Jamaica Center–Parsons/Archer station explained

Jamaica Center–Parsons/Archer
Former:Jamaica Center–Parsons Boulevard (1988-circa 2004)
Accessible:yes
Address:Parsons Boulevard & Archer Avenue
Queens, NY
Borough:Queens
Locale:Jamaica
Coordinates:40.7024°N -73.8°W
Division:BMT/IND
Line:BMT Archer Avenue Line
IND Archer Avenue Line
Service:Archer
Connection:See Jamaica Center Bus Terminal
Platforms:2 island platforms (1 on each level)
Tracks:4 (2 on each level)
Levels:2
Structure:Underground

The Jamaica Center–Parsons/Archer station (formerly Jamaica Center–Parsons Boulevard station and sometimes shortened as Jamaica Center station) is the northern terminal station of the IND and BMT Archer Avenue Lines of the New York City Subway, located at Parsons Boulevard and Archer Avenue in Jamaica, Queens. It is served by E and J trains at all times, as well as Z trains during rush hours in the peak direction.

This station opened on December 11, 1988, as Jamaica Center–Parsons Boulevard, and was renamed in 2004. The station is a major transfer point for buses from eastern Queens, and replaces the old 160th Street and 168th Street stations of the BMT Jamaica Line; the Jamaica Center station is located near the site of the former. It is also near the site of the Long Island Rail Road's now-demolished Union Hall Street station.

History

Construction and opening

The plans for the Archer Avenue Lines emerged in the 1960s under the city and the Metropolitan Transportation Authority (MTA)'s Program for Action.[1] The Archer Avenue subway's groundbreaking took place on August 15, 1972, at Archer Avenue and 151st Street,[2] [3] and the station's design started on December 7, 1973. By July 1974, when the federal government announced its approval of a $51.1 million grant for the project, the Parsons Boulevard station was expected to be used by 8,700 passengers during rush hours.[4] Construction of two 200feet tunnels under the nine tracks of the LIRR Main Line in Jamaica began in January 1976. This section, connecting to the Archer Avenue Line's upper-level platform. started at Archer Avenue near 159th Street and ending about 150feet south of South Road near the Atlantic Branch, passing underneath the center of the York College campus.[5] The two tunnels were completed in May 1976;[6] south of these tunnel segments, the line would have been extended south several hundred yards, but this extension was never built.[7]

On September 26, 1980, $40 million of federal funding was transferred to the MTA to build the connection to the Jamaica Line, to complete the Parsons Boulevard station, and the installation of track along the line, including the section south of that station to South Road and 158th Street. Work continued on the connection to the Queens Boulevard Line. The project's opening date at this juncture was October 1984.[8] Plans for the station were completed in-house on June 17, 1981. Bids on the station construction were received on September 21, 1981, and was awarded to A. J. Pegno Construction Corporation for $22,425,415 . Work on the station commenced on October 12, 1981.[9]

Because of the 1975 New York City fiscal crisis, the Archer Avenue Line was never fully built to Springfield Boulevard, and was instead truncated to Parsons Boulevard. The shortened version of the line contained three stations and was 2miles long. In October 1980, the MTA considered stopping work on the line and on the 63rd Street Line, due to its budget crisis and the bad state of the existing subway system.[10] Due to lack of money, all bidding on new subway and bus projects for the MTA was suspended in 1981, except for the already-built portions of the 63rd Street and Archer Avenue lines, which were allowed to continue.[11] In September 1983, the project was 80 percent complete, and was expected to be in operation in fall 1985.[12] Construction was completed a year ahead of schedule, in 1983, but was delayed for several more years due to various disputes.[13] The station opened along with the rest of the Archer Avenue Line on December 11, 1988.[14] [15]

