Line 6 (Chongqing Rail Transit) Explained

Type:Rapid transit
System:Chongqing Rail Transit
Status:operational
Start: (Main line)
(International Expo branch)
End: (Main line)
(International Expo branch)
Stations:40
(28 on the main line)
(12 on International Expo branch)
Daily Ridership:452,300 (2016 Peak)[1]
Operator:Chongqing Rail Transit Corp., Ltd
Linelength:85.54km (53.15miles)
Gauge:1435 mm
Speed:100 km/h (peak)

CRT Line 6 (and the branch line branded as International Expo line) is the second heavy rail subway line in Chongqing, as well as being the longest rapid transit line in China, at 85.62NaN2 long. It opened with provisional revenue service on September 28, 2012, and connects Nan'an, Yuzhong, and Jiangbei districts in central Chongqing.

Opening timeline

SegmentCommencementLengthStation(s)Name
Wulidian  - Kangzhuang28 September 201213.912NaN29Phase 1 (initial section)
Kangzhuang  - Lijia26 December 20123.92NaN21Phase 1 (2nd section)
Ranjiaba20 January 2013Infill station1
Lijia  - Yuelai15 May 201312.12NaN22International Expo line Phase 1
Lijia  - Beibei31 December 201323.42NaN24Phase 2 (northern section)
Jiuquhe, Tiansheng28 September 2014Infill stations2
Xiangjiagang26 November 2014Infill station1
Chayuan  - Wulidian30 December 201419.22NaN27Phase 1 (final section) & Phase 2 (southern section)
Pingchang, Huangmaoping28 February 2015Infill stations2
Caojiawan, Gaoyikou26 October 2015Infill stations2
Jiangbeicheng28 January 2016Infill station1
Yuelai  - Shaheba31 December 202013.992NaN2[2] 7International Expo line Phase 2

Stations (south to north)

Operational

Under Construction

Covering a distance of 6.7 km, this extension starts from Liujiaping station and branches off towards Chongqing East Station, with 2 stations in between.[4] The project began on 28 March 2022.[5]

Station
Station nameConnectionsLocation
6/**
Chongqingdong
Nan'an
6/**
6/**
6/04

Features

Caijia Rail Transit Bridge

The line crosses the Jialing River via Caijia Rail Transit Bridge . Construction work began in October 2010 and it was completed in December 2013.[6]

Notes and References

  1. Web site: http://cq.qq.com/a/20161002/003480.htm . zh:重庆轨道客运量9月30日创新高 达到257.4万乘次.
  2. Web site: 重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告. 2020-08-21. https://web.archive.org/web/20200830044104/http://www.cqjtkt.cn/news/2020821/2020821154913325189.htm. 2020-08-30. live.
  3. Web site: 重庆轨道交通4座车站于12月1日更名. 2019-11-30.
  4. Web site: 轨道交通6号线东延项目可研获批 全长6.7公里. 2022-01-16.
  5. Web site: 轨道交通6号线东延伸段开工. 2022-03-28.
  6. Web site: 重庆市蔡家轨道大桥 . 2022-09-09.