Jixi Pumped Storage Power Station Explained

Jixi Pumped Storage Power Station
Name Official:绩溪抽水蓄能电站
Coordinates:30.1593°N 118.7617°W
Country:China
Location:Jixi County
Status:O
Construction Began:2010
Opening:2019-2021
Cost:CNY¥8.2 billion (US$ 1.2 billion)[1]
Res Capacity Total:105980000NaN0
Lower Res Capacity Total:109440000NaN0
Plant Turbines:6 x 300 MW Francis pump turbines
Plant Capacity:1,800 MW

The Jixi Pumped Storage Power Station is a pumped-storage hydroelectric power station currently under construction in Jixi County, Anhui Province, China. Studies were carried out in 2008 and construction began in December 2010. It is expected to last 6 years.[2] [3] As of April 2017 the dam is completed.[4] First turbine was commissioned in December 2019, followed by second in May 2020 and third and fourth in August 2020. The last two units were commissioned in February 2021.[5]

Reservoirs

The lower reservoir is formed by a 63.90NaN0 tall and 4800NaN0 long concrete-face rock-fill dam (CFRD), with a storage capacity of 109440000NaN0 of which 86700000NaN0 is active (or 'usable') for pumping. The upper reservoir is formed by a CFRD as well, which is 114.20NaN0 tall and 3300NaN0 long, withholding a 105980000NaN0 man-made lake. The normal elevation of the lower reservoir is 339.30NaN0 and the upper 9610NaN0. This difference in elevation affords a rated hydraulic head of 5990NaN0. The power station is located underground near the bank of the lower reservoir and contains six 300 MW Francis pump turbine-generators.[6]

See also

Notes and References

  1. Web site: Jixi pumped-storage hydro plant begins operation in China. HydroWorld. 20 January 2012.
  2. Web site: Jixi 7 billion to build pumped storage power station . https://archive.today/20130126185236/http://www.jixirj.com/30f53dc5e5e4-1438.html . dead . 26 January 2013 . Jixirj . 20 January 2012 . Chinese .
  3. Web site: National Development and Reform Commission approved the Jixi pumped-storage power plant project to carry out preparatory work. Bureau of Energy. 20 January 2012. Chinese.
  4. Web site: 2017-07-23. 安徽省最大抽水蓄能电站下水库大坝填筑完成 - 北极星电力新闻网. news.bjx.com.cn.
  5. Web site: 宣城绩溪抽水蓄能电站,全力保障华东电网安全!. www.sohu.com . 3 May 2022 . zh-CN.
  6. Web site: About Anhui Jixi pumped storage power station . Electric Technology Co., Ltd. . 20 January 2012 . Chinese . dead . https://web.archive.org/web/20141225135307/http://www.yztpdq.com/articleinfo/detail_5_10_2505.aspx . 25 December 2014 .