Post-opening

On December 14, 1991, a display titled "Astoria–Dreams of New York," a 32feet-long mural, consisting of seven portraits of first-generation Greek immigrants was removed from the station for not including any pictures of African Americans, seven days after going up.[16] The artist, Eugenia Marketou, called the decision "censorship of the worst kind." The piece was removed at the request of the directors of the Arts for Transit program after a negative public reaction, which included their defacement with graffiti and protest stickers. A dozen African American riders had complained to the agency. On the same date, a $70,000 sculpture called "Jamaica Center Stations Riders, Blue," which was created by well-known African American artist Sam Gilliam, was unveiled at the station. The sculpture was funded through the MTA Arts for Transit program, which allocates 1 percent of capital construction costs for art projects.[17] [18] After negotiations between Marketou and his agency took place, it was reinstalled on February 6, 1992, with a banner stating "Portraits of the Greek Immigrant Community" added in addition to the tile. In addition, Marketou agreed to appear in front of it during three rush hours to explain it. One of the photographs was removed in the following two weeks. The exhibit was only scheduled to stay until May 6, 1992.[19]

To save energy, the MTA installed variable-speed escalators at Jamaica Center–Parsons/Archer and three other subway stations in August 2008,[20] although not all of the escalators initially functioned as intended.[21]

In 2020, the MTA announced that it would reconstruct the track and third rail on the IND Archer Avenue Line, which had become deteriorated. From September 19 to November 2, 2020, E service was cut back to Jamaica–Van Wyck, with a shuttle bus connecting to Sutphin Boulevard and Jamaica Center.[22] [23] The MTA then announced it would reconstruct the track on the BMT Archer Avenue Line. Starting on July 1, 2022, J service was cut back to 121st Street, and Z service was temporarily discontinued,[24] with a shuttle bus connecting to Sutphin Boulevard and Jamaica Center.[25] The work was completed in September 2022.[26] The lower-level platform underwent structural and esthetic renovations in mid-2023.[27]

Station layout

The Jamaica Center–Parsons/Archer station contains two levels, each with two tracks and an island platform.[28] The E train serves the upper level (IND)[28] at all times. The J and Z trains serve the lower level (BMT);[28] the former operates all times and the latter operates during rush hours in the peak direction. The station is the eastern terminus of all service; the next stop to the west is Sutphin Boulevard–Archer Avenue–JFK Airport. Like the other stations on the Archer Avenue Line, Jamaica Center–Parsons/Archer is fully ADA-accessible.[29] Both platforms are 600feet in length, standard for a full-length B Division train; however, since BMT Eastern Division trains are only 480feet long, there are fences at both of the unused ends of the lower-level platforms to prevent passengers from falling onto the tracks.

As with other stations constructed as part of the Program for Action, the Jamaica Center–Parsons/Archer station contained technologically advanced features such as air-cooling, noise insulation, CCTV monitors, public announcement systems, electronic platform signage, and escalator and elevator entrances.[30] This station has ten escalators and two elevators.

This station has tan brick walls and red brick floor on both levels. The coved trapezoidal ceilings are suspended and have metal slats.

Exits

There are two entrances to this station. The first one is at the very east end of the station and connects with Parsons Boulevard. It contains a mezzanine that has four escalators, two to each platform, and an ADA-accessible elevator serving both platforms. There is a large, single bank of turnstiles with nine turnstiles leading to fare control.[28] One wide staircase and one escalator leads to a pavilion behind the streets at the northeast corner of Parsons Boulevard and Archer Avenue. A narrower staircase and escalator leads to the southeast corner.[28] An elevator is present near the southeast corner of the intersection.[31] This entrance contains a 1991 artwork called Jamaica Center Station Riders by Sam Gilliam made up of blue painted aluminum.[32]

The second exit is near the middle of the platforms and connects with 153rd Street. Each platform contains two escalators to the mezzanine; the upper level also has one staircase to the mezzanine, while the lower level has two. In this mezzanine, there are fire regular turnstiles, five High Entry-Exit Turnstiles, and two high exit-only turnstiles.[28] This entrance has three street stairs; two of them, one of which also has an up-only escalator, lead up to the south side of Archer Avenue outside the bus boarding area.[28] [32] The staircase with the escalator has a brickwork design surrounding it while the other staircase at this entrance has an ultra-wide green metal fence. There is another staircase at the northeast corner of Archer Avenue and 153rd Street.[32]

Infrastructure

West of the station, both levels feature diamond crossovers, which are halfway between this station and Sutphin Boulevard–Archer Avenue.

