Fetchwikidata: | coordinates |
Bridge Name: | bhasaraghat Bridge |
Official Name: | Jangalkanya Setu |
Named For: | Jangalmahal |
Also Known As: | Nayagram-bhasaraghat bridge |
Carries: | Two paths, one way traffic for all the traffic on every way |
Crosses: | Subarnarekha River |
Locale: | Nayagram, Jhargram district, West Bengal, |
Design: | The bridge was designed by Design wing of P.W.D |
Width: | 12m (39feet) |
Traffic: | Road traffic |
Open: | 11 February 2016 |
Cost: | ₹ 170 crore |
Closed: | No |
Toll: | No |
Complete: | 2016 |
Jangalkanya Setu[1] or Bhasaraghat Bridge [2] [3] is a bridge located in Nayagram in Jhargram district, West Bengal.This bridge was launched in 2016. The bridge is about 1.47 km (0.915 mi) long built on Subarnarekha river. It is the longest bridge in West Bengal. On this day, about 95 kilometers of road to reach Kharagpur via Gobibalppur from Nayagram.To reach Kharagpur via the Nayagram-Keshiariyi, it is only 45 km to reach the 1.47 km long junctional bridge.The bridge was under the control of Midnapore Highway Sub-Division 2 P.W(ROADS)DTE.
Subarnarekha River was blocked by Nayagram and Keshri. The river blocked the communication of this area. In 2011, Chief Minister Mamata Banerjee announced the construction of the bridge of Vasraghat. But there were already temporary bridges which were constructed every year and during the rainy season, the concrete bridge would be broken. The construction of the bridge was completed in 2016. Bridge was inaugurated by Chief Minister Mamata Banerjee on 11 February 2016.
A passenger bus hit in bridge's railing after the 15 days of inauguration of the bridge on 26 February (2016) . The private bus was going from Midnapore to Nayagram with fifty passengers. The bus was moving very fast. The bus was hit by the pillar when the bus got out of the Jangalkanya bridge.