 1999 was being considered.[28] [29] By February 1999, the cost of the extension had increased to a total of £3.3 billion.[30]

Opening

The first phase of the extension from Stratford to North Greenwich was opened by the Deputy Prime Minister John Prescott on 14 May 1999.[31] There was concern that the entire line would not be open in time for the Millennium Dome, which would open on 1 January 2000. The second phase between North Greenwich and Bermondsey opened on 24 September 1999.[32] The extension was linked to the rest of the Jubilee line with the opening of the final phase on 20 November 1999.[33] Westminster – complicated by the interface with the subsurface platforms, which remained in operation during construction – opened on 22 December 1999, shortly before the Millennium Dome deadline.[34] The final construction cost of the extension was £3.5 billion.[35]

In 2005, a criminal trial regarding corruption and insider information during the construction of the extension collapsed, after 21 months and a cost of £60m.[36]

Design

The design of the extension is radically different from anything else on the London Underground.[37] Stations are characterised by cavernous, stark interiors lined with polished metal panels and moulded concrete walls and columns. has been compared to a cathedral, with it being said that the neighbouring One Canada Square, if laid on its side, could fit in the station with room to spare. has a dramatic vertical void nearly 40m (130feet) deep.

The size of the stations was a response to safety concerns - overcrowding and a lack of exits had been significant factors in the 1987 King's Cross disaster - and an attempt to "future-proof" stations by designing from the start for a high use.[38] Most platforms and halls are full only in a busy rush hour,[12] all provide step-free access, platforms have emergency exits at both ends, ventilation, as well as fireproof lifts. To ensure passenger flow, a large quantity of escalators (at least 3 per station) were installed, totalling 115 over the entire extension, increasing the total number of escalators over the entire Underground network by almost half.[39]

The extension was also built with a wider tunnel diameter of 4.35 m allowing a passenger walkway used for emergency purposes, unfortunately wider trains are not possible due to the narrower tunnel dimension northwards of Green Park.

A number of leading architects were employed to design the stations, overseen by Roland Paoletti and a small team of in-house JLE Architects.[40] It was decided from the outset that although each station would be designed as an individual entity, they would be linked by a common design philosophy and functional elements.[41] Spaciousness was the most noticeable, along with the shared theme of grey and silver polished metal and concrete interiors. More subtly, many stations were designed to admit as much natural light as possible. At and to a lesser extent at Canada Water and, rotundas and shafts allow daylight to reach, or nearly reach, the platforms.[12]

The platforms saw another innovation: full-height platform edge doors, to improve airflow, prevent people from jumping or falling onto the track,[12] prevent litter depositing upon the track and stop dirt circulating around the network, amongst other features. These are the first doors to be installed on a commercial railway in Great Britain.

Reception

Upon opening, the Jubilee Line Extension was widely welcomed, with praise for the architecture, accessibility and expansion of the Tube to south-east and east London.[42] [43] Many of the new stations subsequently received individual awards and commendations for their architecture, including Westminster and Canary Wharf being jointly awarded the 2000 Civic Trust Building of the Year. The Royal Fine Art Commission named the extension as a whole their Millennium Building of the Year, with the chair of the judging panel calling it "comparable to the achievement of Haussmann when he constructed the great boulevards of Paris".[44]

For his work on the project, Roland Paoletti received the RIBA/Arts Council Award for "Client of the Year" 1999 and was appointed a Commander of the Order of the British Empire (CBE) in the 2000 New Year Honours for "services to Architecture".[45] [46] The Architectural Review called him "the Medici of London Transport".[47]

Legacy

Since the opening of the extension in 1999, areas along the line such as Canary Wharf, the Greenwich Peninsula and Stratford have seen substantial commercial and residential development. Canary Wharf has become London's second financial district, rivalling the City of London.[48] Research by KPMG and Savills for Transport for London (TfL) indicated that the extension led to increases in land value along the line of around 50%.[49] In 2004, TfL published a report showing "substantial benefits" as a result of the extension, including development of the Canary Wharf financial district, reduced travel time for residents along the line and improved modal share.[50] As part of the development of the Crossrail project, TfL estimated that agglomeration benefits as a result of the JLE led to a benefit–cost ratio of around 3, an increase from 1.56 calculated in 1989.

The extension has proved extremely successful in relieving congestion on the DLR and in opening up access to parts of east London with formerly poor transport links. As such it allowed (theoretically - barring peak/off-peak timetable restrictions i.e. to Chesham or Mill Hill East etc.) access to all other London Underground stations with only a single change.

