Jakarta Outer Ring Road | |
Translation: | Jalan Tol Lingkar Luar Jakarta |
Lang: | id |
Image Notes: | Southbound Jakarta Outer Ring Road heading to Kembangan, West Jakarta in 2023 |
Type: | tollroad |
Length Km: | 65 |
Formed: | 10 October 1990 |
Direction A: | West |
Terminus A: | Penjaringan |
Direction B: | East |
Terminus B: | Tanjung Priok |
Country: | IDN |
The Jakarta Outer Ring Road (id|Jalan Tol Lingkar Luar Jakarta, abbreviated JORR) is a tolled ring road encircling Jakarta, Indonesia. It is divided into 7 sections, totalling up to 65km (40miles).[1] The JORR is managed by four toll road companies: Jakarta Lingkar Baratsatu, Marga Lingkar Jakarta, Hutama Karya and .[2]
Section | Route | Length | Opened | |
---|---|---|---|---|
JORR W1 | Penjaringan–Kembangan | 8.65km (05.37miles) | 2010 | |
JORR W2 Section 1 | Kembangan–Joglo | 5.61km (03.49miles) | 2013 | |
JORR W2 Section 2 | Joglo–Ulujami | 2.04km (01.27miles) | 2014 | |
JORR W2 Section 3 | Ulujami–Veteran | 1.3km (00.8miles) | 2005 | |
JORR W2 Section 4 | Veteran–Pondok Indah | 2.26km (01.4miles) | 2003 | |
JORR S | Pondok Pinang–Jagorawi (TB Simatupang Toll Road) | 14.25km (08.85miles) | 1995 | |
JORR E1 Section 1 | Kampung Rambutan–Ceger | 1km (01miles) | 2003 | |
JORR E1 Section 2 | Ceger–Hankam | 3.1km (01.9miles) | 2003 | |
JORR E1 Section 3 | Hankam–Jati Asih | 4.4km (02.7miles) | 2006 | |
JORR E1 Section 4 | Jati Asih–Cikunir Interchange | 3.9km (02.4miles) | 2007 | |
JORR E2 | Cikunir Interchange–Cakung | 9.07km (05.64miles) | 1990 | |
JORR E3 | Cakung–Cilincing | 4.8km (03miles) | 2007 | |
JORR N | Cilincing–Tanjung Priok | 5km (03miles) | 2017 |
Rp | Rp | Rp | Rp | Rp |
Notes: Direction of the toll road is in looping manner.