Jinping-I Dam Explained

Jinping-I Dam
Name Official:Jinping-I Hydropower Station
Dam Crosses:Yalong River
Location:Yanyuan County and Muli Tibetan Autonomous County, Liangshan Prefecture, Sichuan, China
Dam Type:Arch, double-curvature
Dam Length:568.6m (1,865.5feet)
Dam Height:305m (1,001feet)
Spillway Type:Crest, bottom outlets, flood tunnel
Spillway Capacity:Crest: 2993m3/s
Bottom outlets: 5465m3/s
Tunnel: 3651m3/s
Construction Began:2005
Opening:2013
Purpose:Power
Status:Operational
Owner:Yalong River Hydropower Development Company, Ltd.
Operator:MWREP
Res Name:Jinping-I Reservoir
Res Capacity Total:7760000000m2
Res Capacity Active:4910000000m2
Res Catchment:102560km2
Res Surface:82.55km2
Plant Turbines:6 × 600 MW Francis-type
Plant Capacity:3,600 MW
Plant Annual Gen:16–18 TWh
Plant Commission:2013–2014
Location Map:China Sichuan#China
Coordinates:28.1828°N 101.6308°W

The Jinping-I Dam also known as the Jinping-I Hydropower Station or Jinping 1st Cascade, is a tall arch dam on the Jinping Bend of the Yalong River (Yalong Jiang) in Liangshan, Sichuan, China. Construction on the project began in 2005 and was completed in 2014. Its power station has a 3,600 MW capacity to produce between 16 and 18 TW·h (billion kW·h) annually. Supplying the power station is a reservoir created by the 305-meter-tall arch dam, the tallest in the world. The project's objective is to supply energy for expanding industrialization and urbanization, improve flood protection, and prevent erosion.

History

Harnessing hydropower on the Jinping bend of the Yalong River has been in planning for decades. The length of bend around the Jinping Mountains is 150 km but the downstream (northbound) part of the river on the opposite side is only separated by 16 km. Between that distance, there is an elevation drop of 310 m, creating an excellent situation for hydroelectricity production. Two projects were planned for the bend, the Jinping I and Jinping II with a combined capacity of 8,400 MW. Planning for the projects began in the 1960s under the former Sichuan and Shanghai design institutes along with the Ministry of Water Resources and Electric Power. They produced the "Reinvestigation Report on The Yalong River bend (Jinping)". In July 1965, the Jinping Hydropower Engineering Headquarters was set up and designs for the Jinping 1 and Jinping 2 would progress with the East China Investigation and Design Institute.[1]

Construction began on 12 November 2005. The dam began to impound its reservoir on 8 October 2012. First power was generated in 2013 with the remainder of the work to be completed by 2015.[2] The rapid impounding has been linked to reservoir-induced seismicity by a Chinese geologist. Out of hundreds of small earthquakes during impoundment, three between 3.9MW and 4.58MW were recorded on 22 November 2013 on a nearby fault line.[3]

The dam began to impound its reservoir on 8 October 2012 and the first two of six 600 MW generators became operational on 30 August 2013.[4] The sixth and final generator was commissioned on 15 July 2014.[5] The final generator for Jinping-II downstream was commissioned in November 2014.[6]

Geography

The Jinping-I Dam is on the border of the Yanyuan and Muli counties in the Liangshan Yi Autonomous Prefecture of the Sichuan province. The Yalong River, which the dam controls, is the largest tributary of the Jinsha. For the project, approximately 7,500 inhabitants were expected to be relocated.

Design

The 305m tall and 568m long arch dam supplies the power station with water from a 7.7 billion m3 reservoir, of which 4.9 billion m3 is active or usable storage. The dam itself has a structural volume of 7.4 million m3. To control flooding, the dam is equipped with a controlled spillway on its crest with four gates and the capability to discharge up to 2993m3/s. Five bottom outlets on the dam's orifice capable of discharging 5465m3/s and a tunnel with a discharge capacity of 3651m3/s with augment flood control as well. The power station will contain six 600 MW Francis turbines. Water discharged from the power station is then diverted downstream by the Jinping 2 Dam to the Jinping 2 Hydropower Station.[7]

See also

Notes and References

  1. https://archive.today/20120730222342/http://img24.imageshack.us/i/jinpingmapdreamzb7.jpg/ The Big River Bend and The "Jinping Dream"
  2. Web site: SDIC Electric Power: impoundment Jinping Hydropower Station. Economic Times Network. 10 December 2012. zh. 4 December 2012. 17 November 2018. https://web.archive.org/web/20181117134728/http://gegu.stock.cnfol.com/121204/125,1332,13850234,00.shtml. dead.
  3. Web site: Jinping-I Dam impoundment linked to earthquakes. Probe International. 2 April 2014. 3 February 2014.
  4. Web site: The world's highest arch dam Jinping first production unit . https://archive.today/20130909181936/http://energy.people.com.cn/n/2013/0902/c71661-22774787.html . dead . 9 September 2013 . Economic Times Network . 9 September 2013 . zh . 2 September 2013 .
  5. Web site: Sichuan Investment and Energy: Jinping is now fully operational commercial operation. Great Wisdom Finance Shanghai. 7 January 2015. zh. 15 July 2014.
  6. Web site: "West to East" backbone project Jinping Power All units put into operation. 26 November 2014. 7 January 2015. zh.
  7. Web site: Jingping. Chinese Committee on Large Dams. 23 August 2011. dead. https://web.archive.org/web/20131217211018/http://www.chincold.org.cn/news/li080321-12-Jinping-1.pdf. 17 December 2013.