The Jubilee line was considered an essential part of the public transport network for the London 2012 Olympic and Paralympic Games, allowing access to major venues in Stratford and the Royal Docks.[51] [52], ridership on the line has increased substantially since the extension opened, becoming the 3rd busiest Underground line, with the Jubilee line having four of the 10 busiest stations.[53]

The stations themselves have subsequently been praised as exemplary pieces of 20th century architecture,[54] [55] with Canary Wharf was voted as the "most loved" tube station in London in 2013,[56] and Westminster was selected by Londoners as one of 10 favourite transport design icons in 2015.[57]

Notes and references

References

Further reading

External links

Notes and References

  1. Book: Architecture of the Jubilee Line Extension. Bennett, David. 2004. Thomas Telford. 0727730886. London. 51870430.
  2. News: Filming on the London Underground. london75. 2015-04-14. Insider London. 2018-10-10. en-GB.
  3. Book: Wolmar, Christian . Christian Wolmar . The Subterranean Railway: How the London Underground Was Built and How It Changed the City Forever . Atlantic Books . 2004 . 2005 . 1-84354-023-1 . 308.
  4. Web site: LRB · James Meek · Crocodile's Breath . Lrb.co.uk . 22 June 2010.
  5. Web site: Jubilee Line Extension . . 18 May 1992 . 22 June 2010.
  6. Web site: London Underground Bill (By Order). Parliamentary Debates (Hansard). 12 July 1990.
  7. Book: Mitchell, Bob, C. Eng.. Jubilee Line extension : from concept to completion. 2003. Thomas Telford. 0-7277-3028-2. London. 51945284.
  8. Book: Bennett, David.. Architecture of the Jubilee Line Extension.. 2004. Institution of Civil Engineers. 978-0-7277-4577-4. 935052993.
  9. Book: Mitchell, Bob . Jubilee Line extension : from concept to completion . 2003 . Thomas Telford . 0-7277-3028-2 . London . 51945284.
  10. Web site: London Underground Act 1992 (c. iii) (c. 3) . 22 June 2010 . Opsi.gov.uk.
  11. Web site: London Underground (Jubilee) Act 1993 (c. ix) (c. 9) . 22 June 2010 . England-legislation.hmso.gov.uk.
  12. Web site: UK Jubilee Line Extension (JLE) . 28 October 2016 . omegacentre.bartlett.ucl.ac.uk . Bartlett School of Planning.
  13. Book: Mitchell, Bob . Jubilee Line Extension: From Concept to Completion . Thomas Telford Publishing . 2003 . 0727730282 . London . 324-236.
  14. Book: Mitchell, Bob . Jubilee Line Extension: From Concept to Completion . Thomas Telford Publishing . 2003 . 0727730282 . London . 48 .
  15. Book: Mitchell, Bob . Jubilee Line Extension: From Concept to Completion . Thomas Telford Publishing . 2003 . 0727730282 . London . 49 .
  16. Web site: 1993-12-08 . Mr Major’s Comments at Jubilee Line Extension Inaugural Ceremony – 8 December 1993 – The Rt. Hon. Sir John Major KG CH . 2024-02-19 . johnmajorarchive.org.uk . en-US.
  17. Web site: Jubilee Line Extension. Parliamentary Debates (Hansard). 28 June 1993.
  18. News: 15 February 1999 . Record fine after tunnel collapse . BBC News.
  19. Web site: 2019-04-19 . The Jubilee Line Is 40 Years Old... Here Are Some Awesome Vintage Photos . 2019-04-20 . Londonist . en.
  20. Web site: 1999-02-04 . Where the JLE went wrong . 2023-09-28 . Construction News . en.
  21. News: Horsnell . Michael . 19 November 1998 . Sabotage holds up the millennium line . . 1.
  22. News: 3 October 2003 . Moving block signals finally go ahead on Jubilee Line . New Civil Engineer .
  23. Book: Green, Oliver . The Tube: Station to Station on the London Underground . Shire Publications Ltd . 2012 . 978-0-74781-227-2 . Botley, Oxford . 55–59, 109–115.
  24. Web site: 10 November 1997 . Jubilee Line Extension . Parliamentary Debates (Hansard).
  25. Web site: 1998 . LUL Stratford Market Depot . 28 May 2020 . Structural Steel Design Awards.
  26. Web site: Stratford Market Depot AJ Buildings Library . 2020-05-28 . www.ajbuildingslibrary.co.uk.
  27. Web site: Jubilee Line Extension. Parliamentary Debates (Hansard). 9 June 1998.