The tracks on both levels extend past the station for possible future extensions, but are currently used for storage.[33] On the lower level, they continue one train length of about 480feet and end at bumper blocks at 160th Street;[33] [34] they were originally planned to extend as far as Merrick Boulevard.[34] This was a planned extension toward 190th Street–Hollis Avenue (near the Hollis LIRR station). Where the lower level tracks end, there is a provision for a diamond crossover switch at the end of the tunnel (under 160th Street).[34] On the upper level, the tracks extend around or just over 3 train lengths of about 600feet, curving south under the LIRR Atlantic Branch below ground. They then run under 160th Street within the York College campus and end at bumper blocks near Tuskegee Airmen Way (formerly South Road).[33] [34] [35] [36] This was the site of the line's original groundbreaking in 1973. The plan was for this line to use the LIRR Locust Manor Branch (Atlantic) ROW and run to Springfield Boulevard or Rosedale LIRR station.[36] [37] [34] Where the upper level tracks stub end, there is a provision for a portal to go outside if the line going to Southeastern Queens is ever built.[37] [34] The tunnel was originally planned to curve west towards the Atlantic ROW just north of Liberty Avenue, running underneath the York College Athletic Field.

East of the upper-level platform, a Central Instrument Room (753CIR) is located deep in the tunnel on track D2A (upper level) bench wall.

East of the station, next to the D1A tail track on the upper level, the tunnel catwalk structure widens, and the track curves south along with the D2A track. Where the catwalk structure ends, there is a stairway to the lower level tail tracks.

Ridership

In 2018, the station had 10,681,269 boardings, making it the 27th most used station in the -station system. This amounted to an average of 922,959 passengers per weekday.

Jamaica Center Bus Terminal

See also: List of bus routes in Queens and List of bus routes in Nassau County, New York.

The subway complex includes the Jamaica Center Bus Terminal, a series of bus stops located along Archer Avenue (primarily along the south side of the street next to the LIRR right of way). The bus stop areas are lettered A through H. The western portion of the terminal (bays F through H and the bus layover area) is also known as the "Teardrop Canopy".[38] It serves as a major transit hub within Jamaica.[32] The former 160th Street Jamaica Elevated station on Jamaica Avenue that it replaced was also a major hub for trolley service when it was originally built. Several of the trolley lines were the predecessors to current bus service.[39] [40]

Jamaica Center is also a hub for dollar vans in the New York metropolitan area.

RouteJamaica terminal
(if not the Jamaica Center Bus Terminal)
Other terminalviaNotes
MTA Bus
valign=top

Q6

165th Street Bus TerminalJFK International AirportJamaica Avenue, Sutphin Boulevard,
Rockaway Boulevard, North Boundary Road
valign=top

Q6 LTD

165th Street Bus TerminalJFK International AirportJamaica Avenue, Sutphin Boulevard,
Rockaway Boulevard, North Boundary Road
Limited bus route to JFK Airport
valign=top

Q8

165th Street Bus TerminalSpring CreekJamaica Avenue, 101st Avenue, Fountain Avenue
valign=top

Q9

165th Street Bus TerminalSouth Ozone ParkJamaica Avenue, Supthin Boulevard, Liberty Avenue,
135th Street (Northbound), Van Wyck ExpresswayService Road (Southbound), Lincoln Street
valign=top

Q25

Sutphin Boulevard–Archer Avenue
– JFK Airport Subway station
College PointParsons Boulevard, Kissena Boulevard, 127th Street
valign=top

Q25 LTD

Sutphin Boulevard–Archer Avenue
– JFK Airport Subway station
College PointParsons Boulevard, Kissena Boulevard, 127th StreetLimited route to College Point
valign=top

Q34

Sutphin Boulevard–Archer Avenue
– JFK Airport Subway station
WhitestoneParsons Boulevard, Kissena Boulevard, Union Street
valign=top

Q41

165th Street Bus TerminalHoward Beach127th Street, 109th Avenue, Cross Bay Boulevard
valign=top

