Native Name: | 青岛地铁8号线 |
Native Name Lang: | zh-cn |
Type: | Rapid transit |
System: | Qingdao Metro |
Status: | In operation |
Locale: | Qingdao, China |
Stations: | 11 (operational) |
Open: | [1] |
Owner: | Government of Qingdao |
Operator: | Qingdao Metro Corporation |
Linelength: | 48.32NaN2 |
Tracks: | 2 |
Line 8 of Qingdao Metro is a rapid transit line in Qingdao, Shandong, China, which opened on 24 December 2020.[1]
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Jiaozhou North Railway Station — Qingdao North Railway Station | 24 December 2020 | 48.32NaN2 | 10 | North section | |
Jiaodong International Airport | 20 July 2021[2] | Infill station | 1 |
Station name | Connections | Distance | Location | |||
---|---|---|---|---|---|---|
JZK | Jiaozhou | |||||
TAO QJK | ||||||
Chengyang | ||||||
Hongdao railway station | ||||||
QHK | Licang | |||||
Licang | ||||||
Shibei | ||||||
Shinan | ||||||
Station name | Connections | Distance | Location | |||
---|---|---|---|---|---|---|
(Main line) | Chengyang | |||||
Jiaozhou | ||||||
Guangzhou Road | ||||||
JXK | ||||||