  28. Web site: Jubilee Line Extension: Westminster Station. Parliamentary Debates (Hansard). 27 April 1998.
  29. Web site: Jubilee Line Extension. Parliamentary Debates (Hansard). 27 November 1998.
  30. Web site: Harper, Keith . 16 February 1999 . Jubilee line cost races towards record books at £330m a mile . 29 June 2015 . The Guardian.
  31. Web site: 14 May 1999 . Prescott launches Dome tube link . 2023-03-24 . BBC News.
  32. Book: Horne, Mike . The Jubilee Line . Capital Transport . 2000 . 1-85414-220-8 . 80.
  33. Web site: 20 November 1999 . Jubilee Line finally opens . 2023-03-24 . BBC News.
  34. Web site: Jubilee line facts . Transport for London . dead . https://web.archive.org/web/20080212182726/http://www.tfl.gov.uk/tfl/corporate/modesoftransport/tube/linefacts/?line=jubilee . 12 February 2008 .
  35. Web site: London Underground Jubilee Line . 2023-09-28 . Railway Technology . en-US . Costing a total of £3.5bn when completed,.
  36. News: 2005-03-23 . £60m fraud case collapse probed . en-GB . . 2023-03-24.
  37. Web site: 1992-10-20 . Architecture: It goes far beyond Canary Wharf: There are compelling . 2024-01-25 . The Independent . en.
  38. Book: Green, Oliver . The Tube:Station to Station on the London Underground . Shire Publications Ltd. . 2012 . 978-0-74781-227-2 . Botley, Oxford . 57, 114.
  39. Book: Glover, John . London's Underground . Ian Allan Publishing Ltd . 2010 . 978-0-7110-3429-7 . 11th . Hersham . 127–131.
  40. Web site: Wu . Sui-Te . Roland Paoletti (1931–2013) . 2023-03-24 . . en.
  41. Web site: Williamson . Chris . Happy birthday, Jubilee Line Extension . 2023-03-24 . . en . He wanted each architect to choose or design their own components for cladding, seating, lighting and finishes.
  42. News: Glancey . Jonathan . 2000-01-29 . East meets West . 2024-01-25 . The Guardian . en-GB . 0261-3077.
  43. News: Saint . Andrew . 2000-01-20 . Andrew Saint · Diary: The Jubilee Line Extension . 2024-01-25 . London Review of Books . en . 22 . 02 . 0260-9592.
  44. Web site: Davies . Hugh . 2000-06-13 . 'Brilliant' Jubilee Line wins Millennium award . 2015-09-23 . The Daily Telegraph.
  45. Book: Mitchell, Bob . Jubilee Line Extension: From Concept to Completion . Thomas Telford Publishing . 2003 . 0727730282 . London . 355–356.
  46. News: 1999-12-31 . New Years Honours List — United Kingdom . 55710 (Supplement No. 1) . 10 . The London Gazette . 2015-09-13.
  47. Web site: 2013-11-19 . Roland Paoletti – Obituary . 2015-09-23 . The Daily Telegraph.
  48. Web site: Schabas . Michael . 2017-01-26 . The Jubilee Line Extension . 2024-02-19 . www.modernrailways.com . en.
  49. Web site: February 2017 . Land value capture . London.gov.uk . . 7.
  50. Web site: 25 October 2004 . TfL Publishes Report into Impacts of Jubilee Line Extension . 2024-02-19 . Transport for London . en-GB.
  51. News: 2012-01-31 . London 2012 Olympics: Do we love the Jubilee Line? . 2024-02-19 . BBC News . en-GB.
  52. Web site: 19 July 2013 . The London 2012 Games transport legacy: one year on . 2024-02-19 . Transport for London . en-GB.
  53. Web site: May . Jack . 2023-02-05 . Which London Tube line is the busiest? . 2024-02-19 . City Monitor . en-US.
  54. Web site: 10 May 2022 . Elizabeth Line "more mannered" than Jubilee predecessor says head of architecture . live . https://web.archive.org/web/20220808182022/https://www.dezeen.com/2022/05/10/elizabeth-line-crossrail-architecture-interviews/ . 8 August 2022 . 8 August 2022 . Dezeen.
  55. News: Dickinson . Greg . 2024-01-15 . The best and worst London Underground lines (according to science) . 2024-02-19 . The Telegraph . en-GB . 0307-1235.
  56. News: 2013-04-23 . Londoners say Bank Tube station is capital's worst . 2023-03-24 . BBC News . en-GB . Canary Wharf, designed by Lord Foster, was voted Londoners' favourite stop.
  57. Web site: 4 November 2015 . London's top design icons revealed . 24 March 2023 . ITV News.