Q65

Sutphin Boulevard–Archer Avenue
– JFK Airport Subway station
College Point164th Street, 45th Avenue, College Point BoulevardOriginally the NY&QC Flushing-Jamaica and College Point trolley lines
valign=top

Q110

Parsons Boulevard Subway station or
Jamaica–179th Street Subway station
Belmont ParkJamaica Avenue, Hempstead Avenue
valign=top

Q111

Parsons Boulevard Subway stationRosedale or CedarhurstAll trips: Guy R. Brewer Boulevard, 147th Avenue,
Cedarhurst trips: Rosedale Road, Peninsula Boulevard
Originally Queens portion of the LIER Far Rockaway Line
valign=top

Q112

Parsons Boulevard Subway stationOzone ParkSouth Road, Liberty Avenue
valign=top

Q113 LTD

Parsons Boulevard Subway stationFar RockawayGuy R. Brewer Boulevard, Rockaway Boulevard,
Nassau Expressway
  • Originally the LIER Far Rockaway Line
  • Evenings and overnights, Q114 buses operate local; no Q113 service operates at this time.
valign=top

Q114 LTD

Guy R. Brewer Boulevard, 147th Avenue, Rockaway Turnpike
NYCT Bus
valign=top

Q4

to Cambria HeightsMerrick Boulevard, Linden Boulevard
valign=top

Q4 LTD

to Cambria HeightsMerrick Boulevard, Linden BoulevardLimited bus route to Cambria Heights
valign=top

Q5

to Rosedale or Green Acres Mall, Valley StreamAll trips: Merrick Boulevard, Hook Creek Boulevard
Green Acres trips: Sunrise Highway
valign=top

Q5 LTD

to RosedaleMerrick Boulevard, Hook Creek BoulevardLimited bus route to Rosedale
valign=top

Q20A

Merrick Boulevard and Archer AvenueCollege Point
  • All trips: Archer Avenue, Main Street, Union Street
  • Q20A: 20th Avenue
  • Q20B: 14th Avenue
valign=top

Q20B

valign=top

Q24

168th Street and Archer AvenueBushwickJamaica/Archer Avenues, Atlantic Avenue, Broadway (Brooklyn)
valign=top

Q30

to Little Neck or BaysideAll trips: Homelawn Street, Utopia Parkway, Horace Harding Expressway
Bayside trips: Springfield Boulevard
valign=top

Q31

to BaysideJamaica/Archer Avenues, Homelawn Street, Utopia Parkway,
47th/48th Avenues, Bell Boulevard, Francis Lewis Boulevard
valign=top

Q42

to Addisleigh ParkLiberty Avenue, 174th Street, Sayres Avenue
valign=top

Q44 SBS

Merrick Boulevard and Archer AvenueWest FarmsArcher Avenue, Main Street, Union Street, Parsons Boulevard,
Whitestone Expressway, Cross Bronx Expressway
Travels via the Whitestone Bridge between Queens and the Bronx
valign=top

Q54

170th Street & Jamaica AvenueWilliamsburg Bridge Plaza Bus TerminalJamaica Avenue, Metropolitan Avenue, Grand StreetSuccessors to BMT streetcar service
valign=top

Q56

Broadway JunctionJamaica Avenue
valign=top

Q83

Parsons Boulevard Subway stationCambria Heights or Queens Village (late nights only)Liberty Avenue, Murdock Avenue
valign=top

Q84

to LaureltonMerrick Boulevard, 120th Avenue
valign=top

Q85

to Rosedale or Green Acres Mall, Valley StreamAll trips: Merrick Boulevard, Bedell Street, Conduit Avenue
Rosedale trips: 243rd Street
Green Acres trips: Green Acres Road
Part of the former NY&LIT Brooklyn-Freeport Line
NICE Bus
valign=top

n4

to FreeportMerrick Road, Merrick BoulevardPart of the former NY&LIT Brooklyn-Freeport Line
valign=top

n4X

to FreeportMerrick Road, Merrick BoulevardExpress to Freeport Station

Nearby points of interest

External links

Notes and References

  1. Web site: Full text of "Metropolitan transportation, a program for action. Report to Nelson A. Rockefeller, Governor of New York." . Internet Archive . November 7, 1967 . April 22, 2020.
  2. News: Shapiro . Hal . August 16, 1972 . A Groundbreaking... With an Eye on the El . Long Island Press.
  3. News: McCallum . Ann . February 3, 1974 . Something Big Under Archer Avenue–a Subway . 9 . Long Island Press.
  4. News: Portnoy . Sandra . July 3, 1974 . U.S. Puts $51 Million in Archer Ave. Turnstile . Long Island Press.
  5. News: Rabin . Bernard . March 6, 1975 . New Subway's Burrowing Along . New York Daily News . live . September 5, 2019 . https://web.archive.org/web/20190905201947/https://www.newspapers.com/clip/35645755/daily_news/ . September 5, 2019.
  6. News: May 23, 1976 . 2 Jamaica Tunnels Completed . Long Island Press.
  7. News: Rabin . Bernard . September 26, 1980 . Archer Ave. Subway Gets $40 Million Fed Boost . New York Daily News . live . September 5, 2019 . https://web.archive.org/web/20190905201923/https://www.newspapers.com/clip/35645803/daily_news/ . September 5, 2019.
  8. News: Logan . Betti . September 26, 1980 . U.S. Pledges Aid For Archer Ave. Subway Project . Newsday.
  9. Web site: Archer Avenue Extension Ceremony 1988. December 1988. New York City Transit Authority.
  10. News: Allen . Joy . October 11, 1980 . Manes Warns MTA on Subways Vows to Fight Any Move to Suspend Extension of Two Lines to Pay for Maintenance. . Newsday.
  11. News: Cummings . Judith . February 25, 1981 . Subway Maintenance Cited As 'Emergency'; Bddng Is Suspended . en-US . The New York Times . live . September 16, 2017 . https://web.archive.org/web/20170916054422/http://www.nytimes.com/1981/02/25/nyregion/subway-maintenance-cited-as-emergency-bidding-is-suspended.html . September 16, 2017 . 0362-4331.
  12. News: Rabin . Bernard . September 26, 1983 . Archer Ave. Subway 2 Years Away: MTA . New York Daily News . live . September 5, 2019 . https://web.archive.org/web/20190905201920/https://www.newspapers.com/clip/35645607/daily_news/ . September 5, 2019.
  13. News: Schmalz . Jeffrey . August 18, 1985 . U.S. Holds Up Ad For Subway Work . The New York Times . live . February 5, 2017 . https://web.archive.org/web/20150524170818/http://www.nytimes.com/1985/08/18/nyregion/us-holds-up-aid-for-subway-work.html . May 24, 2015 . 0362-4331.
  14. News: Anders . Marjorie . Associated Press . December 11, 1988 . Subways Get Biggest Change Since 1904 . I1 . Nyack Journal News . April 17, 2020 . fultonhistory.com.
  15. Web site: Johnson . Kirk . December 9, 1988 . Big Changes For Subways Are to Begin . April 17, 2020 . The New York Times.
  16. News: Settling a Subway Art Dispute, Artfully: Photos Are Reinstalled but Artist Must Explain Her Work to Critics. Finder. Alan. February 7, 1992. The New York Times. June 10, 2024.
  17. News: Am I Blue? Just Ask IND's New Sculpture. Leahy. Jack. December 15, 1991. New York Daily News.
  18. News: Art Exhibit Goes Off the Wall. Cox. Robert B.. December 20, 1991. Newsday.
  19. News: Subway Exhibit Reinstalled. February 18, 1992. Newsday.
  20. News: Chan . Sewell . August 6, 2008 . M.T.A. Rolls Out Escalators With Conservation Features . en-US . The New York Times . October 10, 2022 . 0362-4331.
  21. Web site: Chan . Sewell . August 11, 2008 . Bumpy Start for 'Green' Subway Escalators . October 10, 2022 . The New York Times.
  22. Web site: August 17, 2020. Press Release – NYC Transit – MTA to Perform Critical Track Replacement Work at End of E Line in Queens Next Month. August 18, 2020. MTA. August 18, 2020. https://web.archive.org/web/20200818094440/http://www.mta.info/press-release/nyc-transit/mta-perform-critical-track-replacement-work-end-e-line-queens-next-month. live.
  23. Web site: Pozarycki. Robert. August 28, 2020. Two Queens Meetings on Major Track Work at End of E Line in Jamaica. September 19, 2020. amNewYork. en-US. September 29, 2020. https://web.archive.org/web/20200929011118/https://www.amny.com/transit/two-queens-meetings-on-major-track-work-at-end-of-e-line-in-jamaica/. live.
  24. Web site: MTA to alter service to complete track replacement project . Spectrum News NY1 New York City . June 3, 2022 . June 30, 2022 . June 30, 2022 . https://web.archive.org/web/20220630155734/https://www.ny1.com/nyc/all-boroughs/transit/2022/06/03/mta-to-alter-service-to-complete-track-replacement-project . live .
  25. Web site: Parry . Bill . MTA track replacement work will shut down J and Z lines in southeast Queens for much of summer . QNS.com . June 6, 2022 . June 30, 2022.
  26. Web site: MTA to begin final phase of critical track replacement work in Queens next month . Railway Track and Structures . June 6, 2022 . June 30, 2022 . June 13, 2022 . https://web.archive.org/web/20220613082045/https://www.rtands.com/track-construction/mta-to-begin-final-phase-of-critical-track-replacement-work-in-queens-next-month/ . live .
  27. Web site: Parry . Bill . MTA refurbishes subway station in Jamaica, offering riders a safer, cleaner experience . QNS.com . June 26, 2023 . January 15, 2024.
  28. Book: Jamaica Rezoning Final Environmental Impact Statement . . 17.4 . 17: Transit and Pedestrians . April 1, 2021 . 2007.
  29. Web site: MTA Accessible Stations. January 27, 2021. MTA. en.
  30. News: Burks. Edward C.. August 7, 1976. New York Improving Subways, But Still Trails Foreign Cities. en-US. The New York Times. July 14, 2022. 0362-4331.
  31. Web site: MTA Accessible Stations . MTA . July 11, 2022 . January 20, 2023.
  32. Web site: MTA Neighborhood Maps: Jamaica. mta.info. Metropolitan Transportation Authority. June 30, 2015. 2015.
  33. Book: Queens Subway Options Study, New York: Environmental Impact Statement. July 10, 2016. May 1984. United States Department of Transportation, Metropolitan Transportation Authority, Urban Mass Transit Administration. 83–.
  34. Book: Archer Ave Route (Proposed) Construction, Queens: Environmental Impact Statement. August 6, 2016. August 1973. Urban Mass Transit Administration, United States Department of Transportation.
  35. Web site: Burks. Edward C.. Building Progresses On Subway In Jamaica. The New York Times. September 27, 2015. March 9, 1975.
  36. Web site: Burks. Edward C.. Coming: Light at End of 63d St. Tunnel. The New York Times. September 27, 2015. September 24, 1976.
  37. Web site: Burks. Edward C.. Work Begun on Queens Subway Extension. The New York Times. September 26, 2015. October 24, 1973.
  38. Web site: Jamaica Bus Improvement Study. nyc.gov. New York City Department of Transportation. April 10, 2016. May 17, 2011.
  39. Web site: Seyfried, Vincent F.. Vincent F. Seyfried. Full Text of "Story of the Long Island Electric Railway and the Jamaica Central Railways, 1894–1933 /". archive.org. F. E. Reifschneider. December 20, 2015. 1961.
  40. Web site: Seyfried, Vincent F.. Vincent F. Seyfried. Full Text of "New York and Queens County Railway and the Steinway Lines, 1867–1939.". archive.org. Vincent F. Seyfried. December 20, 2015. 1950.
  41. Web site: MTA Neighborhood Maps: Jamaica. 2015. mta.info. Metropolitan Transportation Authority. April 12, 2020.